6. Preparation of schemes.

(a) the objects of the scheme;
(b) the extent of the area of the lands required to be acquired for the execution of the scheme;
(c) the extent of the area likely to be reclaimed and benefited after completion of the scheme;
(d) the names of the owners, occupiers or holders (including the Government), whose lands are required to be acquired and their survey numbers;
(e) the names of the owners, occupiers or holders (including the Government), whose lands will be benefited by, or will be protected under, the scheme and their survey numbers;
(f) the type of embankment and other works required to be constructed or maintained for efficient functioning of the scheme;
(g) a detailed estimate of the cost of the scheme, along with detailed layout drawings and drawings showing structural details;
(h) such other particulars as may be prescribed.