← Back to Directory
Haryana Industrial Promotion Rules, 2007
Haryana Industrial Promotion Rules, 2007
Sections
1. Short Title and Commencement.
Section 12. Definitions.
Section 23. Composition of High Powered Clearance Committee. Section 3.
Section 34. Meeting of High Powered Clearance Committee. Section 3.
Section 35. Composition of State Level Clearance Committee. Section 4.
Section 46. Meeting of State Level Clearance Committee. Section 4.
Section 47. Composition of District Level Clearance Committee. Section 5.
Section 58. Meeting of District Level Clearance Committee etc. Section 5.
Section 59. Composite Application Form. Sections 8 and 10.
Section 910. Processing and Monitoring of Composite Application Forms. Section.
Section 1011. Time Limits for Processing and Disposal of Composite Application Forms. Section 9.
Section 913. Appeal Section. Section 6.
Section 62. Sector road is the sector dividing road as indicated on the Development Plan.
Section 23. Where a piece of land falls in more than one category, the higher/highest rate shall apply.
Section 31. Name and Address of The Promoter/industrial Undertaking (Block Letters)
Section 12. Address for communication
Section 23. Constitution of the Firm/company :
Section 34. Location:
Section 45. Main items of manufacture/ activity.
Section 56. Cost of the Project (Rs. in lacs)
Section 67. Investment in Fixed assets (Rs. in 000)
Section 78. Power requirement
Section 89. Water requirement per day :
Section 910. Proposed Employment
Section 1011. Estimated Date of commencement of production
Section 111. Details of production and process
Section 12. Manufacturing Process_________________________________________
Section 23. Number of persons likely to work in unit___________________________
Section 34. Location
Section 45. Average Daily quantities of water to be consumed (in Kilo litre/daily): Proposed
Section 56. Waste Water discharge per day from: 6.1 Waste Water discharge per day from:
Section 67. Proposed Effluent Treatment Scheme
Section 79. Proposed Air Pollution control System
Section 910. Proposed method of handling and disposal of waste trapped by pollution arresting equipment/Hazardous Waste.
Section 101. A survey of the land on the scale 1 inch to 40 feet showing the existing means of access of the said land.
Section 12. Copy of the deed showing the title of land in favour of applicant.
Section 23. Copy of Small Scale Industry registration certificate.
Section 34. Copy of the project report.
Section 45. Copy of Fard Jamabandi, Aksh sajra, mutations etc.
Section 56. Copy of site plan and land utilization plan.
Section 67. Scrutiny fee of Rs.2/- per square meter.
Section 71. A flow chart of the manufacturing process supplemented by a brief description of the process in its various stages.
Section 12. Plans, in triplicate drawn to scale, showing:
Section 21. Name of the factory__________________________________________
Section 12. Name of the builder or contractor (s)_____________________________
Section 23. General type of construction____________________________________
Section 34. Purpose for which the building is to be used_______________________
Section 45. Name of room or building for which the certificate is granted giving reference to plan No._____________________________________________________
Section 56. Nature of work to be carried on in the above room/building.
Section 67. Nature and amount of moving power_____________________________
Section 78. Signature___________________________________________________
Section 89. Date_______________________________________________________
Section 91. That the applicant is a legal occupant/owner/landlord of the premises at................ in support of which the applicant has enclosed a proof of occupancy/ownership.
Section 12. That in case of tenant;
Section 23. That the applicant has requested the Uttar Haryana Bijli Vitran Nigam Limited/Dakshin Haryana Bijli Vitran Nigam Limited (hereinafter referred to as the "Supplier") to provide connection in the above mentioned premises in the applicant's name for the purpose mentioned in the application and agreement form.
Section 34. That the applicant hereby further agrees and undertakes as under :
Section 41. Copy of registration deed/Municipal or Panchayat Tax Assessment Notice/Allotment letter by Haryana Urban Development Authority/Haryana State Industrial Development Corporation/Lease Deed/Rent Receipt.
Section 12. Consent of landlord or indemnity Bond if consent of landlord not available in case of tenant seeking connection.
