(a) Since the interconnection regime in India has evolved on a bilateral basis, there is no immediate need to establish a framework of Interconnect Exchange at this late stage, as it would not serve any useful purpose.
(b) Interconnect exchange will be additional cost burden on industry without any additional benefit. This is because majority of the TSPs have established bilateral POIs after making large investments and, hence, interconnect exchange will be an additional/unproductive cost burden. Direct peering, both for TDM as well as for IP technology, is the only economical option at the high volume presently being handled by the POIs. This is evident from the fact that TSPs have established peer-to-peer connectivity, instead of using any kind of transit/interconnecting points, not only for TDM connectivity but also for IP connectivity. Therefore, the option of exchanging traffic only through interconnection exchange should be ruled out at the very outset.
(c) Presently, TSPs are connected via POIs in several cities and towns. POI locations are presently based on low-cost routing. Interconnect Exchange will prevent the use of shortest path leading to the increase in latency and congestion in the network. Introduction of the interconnect exchange will also entail redesigning the transmission network for the POI traffic, which involves additional costs and huge write-offs.
(d) TRAI in its Direction on "Direct connectivity between networks of Service Providers" vide File No. 101-13/2003-MN dated 22.07.2003 has acknowledged that transiting the traffic entails avoidable costs and accordingly justified the need for direct connectivity.
(e) The required Interconnect Exchange will be of very large capacity - equivalent to the combined size of the STP Networks deployed by all TSPs. By no means, Interconnect Exchange can be compared with MNP exchange as the size and scale of a MNP Exchange is merely 5 to 7% of subscribers opting of MNP every month.
(f) The failure of the interconnect exchange would bring down the entire telecom network.
(a) An interconnect exchange would help significantly in speeding up the process of Interconnection as a New TSP would not have to negotiate individual interconnection agreements with each TSP, who being their competitors, have no reason to cooperate.
(b) Given the amount of delays experienced in obtaining interconnection agreements, the interconnect exchange will remove all bilateral interconnect issues and remove a significant entry barrier into the telecommunication industry and thereby opening up the telecommunication industry to newer players, which will enhance competition and benefit the end consumers. The Authority must provide a glide path to move towards an interconnect exchange over a period of time. A glide path is proposed since all TSPs have already established interconnection and borne the requisite costs and laid the infrastructure to establish interconnection. Therefore, mandating Interconnect Exchange would be an additional cost for the TSPs, which may be incurred with an appropriate glide path.
F. Review
[Schedule II]
Note 1: The principal regulations were published vide F.No.10-10/2016-BB&PA dated 01.01.2018 (1 of 2018).
Note 2: The Explanatory Memorandum explains the objects and reasons of the Telecommunication Interconnection (Amendment) Regulations, 2018 (4 of 2018).
Explanatory Memorandum to "The Telecommunication Interconnection (Amendment) Regulation, 2018 dated 05.07.2018
Explanatory Memorandum to "The Telecommunication Interconnection (Amendment) Regulation, 2018 dated 05.07.2018
(a) After conversion of the ports from two way to one way as per the regulation, what will be the status of existing annual port charges being paid between the TSPs.
(b) Since TRAI has already prescribed 0.5% POI congestion norm through QoS regulations, there may be no need to have an additional norm of bringing down the POIs capacity utilisation to less than 60%. According to them, currently the POIs are being utilized till as high as 85%-90% of their capacity while still complying with the QoS norm. However, the regulation has specified utilization of POIs to be as low as 60%-70% which is uncalled for as it will lead to inefficient use of network resources leading to unnecessary cost implications.
(c) For provisioning of ports in time bound manner, they suggested that in line with the existing practice, the seeker should continue to make a forecast of required port capacity for the next 6 months to enable the other party to dimension its network accordingly.
(d) According to service providers, the augmentation of POI capacity is a complex process requiring involvement of multiple domains such as core, transmission, and switching etc. and various technical, commercial, procurement and logistic issues pertaining to these domains and therefore, the time frame of 21 days specified in Regulation becomes a challenge.
