Form 1
Form 1
(See rule 4)
Form of Acknowledgement
Form of Acknowledgement
Name of the Designated Officer and Office Address.
Name and address of the applicant.
Date of receiving application in the office of designated
Name of the service for which the application is given.
Particulars of the documents which are essential for receiving
Last date of the stipulated time limit.
Signature of Recipient
Name and Designation with seal
Note
Form 2
Form 2
(See rule 6)
Form of Notice Board
Form of Notice Board
Name, designation and Office of the designated officer
S. No.
Notified service
Documents to be annexed with the application
Stipulated time limit for the services
Designation and address of the first appellate
Stipulated time limit for the disposal of first
Designation and address of the second appellate
(1)
(2)
(3)
(4)
(5)
(6)
(7)
Name of the person authorized to receive application in the
Time limit for filing first appeal
Within thirty days from the decision of designated officer
Time limit for filing second appeal
Within sixty days from the decision of first appeal officer.
Form 3
Form 3
(See rule 16)
Form of Register to be Maintained in The Office of Designated Officer
Form of Register to be Maintained in The Office of Designated Officer
Name of the Office of the designated officer
Month
Month
Year
Year
S. No.
S. No.
Name and address of applicant
Name and address of applicant
Service for which the application is given
Service for which the application is given
Last date of the stipulated time limit
Last date of the stipulated time limit
Application allowed/disallowed
Application allowed/disallowed
Date and details of the order passed
Date and details of the order passed
(1)
(1)
(2)
(2)
(3)
(3)
(4)
(4)
(5)
(5)
(6)
(6)
Form 4
Form 4
(See rule 16)
Form of Register to be Maintained in The Office of First Appeallate Authoroity
Form of Register to be Maintained in The Office of First Appeallate Authoroity
Name of the Office of the First appellate officer
S. No.
Name and address of
Date of filing first
Designation of the
Last date of the
Date and detail of
(1)
(2)
(3)
(4)
(5)
(6)
Form 5
Form 5
(See rule 16)
(See rule 16)
Form of Register to be Maintained in The Office of Second Appellate Authority
Form of Register to be Maintained in The Office of Second Appellate Authority
Name of the Office of the Second Appellate Authority
S. No.
Name and address of appellant
Date of filing second appeal
Designation of the First Appeal Officer (Along
Details of disposal of second appeal
Date of recovery of penalty
Date of payment of amount of compensation
Follow up action regarding recommendations of
Details of order of revision
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
Form 6
Form 6
(See rule 17)
Form of Register to be Maintained in The Office of Revisional Authority
Form of Register to be Maintained in The Office of Revisional Authority
Name of the Office of the Revisional authority
S. No.
Name, designation and address of the Person in
Details of order against which the revision is
Details of proof of depositing penalty
Details of order of revision
Remarks
(1)
(2)
(3)
(4)
(5)
(6)
Services and Designated Officers/Appellate Authorities Notified
Services and Designated Officers/Appellate Authorities Notified
SRO-224, dated 21.07.2011, General Administration Department
SRO-224, dated 21.07.2011, General Administration Department
In exercise of the powers conferred by section 4 of the Jammu and Kashmir Public Services Guarantee Act, 2011 (Act No. IX of 2011), the Government hereby notify the following services and the designated officers/ appellate authorities as under:-
S. No.
S. No.
Name of the Service
Name of the Service
Designated Officer
Designated Officer
Stipulate time frame for providing service
Stipulate time frame for providing service
First Appellate Authority
First Appellate Authority
Second Appellate Authority
Second Appellate Authority
Consumer Affairs & Public Distribution
Consumer Affairs & Public Distribution
1.
Ration Card
Tehsil Supply Officer, CAPD in Rural areas and
30 days subject to condition that new ration
Deputy Director ,Food, CAPD concerned
Director,Food, CAPD concerned
2.
Issue of surrender certificate/duplicate Ration
Tehsil Supply Officer, CAPD in Rural areas and
07 days
Deputy Director,CAPD concerned
Director,CAPD concerned
3.
Inclusion of a new born child in the ration card
Tehsil Supply officer, CAPD in Rural areas and
07 days after production of birth certificate
Deputy Director,CAPD concerned
Director, CAPD concerned
4.
