← Back to Directory
Kerala Electricity Supply Code, 2005
Kerala Electricity Supply Code, 2005
Sections
1. Short title and commencement.
Section 12. Definitions.
Section 23. Code Review Panel.
Section 31. A Chairman, not below the rank of a Chief Engineer or equivalent level of the Board or its successor body engaged in distribution;
Section 12. One member from SLDC;
Section 23. One member representing each of other Distribution Licensees;
Section 34. One member from Rural Electricity Cooperative Societies, if any;
Section 45. One member representing each of Domestic, LT Industry and Agricultural Consumer Sectors;
Section 56. One member representing HT/EHT consumer sector;
Section 67. One member representing captive generation/non conventional energy sectors;
Section 78. One member representing legal profession;
Section 89. One member representing Officers / Engineers' Associations.
Section 910. One member representing Electricity Workers' Unions;
Section 1011. An additional member representing the Board shall act as member secretary of the Review Panel and coordinate its activities till such time the State Transmission Utility is formed.
Section 114. Point of Supply.
Section 45. Application for supply.
Section 56. Duty of the Licensee to supply electricity.
Section 67. Power to recover expenditure.
Section 78. Time frame for providing supply.
Section 89. Withdrawal of application.
Section 910. Delay on the part of applicant to take supply.
Section 1011. Priority for release of connection.
Section 1112. Dues of previous consumer.
Section 1213. Security for supply of electricity and meter.
Section 1314. Initial Security Deposit.
Section 1415. Security for the electric line or electrical plant.
Section 1516. Interest on Security Deposits.
Section 1617. Refund of Security Deposit.
Section 1718. Recovery of charges for supply.
Section 1819. Meter reading.
Section 1920. Reading of meter on request.
Section 2021. Contents of bill.
Section 2122. Payment of electricity bill.
Section 2223. Interest charges for belated payment.
Section 2324. Disputes in bill.
Section 2425. Disconnection of supply of electricity by Licensee.
Section 2526. Action for reconnection.
Section 2627. Action against tampering, distress or damage to electrical plant, electric lines or meter.
Section 2728. Entry of the Licensee to premises.
Section 2829. Notice to the consumer.
Section 2930. Terms and Conditions of supply.
Section 3031. Power to remove difficulties.
Section 31
kerala-electricity-supply-code-2005.json
•
42 Sections
•
Kerala
{
"id": 18586,
"slug": "kerala-electricity-supply-code-2005",
"title": "Kerala Electricity Supply Code, 2005",
"short_title": "Kerala Electricity Supply Code, 2005",
"act_number": "Published vide Notification No. 1/1/KERC-2005/IV, ",
"act_year": 2005,
"act_type": "STATE",
"location": "Kerala",
"law_status": "unknown",
"enactment_date": null,
"description": "Kerala Electricity Supply Code, 2005",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title and commencement.",
"chapter": null,
"content": "Object & Reasons 6\nStatement of Objects And Reasons.",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) 'Act' means the Electricity Act, 2003 (Central Act 36 of 2003) as in force from time to time;\n(b) 'Agreement' with its grammatical variations and cognate expressions means an agreement entered into between the Licensee and the consumer under this Code;\n(c) 'Apparatus' means electrical apparatus and includes all machines, fittings, accessories and appliances in which conductors are used;\n(d) 'Approved' means any tariffs or documents approved by the Commission;\n(e) 'Area of supply' means the geographic area within which a Licensee is authorised by his licence to supply electricity;\n(f) 'Bank rate' means the rate at which the Reserve Bank of India is prepared to buy or rediscount bills of exchange or other commercial paper eligible for purchase under the RBI Act, 1934;\n(g) 'Bill date' means the date on which bill is prepared by distribution Licensee which shall not be later than 4 days from meter reading date;\n(h) 'Billing period' means the period between two consecutive meter reading dates;\n(i) 'Board' means the Kerala State Electricity Board;\n(j) 'Code' means Kerala Electricity Supply Code, 2005 as in force from time to time;\n(k) 'Commission' means the Kerala State Electricity Regulatory Commission;\n(l) 'Connected Load' means the sum of rated capacities in terms of kW or KVA of all connected energy consuming devices in the consumer's installation. For the purpose of levy of any charges or tariffs or determining connected load, plugs with no appliance connected, having 5 amps/15 amps shall be treated 60W / 500 W respectively. If any equipment is connected to a plug point, equipment's load alone shall be considered. Load of fire protection equipment shall not be considered for assessing the connected load if the same is connected to standby generator. In case of HT and EHT connections, the contract demand shall be treated as the connected load;\n(m) 'Consumer' means any person who is supplied with electricity for his own use by a Licensee or the Government or by other person engaged in the business of supplying electricity to the public under the Act or any other law for the time being in force and includes any person whose premises are for the time being connected for the purpose of receiving