A. Analysis of the Key Issues raised in "The draft Telecommunication Interconnection (Amendment) Regulations, 2018" issued on 08.05.2018.
(i) In regulation 6 of the Telecommunication Interconnection Regulations, 2018 (1 of 2018) (hereinafter referred to as the principal regulations), after sub-regulation (3) the following proviso shall be inserted, namely:-
"Provided that the port charges and infrastructure charges for all ports provided before the 1st February, 2018 shall continue to be payable as per the terms and conditions which were applicable to them before the 1st February, 2018."
(ii) For regulation 8 of the principal regulations, the following regulation shall be substituted:
Request for augmentation of POIs. - (1) Each service provider shall provide its forecast of busy hour outgoing traffic for each POI, at intervals of every six months, to the interconnecting service provider and the first such forecast shall be provided within sixty days of the commencement of "The Telecom Interconnection (Amendment) Regulations, 2018" and thereafter on the 1st April and 1st October every year.
Request for augmentation of POIs.
(2) A service provider may request the other service provider for additional ports at a POI, if the projected utilisation of the capacity of such POI, calculated in the manner as contained in schedule II to these regulations, at the end of sixty days from the date of placing the request, is likely to be more than eighty-five percent and such projected utilization of the capacity of POI shall be determined on the basis of the daily traffic for the preceding sixty days at the POI during busy hour:
Provided that the service provider shall request for such number of additional ports which is likely to bring the utilization of the capacity of such POI, at the end of sixty days from the date of making request, to less than seventy-five percent."
(iii) In regulation 9 of the principal regulations,
(a) in sub-regulation (1), for the words "five working days", the words "seven working days" shall be substituted;
(b) in sub-regulation (2), for the words "three working days", the words "five working days" shall be substituted;
(c) in sub-regulation (3), for the words "five working days", wherever occurring, the words "ten working days" shall be substituted;
(d) in sub-regulation (4), for the words "three working days", the words "ten working days" shall be substituted;
(e) in sub-regulation (5), for the words "five working days", the words "ten working days" shall be substituted;
(iv) After schedule I to the principal regulations, the following schedule shall be inserted, namely:-
"Schedule II
(1) In regulation 6 of the Telecommunication Interconnection Regulations, 2018 (1 of 2018) (hereinafter referred to as the principal regulations), after sub-regulation (3) the following proviso shall be inserted, namely:-
(1) In regulation 6 of the Telecommunication Interconnection Regulations, 2018 (1 of 2018) (hereinafter referred to as the principal regulations), after sub-regulation (3) the following proviso shall be inserted, namely:-
"Provided that the port charges and infrastructure charges for all ports provided before the 1st February, 2018 shall continue to be payable as per the terms and conditions which were applicable to them before the 1st February, 2018."
"Provided that the port charges and infrastructure charges, for all ports provided before the 1st February, 2018, shall continue to be payable as per the terms and conditions which were applicable to them before the 1st February, 2018."
(1) For regulation 8 of the principal regulations, the following regulation shall be substituted:
(1) For regulation 8 of the principal regulations, the following regulation shall be substituted:
Request for augmentation of POIs. - (1) Each service provider shall provide its forecast of busy hour outgoing traffic for each POI, at intervals of every six months, to the interconnecting service provider and the first such forecast shall be provided within sixty days of the commencement of "The Telecom Interconnection (Amendment) Regulations, 2018" and thereafter on the 1st April and 1st October every year.
Request for augmentation of POIs.
(2) A service provider may request the other service provider for additional ports at a POI, if the projected utilisation of the capacity of such POI, calculated in the manner as contained in schedule II to these regulations, at the end of sixty days from the date of placing the request, is likely to be more than eighty-five percent and such projected utilization of the capacity of POI shall be determined on the basis of the daily traffic for the preceding sixty days at the POI during busy hour:
Provided that the service provider shall request for such number of additional ports which is likely to bring the utilization of the capacity of such POI, at the end of sixty days from the date of making request, to less than seventy-five percent."