Transfer/Shifting from one FP Shop to another
Tehsil Supply officer, CAPD in Rural and
15 days subject to condition that the ration form
Deputy Director, CAPD concerned
Director, CAPD concerned
Power Development Department
Power Development Department
1.
Electricity Connection domestic with load 10KW.
Assistant Executive Engineer (Electrical)
30 days
Executive Engineer (Electrical) concerned
Superintending Engineer (Electrical) concerned
2.
Electricity Connection domestic with load 20 KW.
Executive Engineer (Electrical) concerned
35 Days
Superintending Engineer (Electrical) concerned
Chief Engineer (Electrical) concerned
3.
Electricity Connection domestic with load 30 KW
Superintending Engineer (Electrical) concerned
40 days
Chief Engineer (Electrical) concerned
Development Commissioner, Power
4.
Electricity Connection domestic with all loads
Chief Engineer (Electrical) concerned
45 days
Development Commissioner, power
Divisional Commissioner, concerned
5.
Electricity Connection commercial with load 5 KW.
Assistant Executive Engineer concerned
30 days
Executive Engineer, (Electrical) concerned
Super-intending Engineer (Electrical) concerned
6.
Electricity Connection commercial with load 20
Executive Engineer (Electrical) concerned
35 days
Superintending Engineer (Electrical) concerned
Chief Engineer (Electrical) concerned
7.
Electricity Connection commercial with load 30
Super- intending Engineer (Electrical) concerned
40 days
Chief Engineer (Electrical) concerned
Development Commissioner, Power
8.
Electricity Connection commercial with load 100
Chief Engineer (Electrical) concerned
45 days
Development Commissioner, Power
Divisional Commissioner concerned
9.
Electricity Connection industrial with load
Assistant Executive Engineer concerned
30 days
Executive Engineer (Electrical) concerned
Superintending Engineer (Electrical) concerned
10.
Electricity Connection industrial with load 30
Executive Engineer (Electrical) concerned
35 days
Superintending Engineer (Electrical) concerned
Chief Engineer (Electrical) concerned
11.
Electricity Connection industrial with load 100
Super- intending Engineer (Electrical) concerned
40 days
Chief Engineer (Electrical) concerned
Development Commissioner, Power
12.
Electricity Connection industrial with load 200
Chief Engineer (Electrical) concerned
45 days
Development Commissioner, Power
Divisional Commissioner concerned
Public Health Engineering, Irrigation and
Public Health Engineering, Irrigation and
1.
Sanction for domestic water connection
Executive Engineer,PHE concerned
15 days
Superintendent Engineer,PHE concerned
Deputy Commissioner concerned
2.
Actual, domestic water connection supply
Executive Engineer, PHE concerned
30 days
Superintendent Engineer, PHE concerned
Deputy Commissioner concerned
Revenue Department
Revenue Department
1.
State Subject Certificate (PRC)
Assistant Commissioner (Rev)/Additional Deputy
30 days
Deputy Commissioner concerned
Divisional Commissioner concerned
2.
Reserved Category Certificates
Tehsildar concerned
15 days
Additional Deputy Commissioner concerned
Deputy Commissioner concerned
3.
Dependent Certificate
Assistant Commissioner (Rev)/ Additional Deputy
30 days
Deputy Commissioner concerned
Divisional Commissioner concerned
4.
Extract of Fard Intikhab
Naib Tehsildar concerned
10 days
Assistant Commissioner (Revenue) concerned
Additional Deputy Commissioner concerned
5.
Extract of Girdawteri.
Naib Tehsildar concerned
10 days
Tehsildar concerned
Additional Deputy Commissioner concerned
6.
Extract of Aks Masavi/Laths
Naib Tehsildar concerned
10 days
Tehsildar concerned
Additional Deputy Commissioner concerned
7.
Extract of Jamabandi
Naib Tehsildar concerned
10 days
Assistant Commissioner (Revenue) concerned
Additional Deputy Commissioner concerned
8.
Attestation of mutations
Tehsildar concerned
30 days
Additional Deputy Commissioner concerned
Deputy Commissioner concerned
9.