Section 23. General power of attorney in favour of signatory; in case of joint ownership and partnership firms; Certified true copy of the resolution, authorizing the signatory to deal with the Uttar Haryana Bijli Vitran Nigam/Dakshin Haryana Bijli Vitran Nigam, passed by the Board of Directors, in case of companies (as applicable).
Section 34. Self attested photocopy of the partnership deed in case of partnership firms/memorandum and article of association in case of companies, (as applicable).
Section 45. Copy of layout plan of the factory premises showing proposed location of meter & metering equipment i.e. meter and metering equipment should be located in a separate room at the main entrance of the factory premises having direct access from the main road.
Section 56. No objection certificate from Haryana Water and Air Pollution Board (if applicable)
Section 67. Attested copy of any one of documents listed at Serial Number 8 of page 1 of the form.
Section 71. That the applicant is a legal occupant/owner/landlord of the premises at............ in support of which the applicant has enclosed a proof of occupancy/ownership.
Section 12. That in case of tenant :-
Section 23. That the applicant has requested the Uttar Haryana Bijli Vitran Nigam Limited/Dakshin Haryana Bijli Vitran Nigam Limited UHBVAN/DHVN (hereinafter referred to as the "Supplier") to provide connection in the above mentioned premises in the applicant's name for the purpose mentioned in the application and agreement form.
Section 34. That the applicant hereby further agrees and undertakes as under:
Section 41. Copy of registration deed/Municipai or Panchayat Tax Assessment Notice/Allotment letter by Haryana Urban Development Authority/Haryana State Industrial Development Corporation/Lease Deed/Rent Receipt.
Section 12. Consent of landlord or Indemnity Bond if consent of landlord not available in case of tenant seeking connection.
Section 23. General power of attorney in favour of signatory; in case of joint ownership and partnership firms; Certified true copy of the resolution, authorizing the signatory to deal with the Uttar Haryana Bijli Vitran Nigam/Dakshin Haryana Bijli Vitran Nigam, passed by the Board of Directors, in case of companies (as applicable).
Section 34. Self attested photocopy of the partnership deed in case of partnership firms/memorandum and article of association in case of companies, (as applicable).
Section 45. Copy of layout plan of the factory premises showing proposed location of meter & metering equipment i.e. meter and metering equipment should be located in a separate room at the main entrance of the factory premises having direct access from the main road.
Section 56. No objection certificate from Haryana Water and Air Pollution Board (if applicable)
Section 67. Attested copy of any one of documents listed at Serial Number 8 of page 1 of the form.
Section 71. Name and Address of The Promoter/industrial Undertaking (Block Letters)
Section 12. Address for communication
Section 23. Constitution of the Firm/company :
Section 34. Location:
Section 45. Main items of manufacture/ activity.
Section 56. Cost of the Project (Rs. in lacs)
Section 67. Investment in Fixed assets (Rs. in 000)
Section 78. Power requirement
Section 89. Water requirement per day :
Section 910. Proposed Employment
Section 1011. Date of commencement of production
Section 111. Consent to/operate/renewal of consent under sections 25 and 26 of the Water (Prevention and Control of Pollution) Act, 1974 as amended.
Section 12. Consent to/operate/renewal of consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended.
Section 213. Authorization/renewal of authorization under rule 5 of the Hazardous Waste (Management and Handling) Rule, 1989, as amended in connection with my/our existing/proposes/altered/additional manufacturing/processing activities from the premises as per detail given below:-
Section 522. Details of stack
Section 221. Demand draft or receipt of deposit in an authorized bank towards consent fee/authorization.
Section 12. Undertaking or affidavit or statement from the annual report or certificate from the Chartered Accountant in support of gross fixed investments.
Section 23. Site plan/location map (in case No objection certificate was not obtained earlier).
Section 34. Declaration regarding the distance of unit from the bank of main river and in respect of stone crusher, hot mix plant for distance from highways and habitations.
Section 45. Layout plan showing location of stacks(chimney), effluent treatment plant, effluent disposal areas, Air Pollution Control Board devices, Hazardous Waste treatment and disposal areas.
Section 56. Manufacturing process flow sheet, with distractive note on the manufacturing process for such product.
Section 67. Copies of latest consent/authorization/environmental impact assessment clearance.
Section 78. Copy of small-scale industries registration certificate, if applicable.
