← Back to Directory
Punjab Urban Planning and Development Authority Building Rules, 2013
Punjab Urban Planning and Development Authority Building Rules, 2013
Sections
1. Short title, commencement and application.
Section 12. Definitions.
Section 23. Erection or re-erection without permission.
Section 34. Design and supervision.
Section 45. Application to erect or re-erect buildings.
Section 56. Site Plan.
Section 67. Building plans, sections and elevations.
Section 78. Standard design and architectural controls.
Section 89. Electronic submission of application.
Section 910. Occupation certificate.
Section 1011. Power of the Competent Authority to sanction or refuse erection or re-erection.
Section 1112. Presumption of sanction.
Section 1213. Validity period of sanction.
Section 1314. Compliance of zoning plan and architectural control sheets.
Section 1415. Site Coverage.
Section 1516. Floor area ratio.
Section 1617. Height of building and setbacks around buildings.
Section 1718. Projection.
Section 1820. Minimum Area of Courtyard.
Section 2021. Dwelling unit.
Section 2122. Minimum height of room, verandah and light ventilation.
Section 2223. Provision of lift.
Section 2324. Basement.
Section 2425. Stair case.
Section 2526. Set back of projected portion of roof level.
Section 2627. Distance between buildings.
Section 2728. Street width.
Section 2829. Fire Protection.
Section 2930. Structural design.
Section 3031. Plinth level.
Section 3132. Roof.
Section 3233. Use of glass.
Section 3334. Application for connection.
Section 3435. Material for water connection.
Section 3536. Sanction of water connection.
Section 3637. Release of water connection.
Section 3738. Notice and Certificate of Completion of work.
Section 3839. Application for connection with public sewer.
Section 3940. Connection with Public sewer.
Section 4041. Material for drain and construction.
Section 4142. Drain connection for trade effluent.
Section 4243. Waste water pipes.
Section 4344. Manholes.
Section 4445. Septic Tank.
Section 4546. Absorption pits.
Section 4647. Roof top rain water harvesting and ground water recharging.
Section 4748. Electrical installation.
Section 4849. Solar water heating.
Section 4950. Registration of Plumbers.
Section 5051. Grant of registration.
Section 5152. Renewal of registration.
Section 5253. Cancellation of Registration Certificate.
Section 5354. Relaxation.
Section 5455. Matters not covered under these rules.
Section 5556. Repeal and saving.
Section 56
punjab-urban-planning-and-development-authority-building-rules-2013.json
•
55 Sections
•
Punjab
{
"id": 21841,
"slug": "punjab-urban-planning-and-development-authority-building-rules-2013",
"title": "Punjab Urban Planning and Development Authority Building Rules, 2013",
"short_title": "Punjab Urban Planning and Development Authority Building Rules, 2013",
"act_number": "Published vide Notification No. G.S.R.54/P.A.11/19",
"act_year": 2013,
"act_type": "STATE",
"location": "Punjab",
"law_status": "unknown",
"enactment_date": null,
"description": "Punjab Urban Planning and Development Authority Building Rules, 2013",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title, commencement and application.",
"chapter": null,
"content": "Part I\nPreliminary",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) \"abut\" a building shall be said to abut a street / road where the outer face of any of its external walls is on the street / road boundary;\n(b) \"Act\" means the Punjab Regional and Town Planning and Development Act, 1995;\n(c) \"alteration\" means a change to the structure of building, such as an addition to the area or height, or removal of part of a building or any change to the structure such as construction of cutting into or removal of any wall, partition, column, beam, joist, floor or other support, or a change to or closing of any required means of ingress or egress or a change to the fixtures or equipments;\n(d) \"ancillary zone\" in relation to any area means the land use zone ancillary or serving the dominant land use and includes all the conforming uses of the dominant land use but excludes all the nonconforming uses, whether existing or proposed;\n(e) \"applicant\" means a person who gives notice to the Competent Authority to erect or re-erect a building and also includes his legal representatives and authorized agent;\n(f) \"authorized officer\" means an officer of the Authority specifically authorized by the Authority to perform functions of the authorized officer under these rules;\n(g) \"Architect\" shall have the same meaning as has been assigned to it in the Architects Act, 1972;\n(h) \"architectural control sheets\" means the sheets of drawing with directions approved by the Competent Authority and kept in its office showing the measures of architectural control;\n(i) \"assembly buildings\" means any building or part of a building , where number of persons not less than fifty congregate or gather for amusement, recreation, social ,religious, patriotic, civil, travel and similar purposes, for example, theatres ,motion picture houses, assembly halls, auditoria ,exhibition halls, museums, skating rinks, gymnasiums, restaurants, places of worship, dance halls, club rooms, passenger stations and terminal of air ,surface and marine public transportation services, recreation