Inheritance Mutation
Naib Tehsildar/Tehsildar concerned
30 days from the date of intimation/ application
Additional Deputy Commissioner concerned
Deputy Commissioner concerned
10.
Copy of mutation
Tehsildar concerned
10 days
Additional Deputy Commissioner concerned"
Deputy Commissioner concerned
11.
Demarcation of Land
Naib Tehsildar concerned
30 days
Tehsildar concerned
Additional deputy Commissioner concerned
12.
Extract of Tatima Shajra
Naib Tehsildar concerned
30 days
Assistant Commissioner (Revenue) concerned
Additional Deputy Commissioner concerned
13.
Extract of Chulah/Chowkidara
Naib Tehsildar concerned
10 days
Tehsildar concerned
Additional Deputy Commissioner concerned
14.
Income Certificate
Tehsildar concerned
30 days
Additional Deputy Commissioner concerned
Deputy Commissioner Concerned
Transport Department
Transport Department
1.
Learners driving license
Regional Transport Officer/Assistant Regional
15 days
Deputy Commissioner concerned
Transport Commissioner,J&K
2.
Driving License.
Regional Transport Officer/ Assistant Regional
30 days
Deputy Commissioner concerned
Transport Commissioner,J&K
3.
Registration of Vehicles
Regional Transport Officer/Assistant Regional
30 days
Deputy Commissioner concerned
Transport Commissioner,J&K
Housing & Urban Development Department
Housing & Urban Development Department
1.
Birth/Death Certificate
Registrar/Health Officer concerned
30 days
Joint Municipal Commissioner (Adm) concerned
Municipal Commissioner concerned
2.
NOC for construction of house from Srinagar
Secretary, Srinagar Development Authority
30 days
Vice Chairman, SDA
Divisional Commissioner concerned
3.
NOC for construction of house from,Jammu
Secretary, Srinagar Development Authority
30 days
Vice Chairman,JDA
Divisional Commissioner concerned
4.
NOC for construction of house from Town Planning
Chief Town Planner
30 days
Divisional Commissioner concerned
Administrative Secretary, H&UDD
5.
NOC for construction of house from Power
Executive Engineer concerned
30 days
Superintending Engineer concerned
Deputy Commissioner concerned
6.
NOC for construction of house from PHE.
Executive Engineer concerned
30 days
Superintending Engineer Concerned
Deputy Commissioner concerned
7.
NOC for construction of house from Nazool.
Tehsildar/Nazool concerned
30 days
Additional Deputy Commissioner concerned
Deputy Commissioner Concerned
8.
Building permission for construction of house
Joint Commissioner (Adm)/Planning
30 days
Municipal Commissioner Srinagar
Administrative Secretary, H&UD
9.
Building permission for construction of house
Joint Commissioner (Adm)/Planning
30 days
Municipal Commissioner Jammu
Administrative Secretary, H&UD Department
10.
Building permission for construction of house
Executive Officer concerned
30 days
Additional Deputy Commissioner Concerned
Deputy Commissioner Concerned
Notifications, Orders, Circulars, etc.
Notifications, Orders, Circulars, etc.
Power Connections Documents required therefor
S. No.
Notified Service
Documents to be annexed with the application
Loads
1
2
3
4
1.