Request for augmentation of POIs. - (1) Every service provider shall provide to the interconnecting service provider, at interval of every six months, its forecast of busy hour outgoing traffic, for the succeeding six months, at each POI and the first such forecast shall be provided within sixty days of the commencement of the Telecommunication Interconnection (Amendment) Regulations, 2018 and thereafter on the 1st April and 1st October every year.
Request for augmentation of POIs.
(2) A service provider may request the other service provider for additional ports at a POI, if the projected utilisation of the capacity of such POI, calculated in the manner as contained in schedule II to these regulations, at the end of sixty days from the date of placing of the request, is likely to be more than eighty-five percent and such projected utilization of the capacity of POI shall be determined on the basis of the daily traffic for the preceding sixty days at the POI during busy hour:
Provided that the service provider shall request for such number of additional ports which is likely to bring the utilization of the capacity of such POI, at the end of sixty days from the date of making request, to less than seventy-five percent."
(3) In regulation 9 of the principal regulations,
(a) in sub-regulation (1), for the words "five working days", the words "seven working days" shall be substituted;
(b) in sub-regulation (2), for the words "three working days", the words "five working days" shall be substituted;
(c) in sub-regulation (3), for the words "five working days", wherever occurring, the words "ten working days" shall be substituted;
(d) in sub-regulation (4), for the words "three working days", the words "ten working days" shall be substituted;
(e) in sub-regulation (5), for the words "five working days", the words "ten working days" shall be substituted;
(a) A service provider, upon receipt of request of ports and collocation space, if required, shall issue letter of acceptance and demand note, if any, within seven working days of the receipt of request.
(b) A service provider, upon receipt of the demand note, shall pay the amount, if any, within five working days from the date of receipt of demand note.
(c) The service provider, who issued the letter of acceptance, shall intimate the requesting service provider about the provisioning of the requested ports at the POI and allocation of collocation space, if applicable,--
(i) within ten working days from the date of issue of its letter of acceptance, in case no demand note was issued; and
(ii) within ten working days from the date of receipt of payment from the requesting service provider against the demand note, in case a demand note was issued.
(d) A service provider, upon receipt of the intimation about provisioning of the port and allocation of the collocation space, if applicable, shall, within ten working days of the receipt of the intimation, intimate the other service provider about establishment of transmission link between the POIs of the two service providers.
(e) A service provider, upon receipt of the intimation about establishment of transmission link between the POIs, shall, within ten working days of the receipt of the intimation, carry out acceptance testing and issue final letter of commissioning of the ports to the other service provider.
Maximum period (in working days) for service
provider-2 to issue letter of acceptance and demand note, if any,
upon receipt of request of ports and collocation space from
service provider-1
7
Maximum period (in working days) for service
provider-1 to pay the amount from the date of receipt of the
demand note
5
Maximum period (in working days) for service
provider-2 to intimate service provider-1 about the provisioning
of the requested ports at the POI and allocation of collocation
space
10
Maximum period (in working days) for service
provider-1 to intimate service provider-2 about establishment of
transmission link between the POIs
10
Maximum period (in working days) for service
provider-2 to carry out acceptance testing and issue final letter
of commissioning of the ports
10
Section 20 • Telecommunication Interconnection Regulations, 2018
20. Whether there is a need to establish a framework for Interconnect Exchange to eliminate bilateral interconnection issues?