piers and stadia;\n(j) \"balcony\" means a horizontal projection, cantilevered or otherwise including a parapet handrail, balustrade, to serve as a passage or sit out place;\n(k) \"basement\" means,-\n(i) storey just below the ground storey which has any part, more than half of its height below the main level of the front street, or\n(ii) the structure which has any part, more than half of its height below the main level of the front street,\n(l) \"building envelop\" means the horizontal spatial limits up to which a building may be permitted to be constructed on a plot;\n(m) \"building line\" means a fixed line specified for a site beyond which no building within that site other than permitted projection and compound wall shall project;\n(n) \"chhajja\" means a cantilevered horizontal or sloping projection;\n(o) \"commercial building\" means a building used or constructed or adapted to be used either ordinarily or occasionally as:-\n(i) multiplex, cinema, office, bank, hotel, restaurant, shop, shopping complex; or\n(ii) a building primarily used for display and sale of merchandise or any similar purpose; or\n(iii) any other building used for purposes similar mentioned in item (i) & (ii);\n(p) \"completion certificate\", means a Certificate issued by the Competent Authority on written request of the applicant or promoter after completion of building works including all services or utilities as provided in the sanctioned building plans in case of buildings and in case of a colony under the Punjab Apartment Property Regulation Act, 1995 or the Mega Projects on completion of development works viz., roads, water supply, sewerage and drainage system, street lightning, parks and other utilities as provided in the layout plan of the colony or project.\n(q) \"courtyard\" means an area at the ground floor level or any other level within or adjacent to the building which is permanently open to sky and is enclosed or partially enclosed by the building, boundary walls or railings;\n(r) \"detached building\" means a building detached on all sides;\n(s) \"Engineer\" means a person holding any of the qualification eligible to Associate Member of the Institution of Engineers;\n(t) \"exit\" means a passage, channel or means of egress from any building, to a street or other open space of safety;\n(u) \"floor area ratio\" means the ratio derived by dividing, the total covered area of all floors, (excluding the area of basement storey used for storage, services and parking, stilts used for parking and separate multi level parking block) by the area of plot;\n(v) \"ground floor\" means the storey which has floor surface nearest to the ground;\n(w) \"group housing\" means a building constructed or to be constructed with more than one floors consisting of more than one dwelling units and having common service facilities;\n(x) \"habitable room\" means a room having windows and doors of the size of not less than one-tenth of the floor area of the room and designed for use of study, living, sleeping, eating, kitchen excluding bath rooms, water closets compartments, laundries, serving and storage pantries, corridors, attics and spaces which are not used frequently for extended period;\n(y) \"height\" height in relation to a building means the vertical measurement of the building measured from the plinth level upto the highest level of the building roof excluding parapet ,flues, ducts, water storage tank and mamties, domes, water cooling tanks, lift towers, lift rooms, architectural features not exceeding 2.25 meters in height, and in relation to a room means the vertical measurement from finished surface of the floor to the under surface of the ceiling of the room and in the case of sloping ceiling, the height shall be the minimum height of any room;\n(z) \"independent floors\" means a building used or intended to be used for residential purpose, where every floor of the building is a separate and independent dwelling unit;\n(za) \"industrial building\" means a building used or constructed or adapted to be used either ordinarily or occasionally for fabrication, assembly, manufacturing or processing of products or materials of all kinds;\n(zb) \"Information Technology and Information Technology enabled services (IT and ITES) building\" means a building used or constructed or adapted to be used for Software architecture design and development, software maintenance and implementation, operation of software systems, provision of software services, management of data bases, maintenance of computer networks and telecommunication net works, net work services, network administration, business process out sourcing or providing information technology enabled services.