electricity with the works of a Licensee, the Government or such other person, as the case may be. A consumer is:\n(i) 'Low Tension Consumer' (LT Consumer) if he avails supply from the Licensee at low or medium voltage;\n(ii) 'High Tension Consumer' (HT Consumer) if he avails supply from the Licensee at High Voltage;\n(iii) Extra High Tension Consumer (EHT Consumer) if he avails supply from the Licensee at Extra High Voltage;\n(n) 'Consumer's installation' means any composite electrical unit including electric wires, fittings, motors and apparatus, portable or stationary, erected and wired by or on behalf of the consumer at the consumer's premises;\n(o) 'Contract Demand' means the maximum load in KVA mentioned in the agreement;\n(p) 'Cut-out' means any appliance for automatically interrupting the transmission of energy through any conductor when the current rises above a predetermined level, and shall also include fusible cut-out;\n(q) 'Distributing Main' means the portion of any main with which a service line is, or is intended to be, immediately connected;\n(r) 'Electric Line' means any line, which is used for carrying electricity for any purpose and includes;\n(i) Any support for any such line, that is to say any structure, tower, pole or other thing in, on, by or from which any such line is, or may be, supported, carried or suspended; and\n(ii) Any apparatus connected to any such line for the purpose of carrying electricity;\n(s) 'Energy' means electrical energy; generated, transmitted, used or supplied for any purpose;\n(t) 'Extra High Voltage' means the voltage, which exceeds 33000 volts subject, however to the percentage variation allowed under the Indian Electricity Rules, 1956 or as per new Rules framed as per provisions of the Act;\n(u) 'High Voltage' (HV) means the voltage higher than 650 volts but which does not exceed 33, 000 volts under normal conditions subject however to the percentage variation allowed under the Indian Electricity Rules, 1956 or as per new Rules framed as per the provisions of the Act;\n(v) 'Installation' means any composite electrical unit used for the purpose of generating, transforming, transmitting, converting, distributing, trading or utilising energy;\n(w) 'Licensed Electrical Contractor' means a contractor licensed under rule 45 of the Indian Electricity Rules, 1956 or as per new Rules framed as per the provisions of the Act;\n(x) 'Licensee' means a distribution Licensee under Section 14 of the Act;\n(y) 'Low Voltage' (LV) means the voltage, which does not exceed 250 volts under normal conditions subject however to the percentage variation allowed under the Indian Electricity Rules, 1956 or as per new Rules to be framed as per the provisions of the Act;\n(z) 'Maximum Demand' means the average amount of kW or KVA, as the case may be, delivered to the point of supply of the consumer and recorded during the thirty minutes period of maximum use in the month, the Licensee however reserves the right to shorten this period in special case if necessary with the approval of the Commission;\n(aa) 'Medium Voltage' means the voltage higher than 250 volts but which does not exceed 650 volts under normal conditions subject however to the percentage variation allowed under Indian Electricity Rules, 1956 or as per new Rules framed as per the provisions of the Act;\n(bb) 'Multi-stored (High rise) buildings' means building exceeding 15 M in height from ground level;\n(cc) 'Occupier' means the owner or person in occupation of the premises where energy is used or proposed to be used;\n(dd) 'Power Factor' means the average power factor for a billing period and shall be the ratio of the total kilowatt hours to the total kilovolt ampere hours supplied during that period, ratio being rounded off to two decimal figures. In case KVAH reading is not available, then power factor shall be calculated on the basis of KVARH reading, if the meter is capable of recording KVARH;\n(ee) 'Premises' include any land, building or structure;\n(ff) 'Service Line' means any electric-supply line through which energy is, or is intended to be supplied :\n(i) to a single consumer either from a distribution main or immediately from the Distribution Licensee's premises; or\n(ii) from a distribution main to a group of consumers on the same premises or on contiguous premises supplied from the same point of the distributing main.\n(gg) 'System' means an electrical system in which all the conductors and apparatus are electrically connected to a common source of electric supply.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Code Review Panel.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "1",
"title": "1. A Chairman, not below the rank of a Chief Engineer or equivalent level of the Board or its successor body engaged in distribution;",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "2",
"title": "2. One member from SLDC;",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "3",
"title": "3. One member representing each of other Distribution Licensees;",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "4",
"title": "4. One member from Rural Electricity Cooperative Societies, if any;",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "5",
"title": "5. One member representing each of Domestic, LT Industry and Agricultural Consumer Sectors;",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "6",
