69. Assessment of tax and imposition of penalty.

Table.
Table.
Sl.No.
Sl.No.
Type of contract
Type of contract
Labour charges at percentage of the value of
the contract.
Labour charges at percentage of the value of
the contract.
1
1
2
2
3
3
1
Fabrication and installation of plant and
machinery
25
2
Fabrication and creation of structural works of
iron and steel including fabrication, supply and errection of
iron trusses, purlines etc
15
3
Fabrication and installation of cranes and
joints
15
4
Fabrication land installation of elevators
(lifts) and escalators
15
5
Fabrication and installation of rolling shutters
and collapsible gates
15
6
Civil works like constructions of building,
bridges, roads/dams, barrages, canal and diversions
25
7
Installation of doors, door frames, windows
frames and grills
20
8
Supply and fixing of tiles, slabs, stones and
sheets
20
9
Supply and installation of air conditioning
equipments including deeps freezers, cold storage plant and
dee-humidore
15
10
Supply and installation of air conditioners and
air coolers
15
11
Supply and fitting of electrical goods, supply
and installation of electrical equipments including transformers
15
12
Supply and fixing of furniture's and fixtures,
partitions including contracts for interior decoration and false
ceiling
20
13
Construction of Railway coaches and wagons on
under carriages supplied by railway
20
14
Construction or mounting of bodies of motor
vehicles and constructions of trailers
20
15
Sanitary fitting for plumbing and drainages or
sewerage
25
16
Laying under ground or surface pipe lines,
cables or conductors
30
17
Dying and printing of textiles
30
18
Supply and erection of weighing machines and
weigh bridges
15
19
Painting polishing and white washing
30
20
All other contracts not specified from serial
No. 1 to 19 above:
25