\n(zc) \"lobby\" means a covered circulation space;\n(zd) \"loft\" means an intermediate floor in between two main floors not less than 1.2 meters in height which may be adopted or constructed for storage purposes and at a height of not less than 2.25 meters from floor level;\n(ze) \"mamti\" means a small structure erected on the roof of a building at the head of a stair case to protect such a staircase from weather;\n(zf) \"material change of use\" means a change of use from one class of building to another class of building;\n(zg) \"Marriage Palace\" means premises built up or open or both or any part thereof, where accommodation or space is used for marriage, receptions, social gatherings, meetings on regular or periodical or occasional basis and where number of persons not less than fifty can congregate or gather;\n(zh) \"mezzanine floor\" means an intermediate floor between two floors of any storey forming an integral part of floor below;\n(zi) \"Multiplex\" means an integrated entertainment and shopping centre or complex having at least three cinema halls with total minimum seating capacity of one thousand seats;\n(zj) \"parking space\" means an area to park vehicles meant either for private parking or public parking;\n(zk) \"Pergola\" means set of beams spaced apart without sheet or slab and not to be considered as covered area;\n(zl) \"plinth level\" means the level of the ground floor of a building with respect to the front street;\n(zm) \"Plumber\" means a person holding any of the qualifications specified in the Schedule and registered as such under these rules;\n(zn) \"Public building\" means a building used or constructed or adapted to be used either ordinarily or occasionally as a place open to general public and it includes a hospital, college, school, restaurant, theatre, public concert room, public lecture room, public exhibition hall or as a public place of assembly or entertainment for persons admitted there to by tickets or otherwise, or used or constructed or adapted to be used either ordinarily or occasionally for any similar public purposes;\n(zo) \"residential building\" means a building used or constructed or adapted to be used either ordinarily or occasionally for normal residential purposes in which sleeping accommodation is provided with or without cooking or dining;\n(zp) \"storage and warehouse building\" means a building used or constructed or adapted to be used either ordinarily or occasionally for the storage or sheltering of goods or any other similar activity, including servicing, processing or repairs incidental to such storage;\n(zq) \"Public parking\" means a parking space used or provided exclusively for the parking of vehicles by the general Public;\n(zr) \"serviced studio\" means studio consisting of one room, and a bathroom available for short or long-term stay. The building consisting of serviced studios shall provide amenities like laundry space, common kitchen, common room for indoor games or entertainment. It shall be permissible in shopping arcades or projects in Municipal areas;\n(zs) \"Site coverage\" means ground area covered by the building immediately above plinth level but does not include the space covered by,-\n(i) the compound wall, gate;\n(ii) Permitted cantilevered projection;\n(iii) garden rockery wall and well structure, plant nursery, water pool, platform around a tree, tank, fountain, bench;\n(iv) drainage, culvert, conduit catch pit, gully pit, chamber and gutter; and\n(v) electric meter, generator room with temporary roof, guard room.\n(zt) \"stand alone project\" means any project which is independent with regard to its location, approach and is not a part of any other project;\n(zu) \"storey\" means any horizontal division of building so constructed as to be capable of use although such horizontal division may not extend over the whole depth or width of the building, but shall not include service floor and mezzanine floor;\n(zv) \"street\" means any roads, path way, square court, alley or passage accessible whether permanently or temporarily to the public and whether a through fare or not, and shall include every vacant space not withstanding that it may be a private property and partly of wholly obstructed by any gate, post, chain or other barrier whether of houses, shops or other building abutting thereon, which is used by any person as a means of access to or from any public place or thorough fare whether such person be occupiers of such buildings or not, but shall not include any part of such space which the occupier of such building has a right at all hours to prevent all other persons from using as aforesaid and shall include also the drains or gutters therein or on either side and the land, whether covered or not by any pavement, veranda or other erection, up to the boundary of any abutting property not accessible to the public;\n(zw) \"temporary building\" means a building built of un-burnt bricks, burnt bricks without mortar, corrugated iron, bamboo, thatch, wood board or plywood but shall not include building built of burnt bricks, cement blocks or stones laid in mortar;\n(zx) \"ventilation\" means supply of outside air into a building through window or other openings due to wind outside and convection effects arising from temperature or vapours pressure differences and, or both, between inside and outside of the building; and it could be through mechanical device or through natural means;\n(zy) \"zoning plan\" means the plan approved by the Competent Authority showing the streets, boundaries of building site open spaces position, permissible heights, permissible uses of land and building site coverage and such other restrictions on the use and development of land or buildings; and\nPart II\nProcedure of Submission of Building Applications",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Erection or re-erection without permission.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Design and supervision.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Application to erect or re-erect buildings.",