telecommunication-interconnection-regulations-2018-sec-20.json
•
Section 20
{
"act_title": "Telecommunication Interconnection Regulations, 2018",
"act_slug": "telecommunication-interconnection-regulations-2018",
"section_label": "Section",
"section": {
"number": "20",
"title": "20. Whether there is a need to establish a framework for Interconnect Exchange to eliminate bilateral interconnection issues?",
"chapter": null,
"content": "(a) Since the interconnection regime in India has evolved on a bilateral basis, there is no immediate need to establish a framework of Interconnect Exchange at this late stage, as it would not serve any useful purpose.\n(b) Interconnect exchange will be additional cost burden on industry without any additional benefit. This is because majority of the TSPs have established bilateral POIs after making large investments and, hence, interconnect exchange will be an additional/unproductive cost burden. Direct peering, both for TDM as well as for IP technology, is the only economical option at the high volume presently being handled by the POIs. This is evident from the fact that TSPs have established peer-to-peer connectivity, instead of using any kind of transit/interconnecting points, not only for TDM connectivity but also for IP connectivity. Therefore, the option of exchanging traffic only through interconnection exchange should be ruled out at the very outset.\n(c) Presently, TSPs are connected via POIs in several cities and towns. POI locations are presently based on low-cost routing. Interconnect Exchange will prevent the use of shortest path leading to the increase in latency and congestion in the network. Introduction of the interconnect exchange will also entail redesigning the transmission network for the POI traffic, which involves additional costs and huge write-offs.\n(d) TRAI in its Direction on \"Direct connectivity between networks of Service Providers\" vide File No. 101-13/2003-MN dated 22.07.2003 has acknowledged that transiting the traffic entails avoidable costs and accordingly justified the need for direct connectivity.\n(e) The required Interconnect Exchange will be of very large capacity - equivalent to the combined size of the STP Networks deployed by all TSPs. By no means, Interconnect Exchange can be compared with MNP exchange as the size and scale of a MNP Exchange is merely 5 to 7% of subscribers opting of MNP every month.\n(f) The failure of the interconnect exchange would bring down the entire telecom network.\n(a) An interconnect exchange would help significantly in speeding up the process of Interconnection as a New TSP would not have to negotiate individual interconnection agreements with each TSP, who being their competitors, have no reason to cooperate.\n(b) Given the amount of delays experienced in obtaining interconnection agreements, the interconnect exchange will remove all bilateral interconnect issues and remove a significant entry barrier into the telecommunication industry and thereby opening up the telecommunication industry to newer players, which will enhance competition and benefit the end consumers. The Authority must provide a glide path to move towards an interconnect exchange over a period of time. A glide path is proposed since all TSPs have already established interconnection and borne the requisite costs and laid the infrastructure to establish interconnection. Therefore, mandating Interconnect Exchange would be an additional cost for the TSPs, which may be incurred with an appropriate glide path.\nF. Review\n[Schedule II]\nNote 1: The principal regulations were published vide F.No.10-10/2016-BB&PA dated 01.01.2018 (1 of 2018).\nNote 2: The Explanatory Memorandum explains the objects and reasons of the Telecommunication Interconnection (Amendment) Regulations, 2018 (4 of 2018).\nExplanatory Memorandum to \"The Telecommunication Interconnection (Amendment) Regulation, 2018 dated 05.07.2018\nExplanatory Memorandum to \"The Telecommunication Interconnection (Amendment) Regulation, 2018 dated 05.07.2018\n(a) After conversion of the ports from two way to one way as per the regulation, what will be the status of existing annual port charges being paid between the TSPs.\n(b) Since TRAI has already prescribed 0.5% POI congestion norm through QoS regulations, there may be no need to have an additional norm of bringing down the POIs capacity utilisation to less than 60%. According to them, currently the POIs are being utilized till as high as 85%-90% of their capacity while still complying with the QoS norm. However, the regulation has specified utilization of POIs to be as low as 60%-70% which is uncalled for as it will lead to inefficient use of network resources leading to unnecessary cost implications.\n(c) For provisioning of ports in time bound manner, they suggested that in line with the existing practice, the seeker should continue to make a forecast of required port capacity for the next 6 months to enable the other party to dimension its network accordingly.