← Back to Directory

Haryana Urban Development Authority (Erection of Buildings) Regulations, 1979

Haryana Urban Development Authority (Erection of Buildings) Regulations, 1979

Raw JSON API

Sections

1. Title and Commencement.

Section 1

2. Definitions.

Section 2

1. National Council for Building Material (NBC) Ballabgarh

Section 1

2. Institute of Structural Engineers (India)

Section 2

3. Central Building Research Institute, Roorkee

Section 3

4. Various Engineering Institute like :

Section 4

3A. Preparation of zoning plans and passing of building plans.

Section 3A

4. Site Plan.

Section 4

5. Building Plan.

Section 5

6. Type Plans.

Section 6

7. Information necessary to validate application.

Section 7

9. Validity of sanctioned plan.

Section 9

10. Notice of commencement of work.

Section 10

11. Completion of building.

Section 11

11A. Intention to construct/physical possession/demarcation.

Section 11A

11B. Submission of building application.

Section 11B

11C. Checking of building plans and rectifying violations.

Section 11C

11D. Preparation of zoning plans and checking of building plans.

Section 11D

11E. Site plan.

Section 11E

11F. Building plans.

Section 11F

11H. Information necessary to validate application.

Section 11H

11J. Validity of plans.

Section 11J

11K. Completion of excavation.

Section 11K

11L. Submission of progress certificates.

Section 11L

11M. Completion drawings.

Section 11M

11N. Occupation certificate.

Section 11N

11O. General.

Section 11O

11P. Areas where self- certification procedure is applicable.