"chapter": null,
"content": "(i) site plan detailed in rule 6;\n(ii) plans, elevations and sections of the proposed building detailed in rule 7;\n(iii) water supply and drainage plans;\n(iv) structural stability certificate;\n(v) scheme for air conditioning or air cooling, if provided and\n(vi) in case the building is more than fifteen meters in height, then three more sets of the schemes each designed for fire fighting system equipment and the electrical scheme;",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Site Plan.",
"chapter": null,
"content": "(i) the boundaries of the site;\n(ii) the directions of the north point relative to the site of the building;\n(iii) the streets or roads adjoining the site with their width clearly dimensioned and names, if any, giving also all existing roads, trees, lamp posts or any other feature or structure likely to affect the approach to the building;\n(iv) the outlines of the proposed building;\n(v) the levels of the site and the plinths of the building in relation to those of the neighbouring roads;\n(vi) the area of the site to be covered by the building and also the level of courtyard and open space;\n(vii) all existing buildings or structure on or over or under the site or projecting beyond it;\n(viii) methods of disposal of waste water, sewerage and storm water; and\n(ix) surroundings up to a distance of fifteen metres on all sides from the boundaries of the site.",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Building plans, sections and elevations.",
"chapter": null,
"content": "(i) the plan of the ground floor and other floors of the proposed building, all elevations and sections fully explaining the design;\n(ii) the plinth level of the building with reference to level of the front street;\n(iii) the level of the courtyard and open spaces in the building in relation to the highest level of the streets towards which the building is to be drained;\n(iv) the proposed building and the proposed method of draining it including the position, form and dimensions of water closet, urinals, drainage of stables, dhobi ghats, dust bins, gate pillars and the method of disposal of sewerage and storm water;\n(v) the size of the doors, windows, openings and other methods of ventilation; and\n(vi) the means of access to the building and its various doors and means of escape in case of fire or any other emergency.",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Standard design and architectural controls.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Electronic submission of application.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Occupation certificate.",
"chapter": null,
"content": "Part III\nAdministrative Control",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Power of the Competent Authority to sanction or refuse erection or re-erection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Presumption of sanction.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. Validity period of sanction.",
"chapter": null,
"content": "Part IV\nPlanning and Architectural Control",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. Compliance of zoning plan and architectural control sheets.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. Site Coverage.",
"chapter": null,
"content": "Serial No.\nSerial No.\nArea of plot\nArea of plot\nPermissible ground coverage\nPermissible ground coverage\n(i)\nFirst 250 square meters\nup to 65 percent\n(ii)\nNext 100 square meters\nup to 60 percent\n(iii)\nNext 100 square meters\nup to 50 percent\n(iv)\nBeyond 450 square meters\nup to 40 percent\nGroup housing\nGroup housing\nMaximum ground coverage - up to 30 percent\nNote: Upto 0.20 percent of the total covered area of group housing project shall be allowable for convenient shopping such as grocery shop, vegetable shop, laundry and dry cleaning, medical store, confectionery, bakery, hair cutting saloon, stationery shop, milk booth,- Independent floors\nNote: Upto 0.20 percent of the total covered area of group housing project shall be allowable for convenient shopping such as grocery shop, vegetable shop, laundry and dry cleaning, medical store, confectionery, bakery, hair cutting saloon, stationery shop, milk booth,-\nNote:\nIndependent floors\nSerial No.\nSerial No.\nArea of individual plot\nArea of individual plot\nPermissible ground coverage\nPermissible ground coverage\n(i)\nFirst 250 square meters\nup to 65 percent\n(ii)\nNext 100 square meters\nup to 60 percent\n(iii)\nNext 100 square meters\nup to 50 percent\n(iv)\nBeyond 450 square meters\nup to 40 percent:\nIndustrial buildings:\nGeneral industrial buildings\nSerial No.\nSerial No.\nArea of site\nArea of site\nPermissible site coverage\nPermissible site coverage\n(i)\nFirst 425 square meters\nup to 65 percent\n(ii)\nNext 425 square meters\nup to 60 percent\n(iii)\nbeyond 850 square meters\nup to 50 percent\nInformation Technology Industrial buildings\nSerial No.\nSerial No.\nArea of site\nArea of site\nPermissible site coverage\nPermissible site coverage\n(i)\nUpto 225 square meters\nup to 65 percent\n(ii)\nUpto 425 square meters\nup to 60 percent\n(iii)\nBeyond 425 square meters\nup to 50 percent\nCommercial:\nPublic buildings:\n(i)\nPublic Offices\nupto 40 percent\n(ii)\nEducational or religious buildings Hospital, nursing home or\nup to 40 percent\n(iii)\nMedical laboratory;\nup to 40 percent\n(iv)\nHotel, Banquet hall, Club, Community centre Public concert\n\t\t\t\thall or Auditorium;\nup to 40 percent\n(v)\nMuseum, Gymnasium or Public exhibition\nup to 40 percent\n(vi)\nAmusement park or Sports\nup to 10 percent\n(vii)\nMarriage palaces\nup to 35 percent\nNote:\nNote:\n• For any other activity not covered above, the ground coverage shall be as permitted by the Competent Authority.\n• Upto 5 percent of the total covered area in all category buildings shall be permissible for the housing of staff.",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "16",
