(a) enter upon any land along with his workmen and survey and take measurements and levels on it,
(b) mark such levels, dig or bore into the sub-soil and do all other acts necessary to ascertain whether the land is suitable,
(c) set out the boundaries of the proposed, highway by placing marks and cutting trenches, and
(d) where otherwise survey can not be completed and the levels taken and the boundaries marked, cut down and clear any part of a standing crop, fence or jungle:
Section 5 • The Manipur Highways Act, 1979
5. Power to enter lands for reconnaissance and preliminary survey in connection with highway scheme.
manipur-highways-act-1979-sec-5.json
•
Section 5
{
"act_title": "The Manipur Highways Act, 1979",
"act_slug": "manipur-highways-act-1979",
"section_label": "Section",
"section": {
"number": "5",
"title": "5. Power to enter lands for reconnaissance and preliminary survey in connection with highway scheme.",
"chapter": null,
"content": "(a) enter upon any land along with his workmen and survey and take measurements and levels on it,\n(b) mark such levels, dig or bore into the sub-soil and do all other acts necessary to ascertain whether the land is suitable,\n(c) set out the boundaries of the proposed, highway by placing marks and cutting trenches, and\n(d) where otherwise survey can not be completed and the levels taken and the boundaries marked, cut down and clear any part of a standing crop, fence or jungle:",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
"prev_section": "4",
"next_section": "6"
}