Domestic Connection
Section 18 • Jammu and Kashmir Public Services Guarantee Rules, 2011
18. Interpretation
jammu-and-kashmir-public-services-guarantee-rules-2011-sec-18.json
•
Section 18
{
"act_title": "Jammu and Kashmir Public Services Guarantee Rules, 2011",
"act_slug": "jammu-and-kashmir-public-services-guarantee-rules-2011",
"section_label": "Section",
"section": {
"number": "18",
"title": "18. Interpretation",
"chapter": null,
"content": "Form 1\nForm 1\n(See rule 4)\nForm of Acknowledgement\nForm of Acknowledgement\nName of the Designated Officer and Office Address.\nName and address of the applicant.\nDate of receiving application in the office of designated\nName of the service for which the application is given.\nParticulars of the documents which are essential for receiving\nLast date of the stipulated time limit.\nSignature of Recipient\nName and Designation with seal\nNote\nForm 2\nForm 2\n(See rule 6)\nForm of Notice Board\nForm of Notice Board\nName, designation and Office of the designated officer\nS. No.\nNotified service\nDocuments to be annexed with the application\nStipulated time limit for the services\nDesignation and address of the first appellate\nStipulated time limit for the disposal of first\nDesignation and address of the second appellate\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\nName of the person authorized to receive application in the\nTime limit for filing first appeal\nWithin thirty days from the decision of designated officer\nTime limit for filing second appeal\nWithin sixty days from the decision of first appeal officer.\nForm 3\nForm 3\n(See rule 16)\nForm of Register to be Maintained in The Office of Designated Officer\nForm of Register to be Maintained in The Office of Designated Officer\nName of the Office of the designated officer\nMonth\nMonth\nYear\nYear\nS. No.\nS. No.\nName and address of applicant\nName and address of applicant\nService for which the application is given\nService for which the application is given\nLast date of the stipulated time limit\nLast date of the stipulated time limit\nApplication allowed/disallowed\nApplication allowed/disallowed\nDate and details of the order passed\nDate and details of the order passed\n(1)\n(1)\n(2)\n(2)\n(3)\n(3)\n(4)\n(4)\n(5)\n(5)\n(6)\n(6)\nForm 4\nForm 4\n(See rule 16)\nForm of Register to be Maintained in The Office of First Appeallate Authoroity\nForm of Register to be Maintained in The Office of First Appeallate Authoroity\nName of the Office of the First appellate officer\nS. No.\nName and address of\nDate of filing first\nDesignation of the\nLast date of the\nDate and detail of\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\nForm 5\nForm 5\n(See rule 16)\n(See rule 16)\nForm of Register to be Maintained in The Office of Second Appellate Authority\nForm of Register to be Maintained in The Office of Second Appellate Authority\nName of the Office of the Second Appellate Authority\nS. No.\nName and address of appellant\nDate of filing second appeal\nDesignation of the First Appeal Officer (Along\nDetails of disposal of second appeal\nDate of recovery of penalty\nDate of payment of amount of compensation\nFollow up action regarding recommendations of\nDetails of order of revision\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\n(7)\n(8)\n(9)\nForm 6\nForm 6\n(See rule 17)\nForm of Register to be Maintained in The Office of Revisional Authority\nForm of Register to be Maintained in The Office of Revisional Authority\nName of the Office of the Revisional authority\nS. No.\nName, designation and address of the Person in\nDetails of order against which the revision is\nDetails of proof of depositing penalty\nDetails of order of revision\nRemarks\n(1)\n(2)\n(3)\n(4)\n(5)\n(6)\nServices and Designated Officers/Appellate Authorities Notified\nServices and Designated Officers/Appellate Authorities Notified\nSRO-224, dated 21.07.2011, General Administration Department\nSRO-224, dated 21.07.2011, General Administration Department\nIn exercise of the powers conferred by section 4 of the Jammu and Kashmir Public Services Guarantee Act, 2011 (Act No. IX of 2011), the Government hereby notify the following services and the designated officers/ appellate authorities as under:-\nS. No.