"title": "16. Floor area ratio.",
"chapter": null,
"content": "(i)\nPublic Offices\n1:1.50\n(ii)\nEducational or religious buildings\n1:1.00\n(iii)\nHospital, nursing home or medical laboratory;\n(a) Area 1000 - 2000 square yards with road 40 feet\n1:1.50\n(b) 2001 to 4000 square yards with road 60 feet\n1:1.75\n(c) 4001 square yards and above with road 80 feet\n1:2.25\n(iv)\nBanquet hall, Club, Community centre, Public concert hall or\n\t\t\t\tAuditorium\n1:1.00\n(v)\nMuseum, Gymnasium or Public exhibition hall\n1:1.00\n(vi)\nAmusement park or sports complex\n1:0.10\n(vii)\n(vii)\nIn the case of residential plot development and\n\t\t\t\tindependent floors buildings shall be as under;\nIn the case of residential plot development and\n\t\t\t\tindependent floors buildings shall be as under;\n(i)\nFirst 250 square meters\n1: 1.95\n(ii)\nNext 100 square meters\n1: 1.40\n(iii)\nNext 100 square meters\n1: 1.20\n(iv)\nBeyond 450 square meters\n1: 0.90\n(viii)\n(viii)\nIn case of group housing, the floor area ratio shall be\n\t\t\t\tas under;\nIn case of group housing, the floor area ratio shall be\n\t\t\t\tas under;\n(i)\nMinimum approach road 60 feet -79 feet\n1: 2.00\n(ii)\nMinimum approach road above 80 feet -150 feet\n1:2.50\n(iii)\nMinimum approach road above 150 feet\n1:3.00\nCommercial sites, the floor area ratio\n\t\t\t\tshall be as under;\nCommercial sites, the floor area ratio\n\t\t\t\tshall be as under;\n(i)\nFor site located on road width between 80 feet to 100 feet\n1:2.00\n(ii)\nFor site located on road width between 101 feet to 150 feet\n1:2.50\n(iii)\nFor site located on road width between 151 feet to 200 feet\n1:3.00\n(ix)\n(ix)\nHotel:\nHotel:\n(i)\nFor plot size 1000 square yards to 2000 square yards with road\n\t\t\t\t40 feet\n1:2.00\n(ii)\nFor plot size 2001 square yards to 4000 square yards with road\n\t\t\t\t60 feet\n1:2.50\n(iii)\nFor plot size 4001 square yards and above with road 80 feet\n\t\t\t\tand above\n1:3.00\nNote: In rural areas outside Master Plans, the Hotel\n\t\t\t\tactivity upto one acre area shall be permissible on link roads\n\t\t\t\thaving minimum width of 22'-0\" (4 karam). However, the\n\t\t\t\tdeveloper has to widen the road to minimum 40 feet or as\n\t\t\t\tspecified in the Master Plan whichever is more, by leaving\n\t\t\t\tproportionate area from his own land.\nNote:\n(x)\n(x)\nIn case of industrial plots, the floor area\n\t\t\t\tratio shall be as under;\nIn case of industrial plots, the floor area\n\t\t\t\tratio shall be as under;\n(a)\n(a)\nIn the case of industries except Information Technology\nIn the case of industries except Information Technology\n(i)\nFor plots up to 425 square meters in area\n1:1.50\n(ii)\nFor next 425 square meters\n1:1.40\n(iii)\nBeyond 850 square meters\n1:1.30\n(b)\n(b)\nIn case of Information Technology units, knowledge based\n\t\t\t\tindustries, research institutions and commercial components of\nIn case of Information Technology units, knowledge based\n\t\t\t\tindustries, research institutions and commercial components of\nInformation Technology Park the floor area ratio shall be\n1:3.00\nNote: An additional 5 percent floor area ratio free of charges shall be permissible to the Eco-friendly buildings. The promoter has to provide Certificate from Bureau of Energy Efficiency or from GRIHA (Green Rating Integrated Habitat Assessment) of Ministry of Non Renewable Energy Source and Energy, Government of India. However, in case the promoter fails to submit maintenance certificate after a period of every five years from the Competent Authority, the defaulter can be penalized at the rate of 200 percent of additional floor area ratio permitted.\nNote:",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "17",
"title": "17. Height of building and setbacks around buildings.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "18",
"title": "18. Projection.",
"chapter": null,
