[Schedule - 'A']
Part I
[ See Rule 4(1)(a)]
Generation Undertakings
Generation Undertakings
I. Power Stations:
Thermal-
(a) KOTA THERMAL POWER STATION (Stage-I) with 2 generating units of 110 MW capacity each with all associated and related equipment such as generators, turbines, boilers, condensers, electrostatic precipitators, controls and instrumentation, Railway Sidings coal handling system, ash handling system, ash pond, raw water supply and treatment system, DM water plant, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, service transformers, auxiliary unit transformers circuit breakers, HT & LT Switchgears, control and protection system, overhead cranes, RCC chimney, Stores, spare parts, consumables, raw materials etc. and works in progress.
(b) KOTA THERMAL POWER STATION (Stage-II) with 2 generating units of 210 MW capacity each along with all associated and related equipment such as generators, turbines, boilers, auxiliary units with controls and instrumentation, Railway Sidings, coal handling system, ash handling system, ash pond, raw water supply and treatment system, DM water plant, Secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, service transformers, circuit breakers, HT & LT Switchgears, control and protection system, overhead cranes, Stores, spare parts, consumables, raw materials etc. and works in progress.
(c) KOTA THERMAL POWER STATION (Stage-Ill) with 1 generating unit of 210 MW capacity each along with all associated and related equipment such as generators, turbines, boilers, auxiliary units with controls and instrumentation, Railway Sidings, coal handling system, ash handling system, ash pond, raw water supply and treatment system, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, Stores, spare parts, consumables, raw materials etc. and works in progress.
(d) SURATGARH THERMAL POWER STATION (Stage-I) with two units of 250 MW each capacity along with all associated and related equipment such as generators, turbines, boilers auxiliary units-with controls and instrumentation, Railway Sidings, coal handling system, ash handling system ash pond, raw water supply and treatment system, DM Water plant, cooling towers, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, stores, spare parts, consumables, raw materials etc. and works in progress.
HYDEL POWER STATIONS:
(a) MAHI Phase I : Penstocks at the intake structure, penstock gates, power house, draft tube gate, tail race channel with 2 units of 25 MW capacity each along with generators, turbines and all associated and related equipment and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, pen stock and draft tube gates, overhead cranes, gantry cranes, hydraulic hoists, power house stores, spare parts, consumables, raw materials etc. and works in progress.
(b) MAHI Phase II : Penstocks at the intake structure, penstock gates, power house, draft tube gate, tail race channel with 2 units of 45 MW capacity each along with generators, turbines and all associated and related equipment and switch yard including step up transformers, step down transformers circuit breakers, control and protection system, pen stock and draft tube gates, overhead cranes, gantry cranes, hydraulic hoists, power house stores, spare parts, consumables, raw materials etc. and works in progress.
MINI HYDEL POWER STATIONS:
(a) Anoopgarh Hydel Station Phase I: Anoopgrah Power House Phase I located on Anoopgarh branch of Indira Gandhi Mukhya Nahar (IGMN), near village Biradhwal, with 3 units of 1.5 MW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P consumables, raw materials etc. and works in progress.
(b) Anoopgarh Hydel Station Phase II : Anoopgarh Power House Phase II located on Anoopgarh branch of Indira Gandhi Mukhya Nahar (IGMN), near village Birmana, with 3 units of 1.5 MW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.
(c) Birsalpur : Birsalpur Power House with one unit of 535 kW located on Birsalpur branch of Indira Gandhi Mukhya Nahar (IGMN), generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.
(d) Charanwala Mini Hydel: Charanwala Power House located on Charanwala branch of Indira Gandhi Mukhya Nahar (IGMN), with one unit of 1.2 MW generation capacity with all associated and related euipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.
(e) Mangrol Mini Hydel : Mangrol Power House located near village Mangrol, on Right Main Canal of Chambal Project, with three units of 2.0 MW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.
(f) Poogal Mini Hydel Phase I: Poogal Phase I Power House, located on Poogal, branch of Indira Gandhi Mukhya Nahar (IGMN) near village Dandi, with one unit of 1.5 MW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.
(g) Poogal Mini Hydel Phase II : Poogal Phase II Power House, located on Poogal branch of Indira Gandhi Mukhya Nahar (IGMN) near village Sattasar, with one unit of 650 kW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.
(h) RMC Mahi I : RMC Mahi I Power House, located on Right Main Canal of Mahi Project area near village Ghatol, with two emits of 400 kW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.