Section 89. Copies of letter of indent/industrial licenses, clearance from the department of any other relevant document (please state)
Section 910. Copies of planning permission certificate issued by the Municipal Corporation/Directories of Urban Development or Town and Country Planning/Haryana Urban Development Authority.
Section 105. Permission to erect a building from Town and Country Planning Department/Haryana Urban Development Authority.
Section 56. Release of Electric connection
Section 61. Our firm/company is proposing to set up a project at_____________(complete address)______________________to manufacture/to provide services as mentioned below:
Section 12. We certify that the particulars furnished in the Common Application Form are true, and correct and complete to the best of our knowledge and undertake to adhere to the declarations made thereunder. The firm/Company shall be made liable for penal action as proposed under section 12 if the particulars furnished are found to be false/incorrect or incomplete and on our failure to adhere to the declarations made.
Section 123. The firm/company hereby undertake to abide by the conditions specified in each of the clearances and our failure to comply with the requirements/conditions of clearances shall result in withdrawal/cancellation of the clearances and further, shall make us liable for legal action as specified under the respective Acts/rules.
Section 34. The firm/company undertake to comply with all the provisions of applicable Acts/rules/regulations to our industry.
Section 45. Any losses to personal or public property caused due to wrong certification by the firm/company shall be liable to be borne by the firm/company.
Section 5
haryana-industrial-promotion-rules-2007.json
•
106 Sections
•
Haryana
{
"id": 16984,
"slug": "haryana-industrial-promotion-rules-2007",
"title": "Haryana Industrial Promotion Rules, 2007",
"short_title": "Haryana Industrial Promotion Rules, 2007",
"act_number": "Published vide Haryana Government Notification No.",
"act_year": 2007,
"act_type": "STATE",
"location": "Haryana",
"law_status": "unknown",
"enactment_date": null,
"description": "Haryana Industrial Promotion Rules, 2007",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short Title and Commencement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) \"Act\" means the Haryana Industrial Promotion Act, 2005 (6 of 2006).\n(b) \"Composite Application Forms\" means forms referred to in section 8 duly filled and completed in all respects;\n(c) \"Form\" means a form appended to these rules;\n(d) \"section\" means a section of the Act; and\n(e) \"undertaking\" means an undertaking given by an entrepreneur from time to time under section 10.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Composition of High Powered Clearance Committee. Section 3.",
"chapter": null,
"content": "(1)\nPrincipal Secretary to Chief Minister, Haryana\n:\nChairman\n(2)\nPrincipal Secretary to Government, Haryana\n:\nMember\nExcise and Taxation Department\n(3)\nPrincipal Secretary to Government, Haryana\n:\nMember\nPower Department\n(4)\nPrincipal Secretary to Government, Haryana\n:\nMember\nTown and Country Planning Department\n(5)\nPrincipal Secretary to Government, Haryana\n:\nMember\nIndustries Department\n(6)\nPrincipal Secretary to Government, Haryana\n:\nMember\nLabour Department\n(7)\nPrincipal Secretary to Government, Haryana\n:\nMember\nEnvironment Department\n(8)\nDirector of Industries, Haryana\n:\nMember Secretary",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "3",
"title": "4. Meeting of High Powered Clearance Committee. Section 3.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "4",
"title": "5. Composition of State Level Clearance Committee. Section 4.",
"chapter": null,