"content": "19.\n(1) The parking norms for different categories of buildings shall be as below.-\nCategory of building\nCategory of building\nProposed Norms\nProposed Norms\nGroup Housing Project and independent floors building\n1.5 ECS (Equivalent Car Space) per DU (Dwelling Unit) with\n\t\t\t\tunit area upto 1200 square feet, 2.0 ECS (Equivalent Car Space)\n\t\t\t\tper DU (Dwelling Unit) with unit area upto 3000 square feet and 3\n\t\t\t\tECS (Equivalent Car Space) above 3000 sq feet. Additional 10\n\t\t\t\tpercent guest parking shall also be provided.\nStand alone Hostels\n1.5 ECS (Equivalent Car Space)/100 square meters of covered\n\t\t\t\tarea\nLodges, guest houses or inns\n2.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tcovered area\nCommercial buildings: Multiplex or Cinema, shop,\n\t\t\t\tshopping complex or a building primarily used for display and\n\t\t\t\tsale of merchandise or any similar purpose.\nCommercial buildings:\n3.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tcovered area in respect of d multiplex or cinema component plus\n\t\t\t\t30 percent of the total covered area of that component i.e\n\t\t\t\t(multiplex or cinema component) and 2 ECS (Equivalent Car Space)/\n\t\t\t\t100 square meters of the balance total commercial covered area\n\t\t\t\tincluding circulation area.\nRestaurant, shop, shopping complex or a building primarily\n\t\t\t\tused for display and sale of merchandise or any similar purpose\n2 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\ttotal covered area including circulation area.\nOffice or Bank\nOffice or Bank\n2 ECS (Equivalent Car Space)/100 square meters of the total\n\t\t\t\tcovered area\nPublic Buildings Educational or religious building;\nPublic Buildings\n1.5 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tcovered area.\nHospital, nursing home or medical laboratory;\n2.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tcovered area.\nHotel, banquet hall, Club, community centre, Public concert\n\t\t\t\thall or auditorium,\n2.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tplot area.\namusement park or sports complex\n1.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tplot area.\nMuseum or gymnasium\n1.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tcovered area.\nPublic exhibition hall\n2.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tcovered area.\nIndustrial Buildings Manufacturing industry\nIndustrial Buildings\n1.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tcovered area.\nInformation Technology & Information Technology enabled\n\t\t\t\tservices\n2.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tcovered area.\nStorage and Warehouse building Freight depot\nStorage and Warehouse building\n2.0 ECS (Equivalent Car Space)/100 square meters of the\n\t\t\t\tcovered area.\nWarehouses, cold stores, transit shed store, grain elevator or\n\t\t\t\tany other such activity.\n1.0 ECS (Equivalent\n(i) for open parking 23 square meters per equivalent car space.\n(ii) for ground floor covered parking 28 square meters per equivalent car spaces.\n(iii) for basement 32 square meter per equivalent car space:\nProvided further that,-\n(i) Mechanical parking shall be permitted subject to mechanical and structural safety. However, it shall not exceed 20 percent of the total parking requirements. In such case the maintenance for 10 years shall be the responsibility of promoter.\n(ii) Minimum 20 percent of the total required parking shall be on ground floor.\n(iii) Parking in independent floors under stilts shall be permissible beyond stilts within the plot area if, the parking under stilts is not sufficient as per norms. Clear height from the finished level of the ground floor to the under surface of the beam, joint girders or any other horizontal structure member shall be 7'-6\".\n(iv) If there is any doubt regarding the category of any building, the decision of the State Government shall be final.\n(v) Parking for the disabled persons shall also comply with the provisions of \"The Persons with Disability (Equal Opportunities, Protection of Rights and Full Participation) Act, 1995\".",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "20",
"title": "20. Minimum Area of Courtyard.",
"chapter": null,
"content": "clear\none-fourth",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "21",
"title": "21. Dwelling unit.",
"chapter": null,
"content": "(a) One kitchen or kitchen above; and\n(b) One bath room or an enclosed or open bathing platform and water closet; or\n(c) One toilet comprising of a bathroom and a water closet",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "22",
"title": "22. Minimum height of room, verandah and light ventilation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "23",
"title": "23. Provision of lift.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "24",
"title": "24. Basement.",
"chapter": null,
"content": "(a) First level basement upto the extent of 75 percent basement area may be used for habitable purposes in commercial, institutional and residential buildings only subject to the condition that mandatory parking area norms are fulfilled and it shall adequately ventilated and conforming to fire safety norms, public health and structural safety norms . The minimum two entry or exits shall be mandatory for habitable use of basement. Such area shall be counted towards floor area ratio.\n(b) The remaining 25 percent area of first level basement may be put to following uses.