(i) for contravention of any prohibited activities as referred to in clauses (ii), (iv), (v), (vii), (ix), (xi), (xvi) and (xvii) of section 3, an amount which shall be five time of the restoration cost;
(ii) for contravention of prohibited activities as referred to in clause (vi) of section 3, an amount @ five hundred rupees per cubic metre or part thereof per day in respect of excavated earth/debris and @ one thousand rupees per truck load or part thereof per day in respect of stacked material; rupees per truck load or part thereof per day in respect of stacked material;
(iii) for contravention of prohibited activities as referred to in clause (xii) of section 3, an amount at the rate of five hundred rupees per square meter per week till the time such act continues;
(iv) for contravention of the prohibited activities as referred to in clause (xiv) of section 3, an amount at the rate of one hundred rupees per running meter of the erection per day till the time the act continues; and
(v) for contravention of the prohibited activities as referred to in clause(xiii) or (xv) of section 3, an amount at the rate of six times the cost of removal.
Section 11 • Himachal Pradesh Road Infrastructure Protection Act, 2002
11. Levy of restoration cost and restoration fee.
himachal-pradesh-road-infrastructure-protection-act-2002-sec-11.json
•
Section 11
{
"act_title": "Himachal Pradesh Road Infrastructure Protection Act, 2002",
"act_slug": "himachal-pradesh-road-infrastructure-protection-act-2002",
"section_label": "Section",
"section": {
"number": "11",
"title": "11. Levy of restoration cost and restoration fee.",
"chapter": null,
"content": "(i) for contravention of any prohibited activities as referred to in clauses (ii), (iv), (v), (vii), (ix), (xi), (xvi) and (xvii) of section 3, an amount which shall be five time of the restoration cost;\n(ii) for contravention of prohibited activities as referred to in clause (vi) of section 3, an amount @ five hundred rupees per cubic metre or part thereof per day in respect of excavated earth/debris and @ one thousand rupees per truck load or part thereof per day in respect of stacked material; rupees per truck load or part thereof per day in respect of stacked material;\n(iii) for contravention of prohibited activities as referred to in clause (xii) of section 3, an amount at the rate of five hundred rupees per square meter per week till the time such act continues;\n(iv) for contravention of the prohibited activities as referred to in clause (xiv) of section 3, an amount at the rate of one hundred rupees per running meter of the erection per day till the time the act continues; and\n(v) for contravention of the prohibited activities as referred to in clause(xiii) or (xv) of section 3, an amount at the rate of six times the cost of removal.",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
"prev_section": "10",
"next_section": "12"
}