"content": "(1)\nPrincipal Secretary to Government, Haryana\n:\nChairman\nIndustries Department.\n(2)\nPrincipal Secretary to Government, Haryana\n:\nMember\nPower Department\n(3)\nPrincipal Secretary to Government, Haryana\n:\nMember\nExcise and Taxation Department\n(4)\nPrincipal Secretary to Government, Haryana\n:\nMember\nTown and Country Planning Department\n(5)\nPrincipal Secretary to Government, Haryana\n:\nMember\nLabour Department\n(6)\nPrincipal Secretary to Government, Haryana\n:\nMember\nEnvironment Department\n(7)\nDirector of Industries, Haryana\n:\nMember-Secretary",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "4",
"title": "6. Meeting of State Level Clearance Committee. Section 4.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "5",
"title": "7. Composition of District Level Clearance Committee. Section 5.",
"chapter": null,
"content": "(a)\nDeputy Commissioner of the District concerned\n:\nChairman\n(b)\nExecutive Engineer, Uttar Haryana Bijli Vitran\n\t\t\t\tNigam/Dakshin Haryana Bijli Vitran Nigam\n:\nMember\n(c)\nDeputy Excise and Taxation Commissioner\n:\nMember\n(d)\nDistrict Town Planner\n:\nMember\n(e)\nDistrict Level Officer of the Haryana State\n:\nMember\n(f)\nAssistant Director Industrial Safety c/o Labour\n\t\t\t\tCommissioner-cum-Chief Inspector of Factories\n:\nMember\n(g)\nGeneral Manager, District Industries Center\n:\nMember Secretary",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "5",
"title": "8. Meeting of District Level Clearance Committee etc. Section 5.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Composite Application Form. Sections 8 and 10.",
"chapter": null,
"content": "(2) Form-1 comprises of the following parts:\n(i) Common Sheet.\n(ii) Part A-Additional information required for obtaining change of land use certificate from Haryana Pollution Control Board.\n(iii) Part B-Additional information required for obtaining change of land use certificate from Town and Country Planning Department.\n(iv) Part C-Additional information required for approval of Factory/Building Plan under the Factories Act, 1948 (Act 63 of 1948).\n(v) Part D-Additional information required for approval of building plan from Town and Country Planning Department.\n(vi) Part E-Application and agreement form for release of electric connection from Dakshin Haryana Bijli Vitran Nigam/Uttar Haryana Bijli Vitran Nigam.\n(3) Form II comprises of the following parts:-\n(i) Part A-Additional information required for Consent from the Haryana Pollution Control Board under the Pollution Control Acts.\n(ii) Part B-License from Chief Inspector of Factories under the Factories Act, 1948 (Act 63 of 1948).\n(4) The Composite Application Form duly filled in shall be submitted in required member of copies alongwith relevant enclosures, certificate, fees receipts and attachments.\n(5) All applicant's shall furnish an undertaking as prescribed in Schedule-II alongwith Composite Application Forms as required under section 10.\n(6) The Nodal Agency shall issue the acknowledgement in Schedule-III.\n(7) There shall be a check list appended of Form-I and Form-II which shall be completed and signed by the applicant and scrutinized and accepted by the authorized representative of the nodal agency before issuing the acknowledgement.\n(8) Before issuing acknowledgement, the authorized representative of the nodal agency shall allot an Identity Number on the Composite Application Form and ensure that:\n(i) the application is complete in all respects;\n(ii) required number of copies of application have been submitted;\n(iii) all relevant and prescribed documents have been enclosed;\n(iv) the prescribed fees receipts have been enclosed;\n(v) undertaking has been furnished by the applicant;\n(vi) the check list has been filed correctly and signed by the applicant.",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Processing and Monitoring of Composite Application Forms. Section.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "9",
"title": "11. Time Limits for Processing and Disposal of Composite Application Forms. Section 9.",
