(a) "deviation" is a departure from the requirements specified in the bidding documents;
(b) "reservation" is the setting of limiting conditions or withholding from complete acceptance of the requirements specified in the bidding documents; and
(c) "Omission" is the failure to submit part or all of the information or documentation required in the bidding documents.
(a) if accepted, would: -
(i) affect in any substantial way the scope, quality, or performance of the subject matter of procurement specified in the bidding documents; or
(ii) limits in any substantial way, inconsistent with the bidding documents, the procuring entity's rights or the bidders obligations under the proposed contract; or
(b) if rectified, would unfairly affect the competitive position of other bidders presenting responsive bids.
(b) The procuring entity may regard a bid as responsive even if it contains minor deviations that do not materially alter or depart from the characteristics, terms, conditions and other requirements set out in the bidding documents or if it contains errors or oversights that can be corrected without touching on the substance of the bid. Any such deviations shall be quantified, to the extent possible, and appropriately taken account of in the evaluation of bids.
Section 56 • Rajasthan Public Procurement Rules, 2012
56. Determination of responsiveness.
rajasthan-public-procurement-rules-2012-sec-56.json
•
Section 56
{
"act_title": "Rajasthan Public Procurement Rules, 2012",
"act_slug": "rajasthan-public-procurement-rules-2012",
"section_label": "Section",
"section": {
"number": "56",
"title": "56. Determination of responsiveness.",
"chapter": null,
"content": "(a) \"deviation\" is a departure from the requirements specified in the bidding documents;\n(b) \"reservation\" is the setting of limiting conditions or withholding from complete acceptance of the requirements specified in the bidding documents; and\n(c) \"Omission\" is the failure to submit part or all of the information or documentation required in the bidding documents.\n(a) if accepted, would: -\n(i) affect in any substantial way the scope, quality, or performance of the subject matter of procurement specified in the bidding documents; or\n(ii) limits in any substantial way, inconsistent with the bidding documents, the procuring entity's rights or the bidders obligations under the proposed contract; or\n(b) if rectified, would unfairly affect the competitive position of other bidders presenting responsive bids.\n(b) The procuring entity may regard a bid as responsive even if it contains minor deviations that do not materially alter or depart from the characteristics, terms, conditions and other requirements set out in the bidding documents or if it contains errors or oversights that can be corrected without touching on the substance of the bid. Any such deviations shall be quantified, to the extent possible, and appropriately taken account of in the evaluation of bids.",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
"prev_section": "55",
"next_section": "57"
}