← Back to Tamil Nadu Highways Act, 2001

8. Power to fix highway boundary, building line, control line, etc.

(a) the highway boundary , building line, or control line; or
(b) the highway boundary and the building line; and
(c) the building line and the control line:
(a) all details of lands situated between the highway boundary line and control line proposed to be fixed and in the case of new works, the lands and persons benefited by the construction or development of such highway; and
(b) notice requiring all persons likely to be affected by such notification, to make their objections or suggestions, if any, in writing, with respect to the issue of such a notification, to the Highways Authority within such period as may be prescribed.
(i) drop the proposal to fix the highway boundary, the building line or the control line; or
(ii) publish the final notification under sub-section (1) with such modifications as may be considered necessary.
(a) fix different building line and control line for such highway; or
(b) refrain from fixing the building line or control line for such highway or portion thereof.