Annexure-3
Annexure-3
Determination of Connected Load
Determination of Connected Load
Domestic Connection
Domestic Connection
Item
Load per item (Watts)
No.
Total load (Watts)
1
2
3
4 = 2 x 3
Bulb
60
Tube light
50
Fan
60
Tape-recorder/Music system
100
Television
90
Mixie
375
Electronic iron
750
Fridge
150
Cooler
250
Heater (for cooking and water heating)
1000
Washing machine
750
Geyser
2000
Microwave oven
2000
Air Conditioner (1 ton)
1500
Air Conditioner (1.5 ton)
2250
Computer
100
Printer
150
Pump-set
375
Total
(a) Spare socket points/holders shall not be counted towards connected load.
(b) In some domestic connections Geyser, Room Heater and Air-conditioner (without heater) are installed. If both Geyser(s) and Room Heater(s) are present, the load of these two types of items shall be added and compared with the load of Air-conditioner(s). The higher load between the two (that is load of Geyser(s) plus Room Heater(s) vis-a-vis load of Air-conditioner(s) shall be considered for determination of connected load.
Signature of the Consumer
Signature of the licensee's representative
Date :.....................
Date :.....................
Place :...................
Place :.....................
Annexure-4
Annexure-4
Test Report
Test Report
To be filled up by licensed Electrical Contractor
Book No..........................
Form No...............
To be filled up by the licensee
To be filled up by the licensee
To be filled up by the licensed electrical contractor
To be filled up by the licensed electrical contractor
(a) I have........... class license valid till................. The license number is...........
(b) I have completed this work for Mr./Mrs./Ms.............. for his.........
Details of Job
Details of Job
Sl. No.
Item
220/230 Volts
440/400 Volts
Red Phase
Green Phase
Blue Phase
No.
Total Watts
No.
Total Watts
No.
Total Watts
No.
Total Watts
1
2
3
4
5
6
7
(c) (i) The particulars of the employees who executed the job are tabulated below.
Sl. No.
Name of the Wireman/Trainee
Designation
Period
From
To
(ii) The work was carried out under the supervision of.............. (Supervisor Wireman) whose certificate number is........ He is responsible for work carried out during the period...............
(d) This installation specifications adhere to all the provisions of India Electricity Rules, 1956.
(a)
The installed switches are of correct ratings:
Yes/No
(b)
All the switches and wiring are permanent and of correct
specifications
Yes/No
(c)
All plugs are of three pin type and controlled by separate
switches
Yes/No
(d)
All the Single Pole switches connected to the phase
Yes/No
(e)
Required permanent mark is provided on the main-switch board
for Neutral point
Yes/No
(f)
Arrangement for earthing is according to Rule 61 of Indian
Electricity Rules, 1956
Yes/No
(g)
In case of three phase installation
Yes/No
(i) Danger board, fire extinguisher with buckets, shock chart
and first aid kit have been provided for
Yes/No
(ii) The installation specifications of the switch board is as
per Rule 15 of Indian Electricity Rules, 1956
Yes/No
Date of testing..............
Insulation of Earth
Insulation between conductors
Phase 1
Phase 2
Phase 3
Earth Resistance
Date of testing
Electrode No. 1
Electrode No. 2
Signature of the Licensed Electrical Contractor
Certificate from Supervisor wireman
Certificate from Supervisor wireman
Signature of Supervisor wireman
Receipt
Receipt
Signature of Officer in Charge
Name
Designation
Date
Certificate from Supervisor wireman
Certificate from Supervisor wireman
Signature of Supervisor, wireman
Receipt
Receipt
Signature of Officer in Charge
Name
Designation
Date
Section 13 • M.P. Electricity Supply Code, 2004
13. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with the agreement after completion of formalities.