"chapter": null,
"content": "[12. Notifying of clearance where the provision of deemed approval shall apply. Section 11.",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "6",
"title": "13. Appeal Section. Section 6.",
"chapter": null,
"content": "(i) to the High Powered Clearance Committee against the decision of the State Level Clearance Committee.\n(ii) to the Clearance Committee against the decision of the District Level Clearance Committee.\nSchedule I\nComposite Application Form (CAF)\nComposite Application Form (CAF)\nFor Obtaining Required Clearances from Authorities Concerned\nFor Obtaining Required Clearances from Authorities Concerned\n[ See rule 9(1)]\nID NO. _______________\n(to be allotted by Investment Promotion Centre/District Industries Centre)\nInstructions to fill up Composite Application Form\nForm I (for establishment)\n(i) Common Sheet\n(ii) Part A-Additional information required for obtaining no objection certificate from the Haryana Pollution Control Board.\n(iii) Part B-Additional information required for obtaining change of land use certificate from Town and Country Planning Department.\n(iv) Part C-Additional information required for approval of Factory/Building Plan under the Factories Act, 1948 (Act 63 of 1948).\n(v) Part D-Additional information required for approval of building plan from Town and Country Planning Department\n(vi) Part E-Application and agreement form for release of electric connection from Dakshin Haryana Bijli Vitran Nigam/Uttar Haryana Bijli Vitran Nigam.\nForm II (for operation)\n(i) Common Sheet.\n(ii) Part A-Additional information required for consent from Haryana Pollution Control Board under Pollution Control Acts.\n(iii) Part B-Licence from Chief Inspector of Factories under the Factories Act, 1948 (Act 63 of 1948).\nRequired clearances and authorities concerned\nRequired clearances and authorities concerned\nFees\nFees\nNo Objection Certificate/Consent fee from\n\t\t\t\tHaryana Pollution Control Board under Pollution Control Acts.\nAs per Annexure A\nChange of Land Use from Town and Country\n\t\t\t\tPlanning Department\nChange of Land Use charges as per Annexure B\n\t\t\t\tplus scrutiny charges @ Rs.2/- per square meter\nApproval of building plans from Town and Country\n\t\t\t\tPlanning Department\nRs. 10/- per square meter of the covered area\nLicence from Chief Inspector of Factories under\n\t\t\t\tthe Factories Act, 1948 (Act 63 of 1948).\nAs per Annexure C\nUttar Haryana Bijli Vitran Nigam/Dakshin Haryana\n\t\t\t\tBijli Vitran Nigam\nAs per Annexure D\nAnnexure-A\nAnnexure-A\nNOC/Consent Fees under Water Act and Air Act\nNOC/Consent Fees under Water Act and Air Act\n[ See rule 9 (I)]\nNOC\nNOC\n19 Category\n19 Category\n17 Category\n17 Category\nS.No.\nS.No.\nConsent Fees\nConsent Fees\nNOC A-I\nNOC A-I\nNOC Highly Polluting A-II\nNOC Highly Polluting A-II\n1st year Consent B-I(i)\n1st year Consent B-I(i)\nSubsequent year B-I(ii)\nSubsequent year B-I(ii)\nHighly Polluting 1st year B-II\nHighly Polluting 1st year B-II\n(i) Highly Polluting Subsequent year B-II(ii)\n(i) Highly Polluting Subsequent year B-II(ii)\n(a)\nIndustries having capital investment exceeding\n\t\t\t\tRs. 100 Cr.\n35,000\n1,05,000\n50,000\n25,000\n1,50,000\n75,000\n(b)\nIndustries having capital investment exceeding\n\t\t\t\tRs. 50 crores but not exceeding Rs. 100 crores\n20,000\n60,000\n40,000\n20,000\n1,20,000\n60,000\n(c)\nIndustries having capital investment exceeding\n\t\t\t\tRs. 10 crores but not exceeding Rs. 50 crores\n12,000\n36,000\n30,000\n15,000\n90,000\n45,000\n(d)\nIndustries having capital investment exceeding\n\t\t\t\tRs. 3 crores but not exceeding Rs. 10 crores\n8,000\n24,000\n20,000\n8,000\n60,000\n24,000\n(e)\nIndustries having capital investment exceeding\n\t\t\t\tRs. 1 crore but not exceeding Rs. 3 crores\n5,700\n17,700\n10,000\n3,700\n30,000\n11,000\n(f)\nIndustries