35. Environmental consideration during erection of building.

(a) rain water harvesting, consisting storing, treating and use of rain water accumulated in roof, pathway, garden, which amounts not less than 10% of the total water consumption of the users annually of the said plot to be vetted by concerned expert;
(b) alternative sources of energy like solar energy and other which reduces not less than 30% of the average energy consumption (vetted by energy expert) by the users of the plot;
(c) solar passive Architecture, which reduces the load on conventional energy consumption (vetted by energy expert) as well as increases the building efficiency in lighting, ventilation;
(d) use of fly ash bricks, aggregates (at least 50 % of total quantity of brick used for the project) etc. to be vetted by the Sanctioing Authority.