(i) RMC Mahi II : RMC Mahi II Power House, located on Right Main Canal of Mahi Project area near village Ganora, with one unit of 165 kW generation capacity with all associated and related equipment, switchyard, and power house stores, spare pats, T & P, consumables, raw materials etc. and works in progress.
(j) Suratgarh Mini Hydel : Suratgarh Mini Hydel Power House, located on Suratgarh Branch of Indira Gandhi Mukhya Nahar (IGMN), with two units of 2.0 MW generation capacity with all associated and related equipment, switchyard and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.
GAS GENERATION:
II. POWER PROJECTS UNDER CONSTRUCTION:
(a) Suratgarh Thermal Power Station II envisaging 2 units of 250 MW each along with associated equipment.
(b) Ramgarh Extension envisaging 2 units of 35.5 MW each along with related equipment.
III. GENERAL ASSETS:
(a) The following, if they exclusively or primarily pertain to the generating stations or projects referred to in Paras I and II above or activities related to such generating stations or projects :
Special tools and equipment, material handling equipment, earth movers, bulldozers, concrete mixtures, cranes, trailers, heavy and light vehicles, furniture, fixtures, office equipment, air conditioners, refrigerators, computers and signal systems, spares, consumables, r iw materials, lands and civil works installations including roads, buildings, staff quarters, rest houses, properties and structures and their associated buildings, schools, dispensaries, testing laboratories and equipment, training centers, workshops, works in progress, machinery and equipment sent for repairs, scraps and obsolete.
(b) The office establishment and other buildings and lands, not covered elsewhere in this schedule which are predominantly occupied/used for the activities of Generation Undertakings as on the effective date of transfer.
IV. MISCELLANEOUS:
Section 12 • Rajasthan Power Sector Reforms Transfer Scheme 2000
12. Decision of State Government final.
rajasthan-power-sector-reforms-transfer-scheme-2000-sec-12.json
•
Section 12
{
"act_title": "Rajasthan Power Sector Reforms Transfer Scheme 2000",
"act_slug": "rajasthan-power-sector-reforms-transfer-scheme-2000",
"section_label": "Section",
"section": {
"number": "12",
"title": "12. Decision of State Government final.",
"chapter": null,
"content": "[Schedule - 'A']\nPart I\n[ See Rule 4(1)(a)]\nGeneration Undertakings\nGeneration Undertakings\nI. Power Stations:\nThermal-\n(a) KOTA THERMAL POWER STATION (Stage-I) with 2 generating units of 110 MW capacity each with all associated and related equipment such as generators, turbines, boilers, condensers, electrostatic precipitators, controls and instrumentation, Railway Sidings coal handling system, ash handling system, ash pond, raw water supply and treatment system, DM water plant, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, service transformers, auxiliary unit transformers circuit breakers, HT & LT Switchgears, control and protection system, overhead cranes, RCC chimney, Stores, spare parts, consumables, raw materials etc. and works in progress.\n(b) KOTA THERMAL POWER STATION (Stage-II) with 2 generating units of 210 MW capacity each along with all associated and related equipment such as generators, turbines, boilers, auxiliary units with controls and instrumentation, Railway Sidings, coal handling system, ash handling system, ash pond, raw water supply and treatment system, DM water plant, Secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, service transformers, circuit breakers, HT & LT Switchgears, control and protection system, overhead cranes, Stores, spare parts, consumables, raw materials etc. and works in progress.\n(c) KOTA THERMAL POWER STATION (Stage-Ill) with 1 generating unit of 210 MW capacity each along with all associated and related equipment such as generators, turbines, boilers, auxiliary units with controls and instrumentation, Railway Sidings, coal handling system, ash handling system, ash pond, raw water supply and treatment system, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, Stores, spare parts, consumables, raw materials etc. and works in progress.\n(d) SURATGARH THERMAL POWER STATION (Stage-I) with two units of 250 MW each capacity along with all associated and related equipment such as generators, turbines, boilers auxiliary units-with controls and instrumentation, Railway Sidings, coal handling system, ash handling system ash pond, raw water supply and treatment system, DM Water plant, cooling towers, secondary fuel oil storage facilities and its handling system, switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, overhead cranes, stores, spare parts, consumables, raw materials etc. and works in progress.