(a) To specify and share the technical standards of Distribution Licensee's system;
(b) To enter into PPA with MGO within one month of receiving application from MGO; and
(c) With Mutual consent, enter into DFA upon receiving application from MGO.
Section 19 • MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016
19. Distribution Licensee.
mperc-micro-grid-renewable-energy-generation-and-supply-regulations-2016-sec-19.json
•
Section 19
{
"act_title": "MPERC (Micro-Grid Renewable Energy Generation and Supply) Regulations, 2016",
"act_slug": "mperc-micro-grid-renewable-energy-generation-and-supply-regulations-2016",
"section_label": "Section",
"section": {
"number": "19",
"title": "19. Distribution Licensee.",
"chapter": null,
"content": "(a) To specify and share the technical standards of Distribution Licensee's system;\n(b) To enter into PPA with MGO within one month of receiving application from MGO; and\n(c) With Mutual consent, enter into DFA upon receiving application from MGO.",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
"prev_section": "18",
"next_section": "20"
}