(i) in Schedule-A. the Jaipur Vidyut Vitran Nigam Ltd. shall pay rupees 76.64 lacs; and
(ii) in Schedule-B the Jodhpur Vidhyut Vitran Nigam Ltd. shall pay rupees 6.32 lacs; to the Rajasthan Vidhyut Prasaran Nigam Ltd.
Section 3 • Rajasthan Power Sector Reforms Transfer Scheme-II, 2016
3. Transfer of Assets and Liabilities etc.
rajasthan-power-sector-reforms-transfer-scheme-ii-2016-sec-3.json
•
Section 3
{
"act_title": "Rajasthan Power Sector Reforms Transfer Scheme-II, 2016",
"act_slug": "rajasthan-power-sector-reforms-transfer-scheme-ii-2016",
"section_label": "Section",
"section": {
"number": "3",
"title": "3. Transfer of Assets and Liabilities etc.",
"chapter": null,
"content": "(i) in Schedule-A. the Jaipur Vidyut Vitran Nigam Ltd. shall pay rupees 76.64 lacs; and\n(ii) in Schedule-B the Jodhpur Vidhyut Vitran Nigam Ltd. shall pay rupees 6.32 lacs; to the Rajasthan Vidhyut Prasaran Nigam Ltd.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
"prev_section": "2",
"next_section": "4"
}