\nHYDEL POWER STATIONS:\n(a) MAHI Phase I : Penstocks at the intake structure, penstock gates, power house, draft tube gate, tail race channel with 2 units of 25 MW capacity each along with generators, turbines and all associated and related equipment and switch yard including step up transformers, step down transformers, circuit breakers, control and protection system, pen stock and draft tube gates, overhead cranes, gantry cranes, hydraulic hoists, power house stores, spare parts, consumables, raw materials etc. and works in progress.\n(b) MAHI Phase II : Penstocks at the intake structure, penstock gates, power house, draft tube gate, tail race channel with 2 units of 45 MW capacity each along with generators, turbines and all associated and related equipment and switch yard including step up transformers, step down transformers circuit breakers, control and protection system, pen stock and draft tube gates, overhead cranes, gantry cranes, hydraulic hoists, power house stores, spare parts, consumables, raw materials etc. and works in progress.\nMINI HYDEL POWER STATIONS:\n(a) Anoopgarh Hydel Station Phase I: Anoopgrah Power House Phase I located on Anoopgarh branch of Indira Gandhi Mukhya Nahar (IGMN), near village Biradhwal, with 3 units of 1.5 MW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P consumables, raw materials etc. and works in progress.\n(b) Anoopgarh Hydel Station Phase II : Anoopgarh Power House Phase II located on Anoopgarh branch of Indira Gandhi Mukhya Nahar (IGMN), near village Birmana, with 3 units of 1.5 MW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.\n(c) Birsalpur : Birsalpur Power House with one unit of 535 kW located on Birsalpur branch of Indira Gandhi Mukhya Nahar (IGMN), generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.\n(d) Charanwala Mini Hydel: Charanwala Power House located on Charanwala branch of Indira Gandhi Mukhya Nahar (IGMN), with one unit of 1.2 MW generation capacity with all associated and related euipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.\n(e) Mangrol Mini Hydel : Mangrol Power House located near village Mangrol, on Right Main Canal of Chambal Project, with three units of 2.0 MW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.\n(f) Poogal Mini Hydel Phase I: Poogal Phase I Power House, located on Poogal, branch of Indira Gandhi Mukhya Nahar (IGMN) near village Dandi, with one unit of 1.5 MW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.\n(g) Poogal Mini Hydel Phase II : Poogal Phase II Power House, located on Poogal branch of Indira Gandhi Mukhya Nahar (IGMN) near village Sattasar, with one unit of 650 kW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.\n(h) RMC Mahi I : RMC Mahi I Power House, located on Right Main Canal of Mahi Project area near village Ghatol, with two emits of 400 kW generation capacity with all associated and related equipment, switchyard, and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.\n(i) RMC Mahi II : RMC Mahi II Power House, located on Right Main Canal of Mahi Project area near village Ganora, with one unit of 165 kW generation capacity with all associated and related equipment, switchyard, and power house stores, spare pats, T & P, consumables, raw materials etc. and works in progress.\n(j) Suratgarh Mini Hydel : Suratgarh Mini Hydel Power House, located on Suratgarh Branch of Indira Gandhi Mukhya Nahar (IGMN), with two units of 2.0 MW generation capacity with all associated and related equipment, switchyard and power house stores, spare parts, T & P, consumables, raw materials etc. and works in progress.\nGAS GENERATION:\nII. POWER PROJECTS UNDER CONSTRUCTION:\n(a) Suratgarh Thermal Power Station II envisaging 2 units of 250 MW each along with associated equipment.\n(b) Ramgarh Extension envisaging 2 units of 35.5 MW each along with related equipment.\nIII. GENERAL ASSETS:\n(a) The following, if they exclusively or primarily pertain to the generating stations or projects referred to in Paras I and II above or activities related to such generating stations or projects :\nSpecial tools and equipment, material handling equipment, earth movers, bulldozers, concrete mixtures, cranes, trailers, heavy and light vehicles, furniture, fixtures, office equipment, air conditioners, refrigerators, computers and signal systems, spares, consumables, r iw materials, lands and civil works installations including roads, buildings, staff quarters, rest houses, properties and structures and their associated buildings, schools, dispensaries, testing laboratories and equipment, training centers, workshops, works in progress, machinery and equipment sent for repairs, scraps and obsolete.\n(b) The office establishment and other buildings and lands, not covered elsewhere in this schedule which are predominantly occupied/used for the activities of Generation Undertakings as on the effective date of transfer.\nIV. MISCELLANEOUS:",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
"prev_section": "11",
"next_section": "1"
}