← Back to M.P. Beer and Wine Rules

3. Construction or Establishment of Brewery/Manufactory.

(a) detailed plan in quadruplicate of the proposed unit drawn to scale on sheets of tracing cloth;
(b) A challan in proof of payment of fee prescribed by the State Government;
(c) The plan referred to in clause (a) shall contain complete details of the proposed unit including the land buildings, fixtures etc. it will clearly indicate the exact location and dimensions of all the rooms, floors, storeys, windows and other openings. The precise location where vats, vessels, tanks, pipelines, valves, revenue locks, electric or gas conduits, refrigeration or heating systems and any other apparatus, appliance, gadget, equipment or machinery shall be installed, fitted or used alongwith details about their capacity, size, use etc. must appear in the plan. The manner in which the rooms, halls or buildings comprised in the premises shall be utilized must be specified in the layout. The points where revenue locks shall be attached, may be indicated by the symbol RL;
(d) A detailed project report of the brewery or manufactory in quadruplicate;
(e) A statement in quadruplicate giving in detail the process desired to be adopted for manufacturing beer or wine;
(f) Any other certificate, authorisation or clearance required from Central Government, a Local Body, Town and Country Planning Authority or Department, Madhya Pradesh Pollution Control Board or any other authority or department of the State Government under any enactment or rules, in force.
(ii) Where it appears that the application is not complete in all material particulars or is not accompanied by the required documents the State Government or the Excise Commissioner or any other Officer authorised in his behalf shall by a notice served by registered post in writing, requiring the applicant to make good the omission or as the case may be, to furnish the documents not later that 30 (thirty) days from the date of communication of the said notice. An application for the grant or renewal made under these rules shall not be refused by the Sanctioning Authority only on the ground that application is not complete in all material particulars or is not accompanied by the documents.