"title": "6. One member representing HT/EHT consumer sector;",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "7",
"title": "7. One member representing captive generation/non conventional energy sectors;",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "8",
"title": "8. One member representing legal profession;",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "9",
"title": "9. One member representing Officers / Engineers' Associations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "10",
"title": "10. One member representing Electricity Workers' Unions;",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "11",
"title": "11. An additional member representing the Board shall act as member secretary of the Review Panel and coordinate its activities till such time the State Transmission Utility is formed.",
"chapter": null,
"content": "Chapter II\nSystem Of Supply",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "4",
"title": "4. Point of Supply.",
"chapter": null,
"content": "(a) Low Tension (LT) Supply\n(i) Single phase 240 Volts between each phase and neutral.\n(ii) Three phase 415 Volts between phases.\n(b) High Tension (HT) Supply\n(i) Three phase 11,000 Volts (11KV) between phases.\n(ii) Three phase 22,000 volts (22 KV) between phases\n(iii) Three phase 33,000 Volts (33KV) between phases\n(c) Extra High Tension (EHT) Supply\n(i) Three phase 66,000 volts (66 KV) between phases\n(ii) Three phase 110,000 Volts (110 KV) between phases\n(iii) Three phase 220,000 Volts (220kV) between phases\n(iv) Three phase 400,000 Volts (400kV) between phases.\n(a) by more than 6 per cent in the case of low or medium voltage;\n(b) by more than 6 per cent on the higher side or by more than 9 per cent on the lower side in the case of high voltage; and\n(c) In the case of extra-high voltage, by more than 10 percent on the higher side or by more than 12.5 percent on the lower side.\nSupply Voltage\nSupply Voltage\nMaximum Connected Load\nMaximum Connected Load\nMaximum Contract Demand\nMaximum Contract Demand\n240 V\n5 kW\n-\n415V\n100 KVA-\n-\n11 KV\n-\n3000 KVA\n22 KV/33 KV\n-\n6000 KVA\n66 KV\n-\n8000 KVA\n110 KV\n-\n20000 KVA\n220 KV\n-\n>20000kVA\nChapter III\nSupply Of Energy",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "5",
"title": "5. Application for supply.",
"chapter": null,
"content": "System of supply\nSystem of supply\nApplication fee (Rs.)\nApplication fee (Rs.)\nLT supply\nRs. 25\nHT supply\nRs. 1000\nEHT supply\nRs. 5000",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "6",
"title": "6. Duty of the Licensee to supply electricity.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "7",
"title": "7. Power to recover expenditure.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "8",
"title": "8. Time frame for providing supply.",
"chapter": null,
"content": "(a) The Licensee shall provide electricity connection within one month of the receipt of application in accordance with clause 5 in cases where no extension of distributing main is required.\n(b) The Licensee shall inspect the applicant's premises and prepare cost estimates including initial security deposits and notify the applicant within 7 days from the date of application.\n(c) The cost estimates for LT consumers shall include the cost of service line and terminal arrangements at the premises of the applicant but shall not include the cost of meter.\n(d) In case of HT consumers, the Licensee shall include the cost of service line, terminal arrangements and transformers specifically required for the applicant, but shall not include the cost of meter.\n(e) The Licensee shall give the applicant not less than 7 days for remitting the required expenses and security deposits and shall release the connection within one month from the receipt of completed application.\n(f) The priority for releasing connections shall be the date of remittance of required expenses and security deposits.\n(a) After the receipt of application as provided in clause 5, if the Licensee finds that the supply of electricity to premises applied for requires extension of electric lines, the Licensee shall work out expenses, if any, for such extension subject to clause 7(1) and intimate the applicant within fifteen (15) days of receipt of application.\n(b) The Licensee may require the applicant to pay the amount worked out and intimated under sub-clause (a) above within a period of 15 days or such extended period as the Licensee may allow at the request of the applicant.\n(c) After receipt of required amount from the applicant, the Licensee shall complete the works under sub-clause (a) and release the connection within the time frame given below:\nSl.No.\nSl.No.\nType of work\nType of work\nUnit\nUnit\nTime frame\nTime frame\n1\nLT Line\nPer kM\n30 days\n2\n11 KV line\nPer kM\n4 months\n3\n66 KV / 110\nUpto first 5 kM Next 5 km each\n1 year 3 months\n4\n220 KV line\nUpto first 5 kM Next 5 kM each\n2 years 6 months\n(d) If the connection under sub-clause 2(a) requires completion of any projects approved by the Commission as part of the investment plan of the Licensee, the Licensee shall complete such projects within the time frame approved by the Commission and release connection.