consultation with the licensees, the Commission Advisory Committee, and with persons or
bodies appearing to it to be representative of persons likely to be affected, from time to time, -
(a) determine such standards of overall performance in connection with the provision of
electricity supply services and in connection with the promotion of the efficient use of
electricity by consumers as, in its opinion, is economic and ought to be achieved by such
licensees: and
(b) arrange for the publications, in such form and in such manner as it considers appropriate,
of the standards so determined.
(2) Different standards may be determined under this section for different licensees.
Section 34 • The rajasthan power sector reforms act, 1999
Section 34. Electricity supply, overall performance standards. - The Commission may, after
rajasthan-power-sector-reforms-act-1999-sec-34.json
•
Section 34
{
"act_title": "The rajasthan power sector reforms act, 1999",
"act_slug": "rajasthan-power-sector-reforms-act-1999",
"section_label": "Section",
"section": {
"number": "34",
"title": "Section 34. Electricity supply, overall performance standards. - The Commission may, after",
"chapter": null,
"content": "consultation with the licensees, the Commission Advisory Committee, and with persons or \nbodies appearing to it to be representative of persons likely to be affected, from time to time, - \n(a) determine such standards of overall performance in connection with the provision of \nelectricity supply services and in connection with the promotion of the efficient use of \nelectricity by consumers as, in its opinion, is economic and ought to be achieved by such \nlicensees: and \n(b) arrange for the publications, in such form and in such manner as it considers appropriate, \nof the standards so determined. \n (2) Different standards may be determined under this section for different licensees.",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
"prev_section": "33",
"next_section": "35"
}