82. Non conventional energy resources unit

Annexure-II
Annexure-II
A. Components to be included for computing the value of Plant & Machinery:
(i) Cost of Industrial Plant & Machinery including taxes and duties i.e. cost of mother production equipment used for carrying out manufacturing activities.
(ii) Cost of Productive equipment such as tools, jigs, dyes and moulds, insurance premium etc including taxes and duties.
(iii) Electrical components necessary for plant operation on the plant side from where meter is installed up to the point where finished goods is to be produced/dispatched (i.e. H.T. Motors, L.T. Motors, Switch Boards, Panels, Capacitors, Relay, Circuit Breakers, Panel Boards, Switchgears).
(iv) Freight charges paid for bringing Plant & Machinery and equipment from the supplier's premises to the location of the unit.
(v) Transit Insurance premium paid.
B. Components which will not be considered for computing the value of Plant and Machinery:
(i) Loading and unloading charges
(ii) Miscellaneous fixed assets such as DG sets, Excavation, Handling equipments, electrical components other than those mentioned at A above.
(iii) Working Capital including Raw Material and other consumable stores
(iv) Commissioning cost
(v) Captive Power Plants
(vi) Storage equipments
(vii) Erection and installation charges
(viii) Additional Transformers
Annexure -III
Annexure -III
Composition of District Level Committee
Composition of District Level Committee
1.
The Deputy Commissioner
Chairman
2.
Principal, ITI
Member
3.
Project Officer, DRDA
Member
4.
District/Regional Employment Officer
Member
5.
Assitt. Controller Finance and Accounts, DC
Office
Member
6.
Representative of lead bank
Member
7.
Joint Director/General Manager, DIC
Member-Secretary.