-\n(i) Storage of household or other goods of non-combustible material; or\n(ii) Strong rooms, bank cellars, or\n(iii) Air conditioning equipment and other machines used for services and utilities of the building; or\n(iv) Parking\n(c) The basement shall have the following requirements:\n(i) Basement shall be at least 2.5 meter in height from the floor to the underside of the roof slab or ceiling;\n(ii) Adequate ventilation shall be provided for the basement. Any deficiency may be met by providing adequate mechanical ventilation in the form of blowers, exhaust fans, air conditioning system;\n(iii) The minimum height of the ceiling of first level basement shall be 0.9 meters and maximum 1.2 meters above the average surrounding ground level;\n(iv) Adequate arrangement shall be made such that surface drainage does not enter the basement;\n(v) There shall be provisions of sufficient doors in case the basement is used for office or commercial purposes and maximum travel distance from any point to the door shall not exceed 15 meters; and\n(vi) In case, the basement is allowed beyond the building envelope then the level of the basement shall be at the ground floor level and the slabs should be designed to bear the load of fire tenders.",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "25",
"title": "25. Stair case.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "26",
"title": "26. Set back of projected portion of roof level.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "27",
"title": "27. Distance between buildings.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "28",
"title": "28. Street width.",
"chapter": null,
"content": "(i)\nResidential buildings\n10.6 metres (35 feet)\n(ii)\nGroup Housing\n18 metres (60 feet)\n(iii)\nIndependent floors\n12 metres (40 feet)\n(iv)\nLocal level commercial (G+1)\n18 metres ( 60 feet)\n(v)\nCommercial (above 3 storey )\n25 metres (80 feet)\n(vi)\nIndustrial buildings\n12 metres (40 feet)\n(vii)\nNursing home/hospital\n(a) For plot size 1000 square yards to 2000 square yards with\n\t\t\t\tminimum frontage of 60 feet\n40 feet\n(b) For plot size 2001 square yards to 4000 square yards with\n\t\t\t\tminimum frontage of 90 feet\n60 feet\n(c) For plot size 4001 square yards and above with minimum\n\t\t\t\tfrontage of 120 feet\n80 feet\n(viii)\nHotel\n(a) For plot size 1000 square yards to 2000 square yards\n\t\t\t\twith minimum frontage of 60 feet.\n40 feet\n(b) For plot size 2001 square yards to 4000 square yards\n\t\t\t\twith minimum frontage of 90\n60 feet\n(c) For plot size 4001 square yards and above with minimum\n\t\t\t\tfrontage of 120 feet\n80 feet\n(ix)\nMarriage palace\nAs per Marriage Palace Policy notified by the State\n\t\t\t\tGovernment, as amended from time to time\n(x)\nOther buildings\nAs per Master Plan of the area\nNote : No hotel site shall be eligible for incentives under any policy of the State Government having plot size less than 1000 square yards.\nNote : No hotel site shall be eligible for incentives under any policy of the State Government having plot size less than 1000 square yards.\nPart V\nMaterial and Structural Control",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "29",
"title": "29. Fire Protection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "30",
"title": "30. Structural design.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "31",
"title": "31. Plinth level.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "32",
"title": "32. Roof.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "33",
"title": "33. Use of glass.",
"chapter": null,
"content": "Part VI\nPublic Health, Water Supply, Sewerage and Drainage",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "34",
"title": "34. Application for connection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "35",
"title": "35. Material for water connection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "36",
"title": "36. Sanction of water connection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "37",
"title": "37. Release of water connection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "38",
"title": "38. Notice and Certificate of Completion of work.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "39",
"title": "39. Application for connection with public sewer.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "40",
"title": "40. Connection with Public sewer.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "41",
"title": "41. Material for drain and construction.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "42",
"title": "42. Drain connection for trade effluent.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "43",
"title": "43. Waste water pipes.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "44",
"title": "44. Manholes.",
"chapter": null,
"content": "(i)\nFor depth of 0.80 meter\n0.75 x 0.75 meters\n(ii)\nFor depth of more than 0.80 meters but not exceeding 2.1\n\t\t\t\tmeters\n1.2 x 0.90 metres\n(iii)\nFor depths of more than 2.1 meters\nrectangular chamber with minimum internal dimension of 1.20 x\n\t\t\t\t0.90 meter",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "45",
"title": "45. Septic Tank.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "46",
"title": "46. Absorption pits.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "47",
"title": "47. Roof top rain water harvesting and ground water recharging.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 45
},
{
"number": "48",
"title": "48. Electrical installation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "49",
"title": "49. Solar water heating.",
"chapter": null,
"content": "Part VII\nRegistration of Plumbers",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "50",