\nS. No.\nName of the Service\nName of the Service\nDesignated Officer\nDesignated Officer\nStipulate time frame for providing service\nStipulate time frame for providing service\nFirst Appellate Authority\nFirst Appellate Authority\nSecond Appellate Authority\nSecond Appellate Authority\nConsumer Affairs & Public Distribution\nConsumer Affairs & Public Distribution\n1.\nRation Card\nTehsil Supply Officer, CAPD in Rural areas and\n30 days subject to condition that new ration\nDeputy Director ,Food, CAPD concerned\nDirector,Food, CAPD concerned\n2.\nIssue of surrender certificate/duplicate Ration\nTehsil Supply Officer, CAPD in Rural areas and\n07 days\nDeputy Director,CAPD concerned\nDirector,CAPD concerned\n3.\nInclusion of a new born child in the ration card\nTehsil Supply officer, CAPD in Rural areas and\n07 days after production of birth certificate\nDeputy Director,CAPD concerned\nDirector, CAPD concerned\n4.\nTransfer/Shifting from one FP Shop to another\nTehsil Supply officer, CAPD in Rural and\n15 days subject to condition that the ration form\nDeputy Director, CAPD concerned\nDirector, CAPD concerned\nPower Development Department\nPower Development Department\n1.\nElectricity Connection domestic with load 10KW.\nAssistant Executive Engineer (Electrical)\n30 days\nExecutive Engineer (Electrical) concerned\nSuperintending Engineer (Electrical) concerned\n2.\nElectricity Connection domestic with load 20 KW.\nExecutive Engineer (Electrical) concerned\n35 Days\nSuperintending Engineer (Electrical) concerned\nChief Engineer (Electrical) concerned\n3.\nElectricity Connection domestic with load 30 KW\nSuperintending Engineer (Electrical) concerned\n40 days\nChief Engineer (Electrical) concerned\nDevelopment Commissioner, Power\n4.\nElectricity Connection domestic with all loads\nChief Engineer (Electrical) concerned\n45 days\nDevelopment Commissioner, power\nDivisional Commissioner, concerned\n5.\nElectricity Connection commercial with load 5 KW.\nAssistant Executive Engineer concerned\n30 days\nExecutive Engineer, (Electrical) concerned\nSuper-intending Engineer (Electrical) concerned\n6.\nElectricity Connection commercial with load 20\nExecutive Engineer (Electrical) concerned\n35 days\nSuperintending Engineer (Electrical) concerned\nChief Engineer (Electrical) concerned\n7.\nElectricity Connection commercial with load 30\nSuper- intending Engineer (Electrical) concerned\n40 days\nChief Engineer (Electrical) concerned\nDevelopment Commissioner, Power\n8.\nElectricity Connection commercial with load 100\nChief Engineer (Electrical) concerned\n45 days\nDevelopment Commissioner, Power\nDivisional Commissioner concerned\n9.\nElectricity Connection industrial with load\nAssistant Executive Engineer concerned\n30 days\nExecutive Engineer (Electrical) concerned\nSuperintending Engineer (Electrical) concerned\n10.\nElectricity Connection industrial with load 30\nExecutive Engineer (Electrical) concerned\n35 days\nSuperintending Engineer (Electrical) concerned\nChief Engineer (Electrical) concerned\n11.\nElectricity Connection industrial with load 100\nSuper- intending Engineer (Electrical) concerned\n40 days\nChief Engineer (Electrical) concerned\nDevelopment Commissioner, Power\n12.\nElectricity Connection industrial with load 200\nChief Engineer (Electrical) concerned\n45 days\nDevelopment Commissioner, Power\nDivisional Commissioner concerned\nPublic Health Engineering, Irrigation and\nPublic Health Engineering, Irrigation and\n1.\nSanction for domestic water connection\nExecutive Engineer,PHE concerned\n15 days\nSuperintendent Engineer,PHE concerned\nDeputy Commissioner concerned\n2.\nActual, domestic water connection supply\nExecutive Engineer, PHE concerned\n30 days\nSuperintendent Engineer, PHE concerned\nDeputy Commissioner concerned\nRevenue Department\nRevenue Department\n1.\nState Subject Certificate (PRC)\nAssistant Commissioner (Rev)/Additional Deputy\n30 days\nDeputy Commissioner concerned\nDivisional Commissioner concerned\n2.\nReserved Category Certificates\nTehsildar concerned\n15 days\nAdditional Deputy Commissioner concerned\nDeputy Commissioner concerned\n3.