m-p-electricity-supply-code-2004-sec-13.json
•
Section 13
{
"act_title": "M.P. Electricity Supply Code, 2004",
"act_slug": "m-p-electricity-supply-code-2004",
"section_label": "Section",
"section": {
"number": "13",
"title": "13. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with the agreement after completion of formalities.",
"chapter": null,
"content": "Annexure-3\nAnnexure-3\nDetermination of Connected Load\nDetermination of Connected Load\nDomestic Connection\nDomestic Connection\nItem\nLoad per item (Watts)\nNo.\nTotal load (Watts)\n1\n2\n3\n4 = 2 x 3\nBulb\n60\nTube light\n50\nFan\n60\nTape-recorder/Music system\n100\nTelevision\n90\nMixie\n375\nElectronic iron\n750\nFridge\n150\nCooler\n250\nHeater (for cooking and water heating)\n1000\nWashing machine\n750\nGeyser\n2000\nMicrowave oven\n2000\nAir Conditioner (1 ton)\n1500\nAir Conditioner (1.5 ton)\n2250\nComputer\n100\nPrinter\n150\nPump-set\n375\nTotal\n(a) Spare socket points/holders shall not be counted towards connected load.\n(b) In some domestic connections Geyser, Room Heater and Air-conditioner (without heater) are installed. If both Geyser(s) and Room Heater(s) are present, the load of these two types of items shall be added and compared with the load of Air-conditioner(s). The higher load between the two (that is load of Geyser(s) plus Room Heater(s) vis-a-vis load of Air-conditioner(s) shall be considered for determination of connected load.\nSignature of the Consumer\nSignature of the licensee's representative\nDate :.....................\nDate :.....................\nPlace :...................\nPlace :.....................\nAnnexure-4\nAnnexure-4\nTest Report\nTest Report\nTo be filled up by licensed Electrical Contractor\nBook No..........................\nForm No...............\nTo be filled up by the licensee\nTo be filled up by the licensee\nTo be filled up by the licensed electrical contractor\nTo be filled up by the licensed electrical contractor\n(a) I have........... class license valid till................. The license number is...........\n(b) I have completed this work for Mr./Mrs./Ms.............. for his.........\nDetails of Job\nDetails of Job\nSl. No.\nItem\n220/230 Volts\n440/400 Volts\nRed Phase\nGreen Phase\nBlue Phase\nNo.\nTotal Watts\nNo.\nTotal Watts\nNo.\nTotal Watts\nNo.\nTotal Watts\n1\n2\n3\n4\n5\n6\n7\n(c) (i) The particulars of the employees who executed the job are tabulated below.\nSl. No.\nName of the Wireman/Trainee\nDesignation\nPeriod\nFrom\nTo\n(ii) The work was carried out under the supervision of.............. (Supervisor Wireman) whose certificate number is........ He is responsible for work carried out during the period...............\n(d) This installation specifications adhere to all the provisions of India Electricity Rules, 1956.\n(a)\nThe installed switches are of correct ratings:\nYes/No\n(b)\nAll the switches and wiring are permanent and of correct\n specifications\nYes/No\n(c)\nAll plugs are of three pin type and controlled by separate\n switches\nYes/No\n(d)\nAll the Single Pole switches connected to the phase\nYes/No\n(e)\nRequired permanent mark is provided on the main-switch board\n for Neutral point\nYes/No\n(f)\nArrangement for earthing is according to Rule 61 of Indian\n Electricity Rules, 1956\nYes/No\n(g)\nIn case of three phase installation\nYes/No\n(i) Danger board, fire extinguisher with buckets, shock chart\n and first aid kit have been provided for\nYes/No\n(ii) The installation specifications of the switch board is as\n per Rule 15 of Indian Electricity Rules, 1956\nYes/No\nDate of testing..............\nInsulation of Earth\nInsulation between conductors\nPhase 1\nPhase 2\nPhase 3\nEarth Resistance\nDate of testing\nElectrode No. 1\nElectrode No. 2\nSignature of the Licensed Electrical Contractor\nCertificate from Supervisor wireman\nCertificate from Supervisor wireman\nSignature of Supervisor wireman\nReceipt\nReceipt\nSignature of Officer in Charge\nName\nDesignation\nDate\nCertificate from Supervisor wireman\nCertificate from Supervisor wireman\nSignature of Supervisor, wireman\nReceipt\nReceipt\nSignature of Officer in Charge\nName\nDesignation\nDate",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
"prev_section": "12",
"next_section": null
}