(i) Prior to the commencement of every crops season (kharif & rabi) the Managing Committees and Competent Authority of every Farmers' Organisation shall undertake to assess the condition of the system (system diagnosis) through a participatory walk through exercise.
(ii) The Farmers' Organisation shall inspect each and every hydraulic structure and record its status.
(i) Normal Operation and Maintenance Works which includes ordinary repairs, such as :-
(a) Desilting;
(b) Weed removal;
(c) Embankment repairs;
(d) Revetment;
(e) Repairs to shutters;
(f) Repairs to masonry and lining;
(g) Cleaning & Oiling of screw gearing shutters;
(h) Painting of hoists and gates etc.;
(i) Emergent breach closing works; and
(j) Maintenance of inspection paths.
(ii) Deferred Maintenance Works (Rehabilitation Works) :-
(a) Reconstruction of sluices;
(b) Reconstruction/repairs to drops regulators;
(c) Reconstruction of measuring devices;
(d) Rehabilitation of the system; and
(iii) Original Works :-
(a) Modernisation of the System; and
(b) Any other construction works in the irrigation system. The above works shall be executed by the Farmers' Organisation, under the supervision of the Water Resources Department at the rates not exceeding estimated rates.
Identification of normal operation and maintenance works-participatory walk-through.
Prioritising Works.
Preparation of estimates.
Administrative approval.
Technical Clearance.
(i) Special Repairs:
Special Repairs:
(a) Executive Engineer
:
Upto Rs. 1,00,000/-
(b) Superintending Engineer
:
Upto Rs. 10,00,000/-
(c) Chief Engineer
:
Full Power
(ii) Ordinary repairs :
Ordinary repairs :
(a) Sub-Engineer
:
Upto Rs. 20,000/-
(Competent
Authority)
:
(b) Assistant Engineer
:
Upto Rs. 50,000/-
(c) Executive Engineer
:
Full powers within the funds provided to Farmers’
Organisation.]
(b) a Competent Authority may accord the technical clearance vested in an authority lower than him;
(c) the Competent Authority, shall record all the technical clearances in the register of technical clearance in Form I appended to the rules;
(d) the technical clearance shall not exceed the Administrative approval;
(e) in respect of a Distributory Committee, the Project Committee, the Competent Authority may cause the technical clearance to be given by an appropriate officer under his control as per the financial powers mentioned in clause (a).
Manner of taking up works.
(b) Under no circumstances, Chairperson/President, or Managing Committee Member of the Farmers' Organisation execute work directly in his individual capacity;
(c) The cost of works executed shall not exceed the estimated costs; and
(d) The Competent Authority shall record the initial measurements and final measurements for quantifying the work done for making payments by the Farmers' Organisation.
Maintenance and Adherence to the Designed Hydraulic Particulars.
Limitations on Works.
Publication of List of Works to be taken up.
(b) Along with the lists other particulars of works, estimates, values, and mode of execution should be given wide publicity; and
(c) If any member wishes to have access to any of the records relating to works to be taken up, he may do so on payment of the fee as fixed by the Farmers' Organisation.
Freedom to Add Other Funds or Extra Contributions.
Proof of Works Done.
Payment for the Works Done.
Original Works.
(a) Specific approval shall be obtained from the authority vested with such powers to do so.
(b) The estimates for works shall be prepared by the Water Resources Department and works shall be let out to the Farmers' Organisation wherever they come forward for execution of such works at the estimated rates.
(c) If the Farmers' Organisation agrees to take up any work, an agreement shall be entered into with the Water Resources Department.
(d) Payments shall be made to the Farmers' Organisation based on the out turn of work on fortnightly basis or even earlier as may be mutually decided.
(e) Where the Farmers' Organisation does not come forward the procedure as prescribed under the "Works Department Manual" shall be "followed or as per any direction given by the Government from time to time.