"title": "50. Registration of Plumbers.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "51",
"title": "51. Grant of registration.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "52",
"title": "52. Renewal of registration.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 50
},
{
"number": "53",
"title": "53. Cancellation of Registration Certificate.",
"chapter": null,
"content": "Part VIII\nMiscellaneous",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "54",
"title": "54. Relaxation.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "55",
"title": "55. Matters not covered under these rules.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "56",
"title": "56. Repeal and saving.",
"chapter": null,
"content": "Schedule\n[ See rule 2 (zm)]\n[ See rule 2 (zm)]\nQualification for registration of Plumber\nQualification for registration of Plumber\n(i) A person having one year certificate in plumbing from any Industrial Training Institute recognized by the State Government; or\n(ii) A person registered as plumber with any local authority or statutory body of the Government of Punjab; or\n(iii) Ten years practical experience in sanitary installation with a firm of repute or under a registered plumber.\nForm A\nForm A\n( See rule 5)\n( See rule 5)\n(Form of Application)\n(Form of Application)\n(b) Plans, elevation and sections of the proposed buildings required by the Punjab Urban Planning and Development Authority (Building) Rules, 2013.\n(c) Water supply, drainage plans, structural stability certificate, scheme for fire safety and fire-fighting system and equipment, electrical scheme for air conditioning and air cooling as required by the rules ibid.\nSignature\n*Strike out the class and classes of buildings not required.\nForm B\nForm B\n(See rule 10 (1))\n(See rule 10 (1))\nNotice of Completion and Permission to Occupy\nNotice of Completion and Permission to Occupy\nDescription of Building\nDescription of Building\nSignature of the Applicant\nForm C\nForm C\n(See rule 10 (1)\n(See rule 10 (1)\nCompletion Certificate By A Registered Architect/engineer\nCompletion Certificate By A Registered Architect/engineer\nSignature (Registered Architect/ Engineer)\nForm D\nForm D\n( See rules 10(2) and 38)\n( See rules 10(2) and 38)\nPermission for Occupancy or use of the Building\nPermission for Occupancy or use of the Building\n(1) Grant permission for the occupation and/or use of the said building; Or\n(2) refuse permission for the occupation and/or use of the said building for reasons given below:-\nCompetent Authority\nForm E\nForm E\n(See rule 11(3))\n(See rule 11(3))\nIntimation for Sanction/rejection of the Building Plan\nIntimation for Sanction/rejection of the Building Plan\n(i) Sanction for the aforesaid construction under rule 10 of the Punjab Urban Planning and Development Authority (Building) Rules, 2013;\n(ii) Rejected for reasons given hereunder:-\n(iii) Sanction subject to the following amendments:-\n(iv) returned for removal of the following defects:-\nSignature Competent Authority\nForm F\nForm F\n( See rule 34)\n( See rule 34)\nApplication For Water Connection\nApplication For Water Connection\nSignature of applicant ......................... Father's name .................................. Address .........................................\nForm G\nForm G\n( See rule 39)\n( See rule 39)\nSignature of applicant ......................... Father's name .................................. Address .........................................\nForm H\nForm H\n( See rule 50)\n( See rule 50)\nForm of Application for Registration as Plumber\nForm of Application for Registration as Plumber\nYours faithfully,\nName __________________\nFull Address _____________\nForm I\nForm I\n( See rule 51)\n( See rule 51)\nForm of Registration Certificate of Plumbers\nForm of Registration Certificate of Plumbers\n(i) The certificate shall remain valid for a period of five years from the date of its issue;\n(ii) It shall be renewable on submission of fresh application along with the prescribed fee provided the application is submitted one month before the expiry date of previous registration;\n(iii) The certification will be operative in the areas in which the Punjab Urban Planning and Development Authority (Building) Rules, 2013 are in operation;\n(iv) It will not be used for the purpose other than the purposes specified under the Punjab Urban and Development Authority (Building) Rules, 2013.\n(v) The Authorized Officer has the right to withdraw or cancel the certificate at any time during the tenure of registration of it is found, that,\n(a) The Plumber has given any wrong information in his application for registration;\n(b) The Plumber has violated any terms and conditions of registration or any provision of the Punjab Regional and Town Planning and Development Act, 1995 or any rule made there under.\nAuthorized Officer\nSerial No.\nDate of renewal\nDate upto which Renewed",
"footnote": "",
"is_definition": false,
"sort_order": 54
}
],
"metadata": {
"Act ID": "pu082",
"Act Number": "Published vide Notification No. G.S.R.54/P.A.11/1995/Ss.43 and 180/2013, dated 25th October, 2013",
"Enactment Date": "",
"Act Year": "2013",
"Short Title": "Punjab Urban Planning and Development Authority Building Rules, 2013",
"Type": "STATE",
"Location": "Punjab"
},
"updated_at": "2026-09-29 21:55:21"
}