\n(a) After the receipt of application as provided under clause 5, if the Licensee finds that supply of electricity to premises applied requires commissioning of a new substation which is not covered as part of the investment plan approved by the Commission, the Licensee shall inspect the premises of the applicant and prepare the cost estimate for the works and intimate the applicant within one month of receipt of application.\n(b) The Licensee may require the applicant to pay the cost estimate worked out under sub-clause 3(a) within a period of one month or such extended period as the Licensee may allow at the request of the applicant.\n(c) After receipt of required amount from the applicant, the Licensee shall complete the works under sub-clause 3(a) and release the connection within the time frame given below:\nType of work\nType of work\nTime frame\nTime frame\n1\n11/0.4 KV Substation alone\n2 months\n2\n33/11 KV Substation alone\n9 months\n3\n66/11 KV Substation alone\n12 months\n4\nExtension of bay at 66 KV Substation\n6 months\n5\n110/66 KV Substation\n12 months\n6\nExtension of bay at 110 KV Substation\n6 months\n7\n220 KV Substation\n12 months\n8\nExtension of bay at 220 KV Substation\n6 months\n(d) If the connection under sub-clause 3(a) requires completion of any projects approved by the Commission as part of the investment plan of the Licensee, the Licensee shall complete such projects within the time frame approved by the Commission and release connection.\n(a) In case where supply of electricity to premises applied requires commissioning of a new substation along with extension of electric line, the Licensee shall inspect the premises of the applicant and prepare the cost estimate for the works and intimate the applicant within 2 months of receipt of application.\n(b) The Licensee may require the applicant to deposit the amount within a period of one month or such extended period as the Licensee may allow at the request of the applicant.\n(c) After receipt of required amount from the applicant, the Licensee shall complete the works under sub-clause 4(a) and release the connection within the time frame given under clause 8(3) or 8(4) which ever is higher.\n(d) If the connection under sub-clause 4(a) requires completion of any projects approved by the Commission as part of the investment plan of the Licensee, the Licensee shall complete such projects within the time frame approved by the Commission and release connection.",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "9",
"title": "9. Withdrawal of application.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "10",
"title": "10. Delay on the part of applicant to take supply.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "11",
"title": "11. Priority for release of connection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "12",
"title": "12. Dues of previous consumer.",
"chapter": null,
"content": "Chapter IV\nSecurity Deposits",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "13",
"title": "13. Security for supply of electricity and meter.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "14",
"title": "14. Initial Security Deposit.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "15",
"title": "15. Security for the electric line or electrical plant.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "16",
"title": "16. Interest on Security Deposits.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "17",
"title": "17. Refund of Security Deposit.",
"chapter": null,
"content": "Chapter V\nRecovery Of Electricity Charges",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "18",
"title": "18. Recovery of charges for supply.",
"chapter": null,
"content": "(a) Charges for electricity supplied based on the approved tariff in force\n(b) Wheeling charges, surcharges, additional surcharges applicable as approved by the Commission\n(c) any miscellaneous charges applicable as approved by the Commission\n(d) any tax or duty as notified by the Government",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "19",
"title": "19. Meter reading.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "20",
"title": "20. Reading of meter on request.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "21",
"title": "21. Contents of bill.",
"chapter": null,
"content": "(a) Bill date, Name and address of issuing Office of the Licensee.\n(b) Name of Consumer, Address, Consumer No.\n(c) Period Covered by the bill;\n(d) Type of service and the relevant tariff applicable to the consumer;\n(e) The dates and values of current and previous meter readings or estimates. (If applicable);\n(f) Energy consumption, Other billing parameters applicable, if any, such as contract demand / connected load, power factor, etc;\n(g) Applicable charges: fixed (minimum charges)/ energy/ taxes/ rebate/ adjustments/interest/arrears;\n(h) The amount of arrears or credits outstanding to the consumers account;\n(i) Net amount payable;\n(j) Due date of payment;\n(k) Summary of payment methods;\n(l) Date of disconnection if payment is not made;\n(m) Contact telephone number of Consumer Service Center of the Licensee for seeking clarification;\n(n) Designation and address of authorities of the Licensee with whom complaints/grievances of the consumer to be lodged;\n(o) Contact details of Consumer Grievance Redressal Forum and Ombudsman constituted under Section 42 of the Act.",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "22",
"title": "22. Payment of electricity bill.",
"chapter": null,
