78. Rights and liabilities in regard to Bhakra-Nangal and Beas Projects.

(a) the rights to receive and to utilise the water available for distribution as a result of the projects, and
(b) the rights to receive and to utilise the power generated as a result of the projects,
(A) "Beas Project" means the works which are either under construction or are to be constructed as components of the Beas-Sutlej Link Project (Unit I) and Pong Dam Project on the Beas river (Unit II) including -
(i) Beas-Sutlej Link Project (Unit I) comprising -
(a) Pandoh Dam and works appurtenant thereto,
(b) Pandoh-Baggi Tunnel,
(c) Sundernagar Hydel Channel,
(d) Sundernagar-Sutlej Tunnel,
(e) By-pass Tunnel,
(f) four generating units each of 165 M.W. capacity at Dehar Power House on the right side of Sutlej river,
(g) fifth generating unit of 120 M.W. capacity at Bhakra Right Bank Power House,
(h) transmission lines,
(i) Balancing Reservoir;
(ii) Pong Dam Project (Unit II) comprising -
(a) Pong Dam and works appurtenant thereto,
(b) Outlet Works,
(c) Penstock Tunnels,
(d) Power plant with four generating units of 60 M.W. each;
(iii) such other works as are ancillary to the works aforesaid and are of common interest to more than one State;
(B) "Bhakra-Nangal Project" means -
(i) Bhakra Dam, Reservoir and works appurtenant thereto;
(ii) Nangal Dam and Nangal-Hydel Channel;
(iii) Bhakra Main Line and canal system;
(iv) Bhakra Left Bank Power House, Ganguwal Power House and Kotla Power House, switchyards, sub-stations and transmission lines;
(v) Bhakra Right Bank Power House with four units of 120 M.W. each.