\n(d) According to service providers, the augmentation of POI capacity is a complex process requiring involvement of multiple domains such as core, transmission, and switching etc. and various technical, commercial, procurement and logistic issues pertaining to these domains and therefore, the time frame of 21 days specified in Regulation becomes a challenge.\nA. Analysis of the Key Issues raised in \"The draft Telecommunication Interconnection (Amendment) Regulations, 2018\" issued on 08.05.2018.\n(i) In regulation 6 of the Telecommunication Interconnection Regulations, 2018 (1 of 2018) (hereinafter referred to as the principal regulations), after sub-regulation (3) the following proviso shall be inserted, namely:-\n\"Provided that the port charges and infrastructure charges for all ports provided before the 1st February, 2018 shall continue to be payable as per the terms and conditions which were applicable to them before the 1st February, 2018.\"\n(ii) For regulation 8 of the principal regulations, the following regulation shall be substituted:\nRequest for augmentation of POIs. - (1) Each service provider shall provide its forecast of busy hour outgoing traffic for each POI, at intervals of every six months, to the interconnecting service provider and the first such forecast shall be provided within sixty days of the commencement of \"The Telecom Interconnection (Amendment) Regulations, 2018\" and thereafter on the 1st April and 1st October every year.\nRequest for augmentation of POIs.\n(2) A service provider may request the other service provider for additional ports at a POI, if the projected utilisation of the capacity of such POI, calculated in the manner as contained in schedule II to these regulations, at the end of sixty days from the date of placing the request, is likely to be more than eighty-five percent and such projected utilization of the capacity of POI shall be determined on the basis of the daily traffic for the preceding sixty days at the POI during busy hour:\nProvided that the service provider shall request for such number of additional ports which is likely to bring the utilization of the capacity of such POI, at the end of sixty days from the date of making request, to less than seventy-five percent.\"\n(iii) In regulation 9 of the principal regulations,\n(a) in sub-regulation (1), for the words \"five working days\", the words \"seven working days\" shall be substituted;\n(b) in sub-regulation (2), for the words \"three working days\", the words \"five working days\" shall be substituted;\n(c) in sub-regulation (3), for the words \"five working days\", wherever occurring, the words \"ten working days\" shall be substituted;\n(d) in sub-regulation (4), for the words \"three working days\", the words \"ten working days\" shall be substituted;\n(e) in sub-regulation (5), for the words \"five working days\", the words \"ten working days\" shall be substituted;\n(iv) After schedule I to the principal regulations, the following schedule shall be inserted, namely:-\n\"Schedule II\n(1) In regulation 6 of the Telecommunication Interconnection Regulations, 2018 (1 of 2018) (hereinafter referred to as the principal regulations), after sub-regulation (3) the following proviso shall be inserted, namely:-\n(1) In regulation 6 of the Telecommunication Interconnection Regulations, 2018 (1 of 2018) (hereinafter referred to as the principal regulations), after sub-regulation (3) the following proviso shall be inserted, namely:-\n\"Provided that the port charges and infrastructure charges for all ports provided before the 1st February, 2018 shall continue to be payable as per the terms and conditions which were applicable to them before the 1st February, 2018.\"\n\"Provided that the port charges and infrastructure charges, for all ports provided before the 1st February, 2018, shall continue to be payable as per the terms and conditions which were applicable to them before the 1st February, 2018.\"\n(1) For regulation 8 of the principal regulations, the following regulation shall be substituted:\n(1) For regulation 8 of the principal regulations, the following regulation shall be substituted:\nRequest for augmentation of POIs. - (1) Each service provider shall provide its forecast of busy hour outgoing traffic for each POI, at intervals of every six months, to the interconnecting service provider and the first such forecast shall be provided within sixty days of the commencement of \"The Telecom Interconnection (Amendment) Regulations, 2018\" and thereafter on the 1st April and 1st October every year.\nRequest for augmentation of POIs.