Section 11P

12. Use of site type and character of building.

Section 12

14. Architectural Control.

Section 14

15. Height of Mezzanine Storey and internal balconies.

Section 15

16. Minimum provision with regard to residential buildings.

Section 16

17. Minimum area of courtyard for purposes of ventilation.

Section 17

18. Minimum size and requirement of ventilation regarding a habitable room.

Section 18

19. Bath room and water closet.

Section 19

20. Height of boundary wall and fence and type of gate.

Section 20

23. Foundations.

Section 23

24. Damp proof course.

Section 24

26. Floors.

Section 26

27. Walls.

Section 27

29. Slenderness ratio.

Section 29

30. Hallow bricks and black walls.

Section 30

31. Roofs.

Section 31

32. Stair cases in residential buildings.

Section 32

33. Residential buildings with multiple dwelling units other than the above commercial public and industrial buildings.

Section 33

34. Minimum dimension of steps.

Section 34

35. Materials.

Section 35

36. Uniformity in treads and riser in stair cases.

Section 36

37. Location of staircases.

Section 37

38. Ventilation of staircases.

Section 38

39. Headroom in staircase.

Section 39

40. Provision of hand rails.

Section 40

41. Lobbies, Corridors, Passages and Balconies.

Section 41

42. Residential buildings with multiple dwelling and commercial, public and industrial building.

Section 42

43. Application.

Section 43

44. Materials.

Section 44

45. Design and construction.

Section 45

46. Floor beneath fire place.

Section 46

47. Jambs and backs of fire place.

Section 47

48. Flue size.

Section 48

49. Treatment of inside of chimney flues.

Section 49

50. Wood work in chimneys.

Section 50

51. Chimney stacks.

Section 51

52. Pipes for conveying smoke.

Section 52

53. Notice of or carrying out drainage work and application for permission.

Section 53

54. Work to be executed under the supervision of plumber.

Section 54

55. Adequacy of water Supply for the installation of Water borne sanitary installation.

Section 55

56. Sanitary fitting and execution of works to conform to P.W.D. specifications.

Section 56

57. All drainage system to be air smoke and water tight.

Section 57

58. No work of foul and waste water drainage to be kept separate.

Section 58

59. Junctions.

Section 59

60. Minimum sanitary facilities in various types of buildings.

Section 60

61. Water closet.

Section 61

62. Urinals.

Section 62

63. Lying of drains.

Section 63

64. Ventilation of drains.

Section 64

65. Manholes.

Section 65

66. Soil pipes and Ventilating pipes.

Section 66

67. Separation of soil pipes from rain-water pipes.

Section 67

68. Provision of trap.

Section 68

69. Waste Water Pipes.

Section 69

70. Over flow pipe.

Section 70

71. Pipes not to be exposed on external walls.

Section 71

72. Method of disposal.

Section 72

73. Septic tanks.

Section 73

74. Absorption pits.

Section 74

75. Sub-soil irrigation for disposal of effluent.

Section 75

76. Sanitary installations and drainage to be completed before applying for connection.

Section 76

77. Application for connection with Public Sewers.

Section 77

78. Sewer connection.

Section 78

79. Drainage of Roofs.

Section 79

80. Size of down pipes.

Section 80

81. Storm water not to drain.

Section 81

82. Inspection.

Section 82

83. Minor Alteration in case of Emergency.

Section 83

84. Carrying out of work.

Section 84

87. Registration of plumbers.

Section 87

89. Power of relaxation.

Section 89

1. Dead Loading.

Section 1

2. Superimposed Loading.

Section 2

3. Partition.

Section 3

4. Undertaking.

Section 4

1. Excavation.....................

Section 1

2. Damp proof course level...

Section 2

3. Roof level..............

Section 3

1. That we....................... the owner of the plot no............. sector, Urban Estate and................................the supervising Architect (C.A.No..............), have under stood the zoning sheet provisions provided by Haryana Urban Development Authority.

Section 1

2. That the building plans submitted to the Authority are in conformity to the Haryana Urban Development Authority (Erection of Buildings) Regulations ,1979, as amended from time to time and the zoning conditions applicable on the plot.

Section 2

3. We shall abide by the zoning sheet provisions and Haryana Urban Development Authority bye - laws during construction on the above said plot.

Section 3

4. That we shall be liable to face any action by Haryana Urban Development Authority if the construction is found to be in contravention to Haryana Urban Development Authority norms and bye-laws.

Section 4

1. That we,....................................the owner of plot no .................. sector............... Urban...............Estate..................and the supervising Architect....................... (C.A. No...................) have taken the proper possession/demarcation of plot at the site.

Section 1

2. That we are fully responsible for the correctness of the construction being done as per the Haryana Urban Development Authority (Erection of Buildings) Regulations ,1979, as amended from time to time and zoning sheet provisions applicable on the plot.

Section 2

3. Excavation work has been completed in accordance to HUDA bye- laws.

Section 3

1. That we the owner of plot no....................... sector........................... Urban Estate.....................the construction of which has reached Damp proof course Level under the supervision of Architect............................................ (C.A. No....................)

Section 1

2. The Damp proof course has been laid entirely as per provisions of the Haryana Urban Development Authority (Erection of Buildings) Regulations, 1979, as amended from time to time and zoning sheet provisions made available by Haryana Urban Development Authority.

Section 2

3. That we shall be liable to face any action by Haryana Urban Development Authority if the said construction is found to be in contravention to the norms/Byelaws.

Section 3

4. That further construction shall not be proceeded with for a period of fifteen days.

Section 4

1. That we,.................... the owner of the plot no............. sector, Urban Estate...............and the supervising Architect (C.A.No..............), certify that the building on the above said plot has been partially completed/ fully completed as per provisions of the Haryana Urban Development Authority (Erection of Buildings) Regulations ,1979, as amended from time to time and the zoning sheet provisions applicable on the plot.

Section 1

2. It is further certified that we shall be liable to face any action by Haryana Urban Development Authority if the above mentioned construction is found to be in contravention to the norms/bye-laws/ regulations of Haryana Urban Development Authority.

Section 2

3. It is further certified that there is no non-compoundable unauthorized construction and all compoundable items are with in the allowable Haryana Urban Development Authority compounding regulations.

Section 3