\nDependent Certificate\nAssistant Commissioner (Rev)/ Additional Deputy\n30 days\nDeputy Commissioner concerned\nDivisional Commissioner concerned\n4.\nExtract of Fard Intikhab\nNaib Tehsildar concerned\n10 days\nAssistant Commissioner (Revenue) concerned\nAdditional Deputy Commissioner concerned\n5.\nExtract of Girdawteri.\nNaib Tehsildar concerned\n10 days\nTehsildar concerned\nAdditional Deputy Commissioner concerned\n6.\nExtract of Aks Masavi/Laths\nNaib Tehsildar concerned\n10 days\nTehsildar concerned\nAdditional Deputy Commissioner concerned\n7.\nExtract of Jamabandi\nNaib Tehsildar concerned\n10 days\nAssistant Commissioner (Revenue) concerned\nAdditional Deputy Commissioner concerned\n8.\nAttestation of mutations\nTehsildar concerned\n30 days\nAdditional Deputy Commissioner concerned\nDeputy Commissioner concerned\n9.\nInheritance Mutation\nNaib Tehsildar/Tehsildar concerned\n30 days from the date of intimation/ application\nAdditional Deputy Commissioner concerned\nDeputy Commissioner concerned\n10.\nCopy of mutation\nTehsildar concerned\n10 days\nAdditional Deputy Commissioner concerned\"\nDeputy Commissioner concerned\n11.\nDemarcation of Land\nNaib Tehsildar concerned\n30 days\nTehsildar concerned\nAdditional deputy Commissioner concerned\n12.\nExtract of Tatima Shajra\nNaib Tehsildar concerned\n30 days\nAssistant Commissioner (Revenue) concerned\nAdditional Deputy Commissioner concerned\n13.\nExtract of Chulah/Chowkidara\nNaib Tehsildar concerned\n10 days\nTehsildar concerned\nAdditional Deputy Commissioner concerned\n14.\nIncome Certificate\nTehsildar concerned\n30 days\nAdditional Deputy Commissioner concerned\nDeputy Commissioner Concerned\nTransport Department\nTransport Department\n1.\nLearners driving license\nRegional Transport Officer/Assistant Regional\n15 days\nDeputy Commissioner concerned\nTransport Commissioner,J&K\n2.\nDriving License.\nRegional Transport Officer/ Assistant Regional\n30 days\nDeputy Commissioner concerned\nTransport Commissioner,J&K\n3.\nRegistration of Vehicles\nRegional Transport Officer/Assistant Regional\n30 days\nDeputy Commissioner concerned\nTransport Commissioner,J&K\nHousing & Urban Development Department\nHousing & Urban Development Department\n1.\nBirth/Death Certificate\nRegistrar/Health Officer concerned\n30 days\nJoint Municipal Commissioner (Adm) concerned\nMunicipal Commissioner concerned\n2.\nNOC for construction of house from Srinagar\nSecretary, Srinagar Development Authority\n30 days\nVice Chairman, SDA\nDivisional Commissioner concerned\n3.\nNOC for construction of house from,Jammu\nSecretary, Srinagar Development Authority\n30 days\nVice Chairman,JDA\nDivisional Commissioner concerned\n4.\nNOC for construction of house from Town Planning\nChief Town Planner\n30 days\nDivisional Commissioner concerned\nAdministrative Secretary, H&UDD\n5.\nNOC for construction of house from Power\nExecutive Engineer concerned\n30 days\nSuperintending Engineer concerned\nDeputy Commissioner concerned\n6.\nNOC for construction of house from PHE.\nExecutive Engineer concerned\n30 days\nSuperintending Engineer Concerned\nDeputy Commissioner concerned\n7.\nNOC for construction of house from Nazool.\nTehsildar/Nazool concerned\n30 days\nAdditional Deputy Commissioner concerned\nDeputy Commissioner Concerned\n8.\nBuilding permission for construction of house\nJoint Commissioner (Adm)/Planning\n30 days\nMunicipal Commissioner Srinagar\nAdministrative Secretary, H&UD\n9.\nBuilding permission for construction of house\nJoint Commissioner (Adm)/Planning\n30 days\nMunicipal Commissioner Jammu\nAdministrative Secretary, H&UD Department\n10.\nBuilding permission for construction of house\nExecutive Officer concerned\n30 days\nAdditional Deputy Commissioner Concerned\nDeputy Commissioner Concerned\nNotifications, Orders, Circulars, etc.\nNotifications, Orders, Circulars, etc.\nPower Connections Documents required therefor\nS. No.\nNotified Service\nDocuments to be annexed with the application\nLoads\n1\n2\n3\n4\n1.\nDomestic Connection",
"footnote": "",
"is_definition": true,
"sort_order": 17
},
"prev_section": "17",
"next_section": "1"
}