"content": "(a) Interest on electricity duty arrears\n(b) Electricity duty arrears\n(c) Interest on electricity charge arrears\n(d) Electricity charge arrears\n(e) Current month dues",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "23",
"title": "23. Interest charges for belated payment.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "24",
"title": "24. Disputes in bill.",
"chapter": null,
"content": "(a) shall specify the amount to be recovered as a separate item in the consumer's next bill with details or as a separate bill with details for the amount.\n(b) shall not charge interest on the amount under charged\n(c) may allow instalment option\nChapter VI\nDisconnection",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "25",
"title": "25. Disconnection of supply of electricity by Licensee.",
"chapter": null,
"content": "(a) At the request of the consumer.\n(b) The Licensee is mandated to do so by a person with legal authority to issue such mandate.\n(c) The Licensee is entitled to do so under an agreement with the consumer.\n(d) The Licensee reasonably believes that the consumer has contravened the provisions of the Code/Act, which entitle the Licensee to disconnect the supply.\n(e) Licensee reasonably believes that the failure to disconnect may or is likely to cause health hazard or safety risk or damage to property or to the consumer or to any other person.\n(f) The Licensee reasonably believes that the consumer's installation does not comply with the applicable rules or any other reasonable requirements prescribed by the Licensee.\n(g) In the case of non-payment of dues on electricity charges.\n(h) The security provided by the consumer has become insufficient or the consumer fails to provide additional security as required by the Licensee.\n(i) The Licensee reasonably believes that the consumer is found to have tampered or damaged electrical plant or meter of the Licensee\n(a) an amount equal to the sum claimed from him or\n(b) calculated based on the average of past six months whichever is less, pending disposal of any dispute between him and the Licensee.\nChapter VII\nReconnection Of Supply",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "26",
"title": "26. Action for reconnection.",
"chapter": null,
"content": "Chapter VIII\nTampering, Distress Or Damage To Electrical Plant",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "27",
"title": "27. Action against tampering, distress or damage to electrical plant, electric lines or meter.",
"chapter": null,
"content": "Chapter IX\nEntry of Licensee to Consumer Premises",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "28",
"title": "28. Entry of the Licensee to premises.",
"chapter": null,
"content": "(a) Taking meter reading, inspecting, testing, repairing or altering the electric supply lines, meters, works and apparatus for the supply of electricity belonging to the Licensee; or\n(b) Removing where a supply of electricity is no longer required, or where the Licensee is authorised to take away and cut off such supply, any electric supply lines meters, fittings, works or apparatus belonging to the Licensee.\n(c) A Licensee or any other person authorised as aforesaid may also, in pursuance of a special order in this behalf made by an Executive Magistrate and after giving not less than 24 hours notice in writing to the occupier, enter any premises or land referred to above for any of the purposes mentioned therein.\nChapter X\nMiscellaneous",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "29",
"title": "29. Notice to the consumer.",
"chapter": null,
"content": "(a) through special messenger and obtaining signed acknowledgement or\n(b) by telegraphic message or\n(c) by fax or\n(d) by e-mail\n(a) state that the consumer has defaulted the payment by the due date\n(b) notify the consumer that failure to pay the amount due will entitle the Licensee to disconnect or restrict the supply of Services to the Premises;\n(c) outline the availability of payment options\n(d) outline the instalment option if applicable",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "30",
"title": "30. Terms and Conditions of supply.",
"chapter": null,
"content": "(a) Application form for supply of electricity\n(b) Estimate amount for giving WP /OH service connection\n(c) Estimate amount for giving service connection HT\n(d) Estimate amount for extension of line Single Phase/Three Phase. LT\n(e) Estimate amount for extension of line HT/EHT\n(f) Estimate amount for HT/EHT substation\n(g) Format of agreement for supply of electricity.\n(h) Format of installation completion report\n(i) Format of no-objection certificate\n(j) Initial Security deposit towards charges for power supply for different category of consumers (LT, HT and EHT)\n(k) Security deposit for meter/metering equipment for different category of consumers. (LT, HT and EHT)\n(l) Schedule of miscellaneous charges",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "31",
"title": "31. Power to remove difficulties.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 41
}
],
"metadata": {
"Act ID": "Last Updated 4th February, 2020 [ker205]",
"Act Number": "Published vide Notification No. 1/1/KERC-2005/IV, dated Thiruvananthapuram 02.03.2005",
"Enactment Date": "",
"Act Year": "2005",
"Short Title": "Kerala Electricity Supply Code, 2005",
"Type": "STATE",
"Location": "Kerala"
},
"updated_at": "2026-09-29 21:55:20"
}