Section 7 • M.P. Farmers' Organisation Rules, 1999
7. Procedure for taking up works.
m-p-farmers-organisation-rules-1999-sec-7.json
•
Section 7
{
"act_title": "M.P. Farmers' Organisation Rules, 1999",
"act_slug": "m-p-farmers-organisation-rules-1999",
"section_label": "Section",
"section": {
"number": "7",
"title": "7. Procedure for taking up works.",
"chapter": null,
"content": "(i) Prior to the commencement of every crops season (kharif & rabi) the Managing Committees and Competent Authority of every Farmers' Organisation shall undertake to assess the condition of the system (system diagnosis) through a participatory walk through exercise.\n(ii) The Farmers' Organisation shall inspect each and every hydraulic structure and record its status.\n(i) Normal Operation and Maintenance Works which includes ordinary repairs, such as :-\n(a) Desilting;\n(b) Weed removal;\n(c) Embankment repairs;\n(d) Revetment;\n(e) Repairs to shutters;\n(f) Repairs to masonry and lining;\n(g) Cleaning & Oiling of screw gearing shutters;\n(h) Painting of hoists and gates etc.;\n(i) Emergent breach closing works; and\n(j) Maintenance of inspection paths.\n(ii) Deferred Maintenance Works (Rehabilitation Works) :-\n(a) Reconstruction of sluices;\n(b) Reconstruction/repairs to drops regulators;\n(c) Reconstruction of measuring devices;\n(d) Rehabilitation of the system; and\n(iii) Original Works :-\n(a) Modernisation of the System; and\n(b) Any other construction works in the irrigation system. The above works shall be executed by the Farmers' Organisation, under the supervision of the Water Resources Department at the rates not exceeding estimated rates.\nIdentification of normal operation and maintenance works-participatory walk-through.\nPrioritising Works.\nPreparation of estimates.\nAdministrative approval.\nTechnical Clearance.\n(i) Special Repairs:\nSpecial Repairs:\n(a) Executive Engineer\n:\nUpto Rs. 1,00,000/-\n(b) Superintending Engineer\n:\nUpto Rs. 10,00,000/-\n(c) Chief Engineer\n:\nFull Power\n(ii) Ordinary repairs :\nOrdinary repairs :\n(a) Sub-Engineer\n:\nUpto Rs. 20,000/-\n(Competent\n\t\t\t\tAuthority)\n:\n(b) Assistant Engineer\n:\nUpto Rs. 50,000/-\n(c) Executive Engineer\n:\nFull powers within the funds provided to Farmers’\n\t\t\t\tOrganisation.]\n(b) a Competent Authority may accord the technical clearance vested in an authority lower than him;\n(c) the Competent Authority, shall record all the technical clearances in the register of technical clearance in Form I appended to the rules;\n(d) the technical clearance shall not exceed the Administrative approval;\n(e) in respect of a Distributory Committee, the Project Committee, the Competent Authority may cause the technical clearance to be given by an appropriate officer under his control as per the financial powers mentioned in clause (a).\nManner of taking up works.\n(b) Under no circumstances, Chairperson/President, or Managing Committee Member of the Farmers' Organisation execute work directly in his individual capacity;\n(c) The cost of works executed shall not exceed the estimated costs; and\n(d) The Competent Authority shall record the initial measurements and final measurements for quantifying the work done for making payments by the Farmers' Organisation.\nMaintenance and Adherence to the Designed Hydraulic Particulars.\nLimitations on Works.\nPublication of List of Works to be taken up.\n(b) Along with the lists other particulars of works, estimates, values, and mode of execution should be given wide publicity; and\n(c) If any member wishes to have access to any of the records relating to works to be taken up, he may do so on payment of the fee as fixed by the Farmers' Organisation.\nFreedom to Add Other Funds or Extra Contributions.\nProof of Works Done.\nPayment for the Works Done.\nOriginal Works.\n(a) Specific approval shall be obtained from the authority vested with such powers to do so.\n(b) The estimates for works shall be prepared by the Water Resources Department and works shall be let out to the Farmers' Organisation wherever they come forward for execution of such works at the estimated rates.\n(c) If the Farmers' Organisation agrees to take up any work, an agreement shall be entered into with the Water Resources Department.\n(d) Payments shall be made to the Farmers' Organisation based on the out turn of work on fortnightly basis or even earlier as may be mutually decided.\n(e) Where the Farmers' Organisation does not come forward the procedure as prescribed under the \"Works Department Manual\" shall be \"followed or as per any direction given by the Government from time to time.",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
"prev_section": "6",
"next_section": "8"
}