(a) by the actual amount of energy so supplied, or
(b) by the electrical quantity contained in the supply, or
(c) by such other method as may be approved by the State Government.
(a) the consumer's load factor, or
(b) the power factor of his load, or
(c) his total consumption of energy during any stated period, or
(d) the hours at which the supply of energy is required.]
Section 23 • The Indian Electricity Act, 1910
23. Charges for energy to be made without undue preference
indian-electricity-act-1910-sec-23.json
•
Section 23
{
"act_title": "The Indian Electricity Act, 1910",
"act_slug": "indian-electricity-act-1910",
"section_label": "Section",
"section": {
"number": "23",
"title": "23. Charges for energy to be made without undue preference",
"chapter": null,
"content": "(a) by the actual amount of energy so supplied, or\n(b) by the electrical quantity contained in the supply, or\n(c) by such other method as may be approved by the State Government.\n(a) the consumer's load factor, or\n(b) the power factor of his load, or\n(c) his total consumption of energy during any stated period, or\n(d) the hours at which the supply of energy is required.]",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
"prev_section": "22",
"next_section": "24"
}