2. Definitions.-

(a) "Act" means the Railways Act, 1989 (24 of 1989); (b) "section" means the section of the Act; (c) "class rate" means the freight rate applicable to a commodity as per the class assigned to that commodity; (d)"Permissible carrying capacity" means the normal carrying capacity determined under subsection(2) or (3) of section 72, or where a railway administration has determined a varied carrying capacity under sub-section (4) of section 72, such varied carrying capacity, whichever is higher; (e)"Schedule" means the Schedule to these rules; (f)"Normal freight" means the freight charge recoverable on a commodity at the class rate for the weight of the commodity loaded upto permissible carrying capacity plus 1 tonne or 2 tonnes, as the case may be, as specified in the Schedule; (g) Words and expression used and not defined in these rules but defined in the Act shall have the meaning respectively assigned to them in the Act. 3. Punitive charges for overloading.- Where the commodities are over-loaded in Railway wagon, the railway administration shall recover punitive charges as provided in part I and II of the situation `A' and `B' of the Schedule, from the consignor, the consignee or the endorsee, as the case may be, for the entire distance to be travelled by the train hauling the wagon from the originating station to the destination point, irrespective of the point of detection of overloading: Provided that no punitive charges will be levied if the customer carries out load adjustment at the originating station itself in case of detection of overloading at originating point. SCHEDULE Situation-A If the aggregated payload in a rake does not exceed the combined permissible carrying capacity of the rake, the punitive charges shall be levied as per following: Part-I For `Enhanced CC' commodities loaded in 8-wheeled wagons (except BOX, BOST and BOY wagons) Extent of overloading [Punitive charges leviable on the entire weight of commodity loaded in excess of permissible carrying capacity and loading tolerance of 2 tonnes] If the weight of commodity exceeds the permissible carrying capacity of the wagon; (a) upto 2 tonnes Nil (b) by more than 2 tonnes but not more than 5 tonnes 2 times of the freight rate applicable to that commodity. (d) by more than 5 tonnes 3 times of the freight rate applicable to the highest class.
(b) "section" means the section of the Act; (c) "class rate" means the freight rate applicable to a commodity as per the class assigned to that commodity; (d)"Permissible carrying capacity" means the normal carrying capacity determined under subsection(2) or (3) of section 72, or where a railway administration has determined a varied carrying capacity under sub-section (4) of section 72, such varied carrying capacity, whichever is higher; (e)"Schedule" means the Schedule to these rules; (f)"Normal freight" means the freight charge recoverable on a commodity at the class rate for the weight of the commodity loaded upto permissible carrying capacity plus 1 tonne or 2 tonnes, as the case may be, as specified in the Schedule; (g) Words and expression used and not defined in these rules but defined in the Act shall have the meaning respectively assigned to them in the Act. 3. Punitive charges for overloading.- Where the commodities are over-loaded in Railway wagon, the railway administration shall recover punitive charges as provided in part I and II of the situation `A' and `B' of the Schedule, from the consignor, the consignee or the endorsee, as the case may be, for the entire distance to be travelled by the train hauling the wagon from the originating station to the destination point, irrespective of the point of detection of overloading: Provided that no punitive charges will be levied if the customer carries out load adjustment at the originating station itself in case of detection of overloading at originating point. SCHEDULE Situation-A If the aggregated payload in a rake does not exceed the combined permissible carrying capacity of the rake, the punitive charges shall be levied as per following: Part-I For `Enhanced CC' commodities loaded in 8-wheeled wagons (except BOX, BOST and BOY wagons)
(c) "class rate" means the freight rate applicable to a commodity as per the class assigned to that commodity; (d)"Permissible carrying capacity" means the normal carrying capacity determined under subsection(2) or (3) of section 72, or where a railway administration has determined a varied carrying capacity under sub-section (4) of section 72, such varied carrying capacity, whichever is higher; (e)"Schedule" means the Schedule to these rules; (f)"Normal freight" means the freight charge recoverable on a commodity at the class rate for the weight of the commodity loaded upto permissible carrying capacity plus 1 tonne or 2 tonnes, as the case may be, as specified in the Schedule; (g) Words and expression used and not defined in these rules but defined in the Act shall have the meaning respectively assigned to them in the Act. 3. Punitive charges for overloading.- Where the commodities are over-loaded in Railway wagon, the railway administration shall recover punitive charges as provided in part I and II of the situation `A' and `B' of the Schedule, from the consignor, the consignee or the endorsee, as the case may be, for the entire distance to be travelled by the train hauling the wagon from the originating station to the destination point, irrespective of the point of detection of overloading: Provided that no punitive charges will be levied if the customer carries out load adjustment at the originating station itself in case of detection of overloading at originating point. SCHEDULE Situation-A If the aggregated payload in a rake does not exceed the combined permissible carrying capacity of the rake, the punitive charges shall be levied as per following:
(d)"Permissible carrying capacity" means the normal carrying capacity determined under subsection(2) or (3) of section 72, or where a railway administration has determined a varied carrying capacity under sub-section (4) of section 72, such varied carrying capacity, whichever is higher; (e)"Schedule" means the Schedule to these rules; (f)"Normal freight" means the freight charge recoverable on a commodity at the class rate for the weight of the commodity loaded upto permissible carrying capacity plus 1 tonne or 2 tonnes, as the case may be, as specified in the Schedule; (g) Words and expression used and not defined in these rules but defined in the Act shall have the meaning respectively assigned to them in the Act. 3. Punitive charges for overloading.- Where the commodities are over-loaded in Railway wagon, the railway administration shall recover punitive charges as provided in part I and II of the situation `A' and `B' of the Schedule, from the consignor, the consignee or the endorsee, as the case may be, for the entire distance to be travelled by the train hauling the wagon from the originating station to the destination point, irrespective of the point of detection of overloading: Provided that no punitive charges will be levied if the customer carries out load adjustment at the originating station itself in case of detection of overloading at originating point. SCHEDULE Situation-A
(e)"Schedule" means the Schedule to these rules; (f)"Normal freight" means the freight charge recoverable on a commodity at the class rate for the weight of the commodity loaded upto permissible carrying capacity plus 1 tonne or 2 tonnes, as the case may be, as specified in the Schedule; (g) Words and expression used and not defined in these rules but defined in the Act shall have the meaning respectively assigned to them in the Act. 3. Punitive charges for overloading.- Where the commodities are over-loaded in Railway wagon, the railway administration shall recover punitive charges as provided in part I and II of the situation `A' and `B' of the Schedule, from the consignor, the consignee or the endorsee, as the case may be, for the entire distance to be travelled by the train hauling the wagon from the originating station to the destination point, irrespective of the point of detection of overloading: Provided that no punitive charges will be levied if the customer carries out load adjustment at the originating station itself in case of detection of overloading at originating point.
(f)"Normal freight" means the freight charge recoverable on a commodity at the class rate for the weight of the commodity loaded upto permissible carrying capacity plus 1 tonne or 2 tonnes, as the case may be, as specified in the Schedule; (g) Words and expression used and not defined in these rules but defined in the Act shall have the meaning respectively assigned to them in the Act. 3. Punitive charges for overloading.- Where the commodities are over-loaded in Railway wagon, the railway administration shall recover punitive charges as provided in part I and II of the situation `A' and `B' of the Schedule, from the consignor, the consignee or the endorsee, as the case may be, for the entire distance to be travelled by the train hauling the wagon from the originating station to the destination point, irrespective of the point of detection of overloading:
(g) Words and expression used and not defined in these rules but defined in the Act shall have the meaning respectively assigned to them in the Act.