\n(2) A service provider may request the other service provider for additional ports at a POI, if the projected utilisation of the capacity of such POI, calculated in the manner as contained in schedule II to these regulations, at the end of sixty days from the date of placing the request, is likely to be more than eighty-five percent and such projected utilization of the capacity of POI shall be determined on the basis of the daily traffic for the preceding sixty days at the POI during busy hour:\nProvided that the service provider shall request for such number of additional ports which is likely to bring the utilization of the capacity of such POI, at the end of sixty days from the date of making request, to less than seventy-five percent.\"\nRequest for augmentation of POIs. - (1) Every service provider shall provide to the interconnecting service provider, at interval of every six months, its forecast of busy hour outgoing traffic, for the succeeding six months, at each POI and the first such forecast shall be provided within sixty days of the commencement of the Telecommunication Interconnection (Amendment) Regulations, 2018 and thereafter on the 1st April and 1st October every year.\nRequest for augmentation of POIs.\n(2) A service provider may request the other service provider for additional ports at a POI, if the projected utilisation of the capacity of such POI, calculated in the manner as contained in schedule II to these regulations, at the end of sixty days from the date of placing of the request, is likely to be more than eighty-five percent and such projected utilization of the capacity of POI shall be determined on the basis of the daily traffic for the preceding sixty days at the POI during busy hour:\nProvided that the service provider shall request for such number of additional ports which is likely to bring the utilization of the capacity of such POI, at the end of sixty days from the date of making request, to less than seventy-five percent.\"\n(3) In regulation 9 of the principal regulations,\n(a) in sub-regulation (1), for the words \"five working days\", the words \"seven working days\" shall be substituted;\n(b) in sub-regulation (2), for the words \"three working days\", the words \"five working days\" shall be substituted;\n(c) in sub-regulation (3), for the words \"five working days\", wherever occurring, the words \"ten working days\" shall be substituted;\n(d) in sub-regulation (4), for the words \"three working days\", the words \"ten working days\" shall be substituted;\n(e) in sub-regulation (5), for the words \"five working days\", the words \"ten working days\" shall be substituted;\n(a) A service provider, upon receipt of request of ports and collocation space, if required, shall issue letter of acceptance and demand note, if any, within seven working days of the receipt of request.\n(b) A service provider, upon receipt of the demand note, shall pay the amount, if any, within five working days from the date of receipt of demand note.\n(c) The service provider, who issued the letter of acceptance, shall intimate the requesting service provider about the provisioning of the requested ports at the POI and allocation of collocation space, if applicable,--\n(i) within ten working days from the date of issue of its letter of acceptance, in case no demand note was issued; and\n(ii) within ten working days from the date of receipt of payment from the requesting service provider against the demand note, in case a demand note was issued.\n(d) A service provider, upon receipt of the intimation about provisioning of the port and allocation of the collocation space, if applicable, shall, within ten working days of the receipt of the intimation, intimate the other service provider about establishment of transmission link between the POIs of the two service providers.\n(e) A service provider, upon receipt of the intimation about establishment of transmission link between the POIs, shall, within ten working days of the receipt of the intimation, carry out acceptance testing and issue final letter of commissioning of the ports to the other service provider.\nMaximum period (in working days) for service\n provider-2 to issue letter of acceptance and demand note, if any,\n upon receipt of request of ports and collocation space from\n service provider-1\n7\nMaximum period (in working days) for service\n provider-1 to pay the amount from the date of receipt of the\n demand note\n5\nMaximum period (in working days) for service\n provider-2 to intimate service provider-1 about the provisioning\n of the requested ports at the POI and allocation of collocation\n space\n10\nMaximum period (in working days) for service\n provider-1 to intimate service provider-2 about establishment of\n transmission link between the POIs\n10\nMaximum period (in working days) for service\n provider-2 to carry out acceptance testing and issue final letter\n of commissioning of the ports\n10",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
"prev_section": "19",
"next_section": null
}