15. Repeal and saving.

(a) any thing done or any action taken or purposed to have been done or taken including any rule, notification, inspection, order or notice made or issued or any licence, permission or exemption granted or any direction given under the repealed Act shall, in so for as it is not inconsistent with the provisions of this Act, be deemed to have been done or taken under the corresponding provisions of this Act;
(b) rules made under the repealed Act shall have effect until the rules under Section 13 are made;
(c) all directives issued before the commencement of this Act by the State Government under the repealed Act shall continue to apply until directions are issued under this Act.
Schedule
[ See Section 3 (1)]
[ See Section 3 (1)]
Part-A
Electricity sold/supplied for the purposes as shown below:-
Electricity sold/supplied for the purposes as shown below:-
S. No.
S. No.
Consumer Category
Consumer Category
Consumed Electricity (in unit)
Consumed Electricity (in unit)
Rate of duty in percentage of tariff per unit
of electricity per month
Rate of duty in percentage of tariff per unit
of electricity per month
(1)
(1)
(2)
(2)
(3)
(3)
(4)
(4)
1.
Domestic consumer
Upto 100 units
9 percent
In excess of 100 units upto 200 units
12 percent
in excess of 200 units.
15 percent
2.
non Domestic consumer
Upto 50 units
9 percent
In excess of 50 units
15 percent
3.
Mines (other than captive mines of cement
industries.)
40 percent
4.
Cement industries (including its captive mines)
15 percent
5.
LT Industries
9 percent
6.
Stone Crusher upto 150 HP
9 percent
7.
Mini Steel Plant, Rolling Mills and Sponge Iron
Plant.
9 percent
8.
Power-Looms, Flour Mills, Oil expeller, thresher
and similar other machinery used for agricultural processing.
9 percent
9.
Textile mills, weaving mills and spinning mills
9 percent
10.
H. T. Industrial and Non Industrial including
shopping mall. Stone Crusher having load above 150 HP and
situated outside & adjacent to the mines..
15 percent
Part-B
[ See Section 3 (2)]
[ See Section 3 (2)]
See Section 3 (2)]
See
11.
For consumption of electricity obtained through
open access from outside the State.
The rate of duty shall be calculated as if the
electricity is supplied by Distribution Licensee.
Part- C
[ See Section 3 (3)]
[ See Section 3 (3)]
12.
Electricity sold or supplied by Generating
company, Producer and Captive Generating Plant to State owned
Distribution and Trading Licensee.
5 paise per unit
13.
Electricity sold or supplied by Generating
company, producer and Captive Generating Plant to any other
consumer in the State.
The rate of duty shall be same as if the
electricity is supplied by the Distribution Licensee to that
consumer.
14.
For the electricity consumed by Captive
Generating Plants, Producers or Generating Companies for their
auxiliary consumption and for their own consumption.
15 percent of the tariff which would have been
applicable if the electricity is supplied by Distribution
Licensee.
Explanation. - For the purposes of this Schedule-
Explanation.
(a) "month" means such period as may be prescribed and till such period is prescribed, the billing month;
(b) "mine" means a mine to which the Mines Act, 1952 (No. 35 of 1952) applies and incudes the premises or machinery situated in or adjacent to a mine and used for crushing, processing, treating or transporting the mineral;
(c) The electricity duty shall be calculated on the basis of actual percentage of tariff in a month and fraction of 50 paise and above will be rounded off to the next higher rupee and the fraction of less than 50 paise will be ignored;
(d) "tariff" means the rate of electricity per unit as may be determined from time to time by the Madhya Pradesh Electricity Regulatory Commission of the various categories of consumption;