Table
Table
S. No.
S. No.
Category of Marriage Hail
Category of Marriage Hail
Factor
Factor
1
1
2
2
3
3
1.
Where rate of land is upto Rs. 50,000/- per
Square Meter
Rate of Land (Rs. per Sq. Mtr.) 750
2.
Where rate of land is above Rs. 50,000/- but
upto Rs. 1,00.000/- per Square Meter
Rate of Land (Rs. per Sq. .Mtr.) 1000 subject to
a minimum of Rs. 66.67 per Sq. Mtr.
3.
Where rate of land is above Rs. 1,00,000/- per
Square Meter
Rate of Land (Rs. per Sq. Mtr.) 1500 subject to
a minimum of Rs. 100 per Sq. Mtr.
Section 3 • New Composition Scheme for Marriage Hall, 2016
3. Lump sum amount.
new-composition-scheme-for-marriage-hall-2016-sec-3.json
•
Section 3
{
"act_title": "New Composition Scheme for Marriage Hall, 2016",
"act_slug": "new-composition-scheme-for-marriage-hall-2016",
"section_label": "Section",
"section": {
"number": "3",
"title": "3. Lump sum amount.",
"chapter": null,
"content": "Table\nTable\nS. No.\nS. No.\nCategory of Marriage Hail\nCategory of Marriage Hail\nFactor\nFactor\n1\n1\n2\n2\n3\n3\n1.\nWhere rate of land is upto Rs. 50,000/- per\n\t\t\t\tSquare Meter\nRate of Land (Rs. per Sq. Mtr.) 750\n2.\nWhere rate of land is above Rs. 50,000/- but\n\t\t\t\tupto Rs. 1,00.000/- per Square Meter\nRate of Land (Rs. per Sq. .Mtr.) 1000 subject to\n\t\t\t\ta minimum of Rs. 66.67 per Sq. Mtr.\n3.\nWhere rate of land is above Rs. 1,00,000/- per\n\t\t\t\tSquare Meter\nRate of Land (Rs. per Sq. Mtr.) 1500 subject to\n\t\t\t\ta minimum of Rs. 100 per Sq. Mtr.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
"prev_section": "2",
"next_section": "4"
}