having capital investment exceeding\n\t\t\t\tRs. 0.50 crore but not exceeding Rs. 1 crore\n4,500\n14,500\n5,000\n1,500\n15,000\n4,500\n(g)\nIndustries having capital investment exceeding\n\t\t\t\tRs. 0.25 crore but not exceeding Rs. 0.50 crore\n2,500\n7,500\n2,000\n1,000\n6,000\n3,000\n(h)\nIndustries having capital investment exceeding\n\t\t\t\tRs. 0.10 crore but not exceeding Rs. 0.25 crore\n1,500\n4,500\n500\n500\n1,500\n1,500\n(i)\nIndustries having capital investment exceeding\n\t\t\t\tRs. 0.02 crore but not exceeding Rs. 0.10 Cr\n750\n2,250\n200\n500 Water Act 200 Air Act\n600\n600\n(j)\nIndustries having capital investment upto Rs.\n\t\t\t\t0.02 crore\n200\n600\n100\n200 Water Act 100 Air Act\n300\n300\nAnnexure-B\nAnnexure-B\nRates of Conversion Charges in the Controlled Areas in the State\nRates of Conversion Charges in the Controlled Areas in the State\n(rates rupees per square meter)\n(rates rupees per square meter)\n[ See rule 9 (I)]\nPotential Zone\nPotential Zone\nHyper Potential\nHyper Potential\nHigh Potential\nHigh Potential\nMedium Potential\nMedium Potential\nLow Potential\nLow Potential\nName of controlled area\nControlled areas declared under section 4(1)(a)\n\t\t\t\tPunjab Scheduled Roads and Control Areas Restriction of\n\t\t\t\tUnregulated Development Act, 1963 (Punjab Act 41 of 1963) around\n\t\t\t\tMunicipal Town, Gurgaon\nControlled areas declared under section 4(1)(b)\n\t\t\t\tPunjab Scheduled Roads and Control Areas Restriction of\n\t\t\t\tUnregulated Development Act, 1963 (Punjab Act 41 of 1963) in\n\t\t\t\tGurgaon district including controlled Areas around Sohna town, \n\t\t\t\tcontrolled areas of Faridabad, Ballabgarh Complex, controlled\n\t\t\t\tareas of Sonipat-Kundli multifunctional urban complex Panipat and\n\t\t\t\tperiphery controlled area of Panchkula.\nControlled areas around towns i.e. Karnal, \n\t\t\t\tKurukshetra, Ambala City, Ambala Cantt. Yamuna Nagar, \n\t\t\t\tJagadhri, Bahadurgarh, Hisar, Rohtak, Rewari, \n\t\t\t\tBawal,Dharuhera Complex,Ganaur, Palwal, Hodel, controlled\n\t\t\t\tareas declared under section 4(1)(b) Punjab Scheduled Roads and\n\t\t\t\tControl Areas Restriction of Unregulated Development Act, 1963\n\t\t\t\t(Punjab Act 41 of 1963) in Faridabad District, Oil refinery, \n\t\t\t\tPanipat (Beholi)\nAll other controlled areas declared in the State\nAbutting on\nAbutting on\nAbutting on\nAbutting on\nUse\nUse\nNH\nNH\nSR/Sector Road\nSR/Sector Road\nOther Road\nOther Road\nNH\nNH\nSR/Sector Road\nSR/Sector Road\nOther Road\nOther Road\nNH\nNH\nSR/Sector Road\nSR/Sector Road\nOther Road\nOther Road\nNH\nNH\nSR/Sector Road\nSR/Sector Road\nOther Road\nOther Road\nResidential\n200\n150\n100\n50\n120\n100\n100\n80\n60\n30\n20\n15\nCommercial\n1400\n1200\n1000\n200\n1000\n400\n700\n600\n350\n200\n150\n100\nIndustrial\n20\n20\n20\n2\n12\n12\n6\n6\n6\n3\n3\n3\nInstiutional\n150\n120\n100\n00\n80\n60\n60\n40\n30\n20\n15\n10\nRecreational\n20\n20\n20\n2\n12\n12\n6\n6\n6\n3\n3\n3\nNote:- 1. Abbreviation used indicate NH: National Highway; SR.: Scheduled Road.",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "2",
"title": "2. Sector road is the sector dividing road as indicated on the Development Plan.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "3",
"title": "3. Where a piece of land falls in more than one category, the higher/highest rate shall apply.",
"chapter": null,
"content": "Annexure-C\nAnnexure-C\nLicense fee per Year under Factories Act, 1948\nLicense fee per Year under Factories Act, 1948\n[ See rule 9 (1)]\nMaximum number of workers to be employed on\n\t\t\t\tany day during the year\nMaximum number of workers to be employed on\n\t\t\t\tany day during the year\nUpto 20\nUpto 20\nFrom 21 to 50\nFrom 21 to 50\nFrom 51 to 100\nFrom 51 to 100\nFrom 101 to 250\nFrom 101 to 250\nFrom 251 to 500\nFrom 251 to 500\nFrom 501 to 750\nFrom 501 to 750\nFrom 751 to\nFrom 751 to\nAbove 1000\nAbove 1000\nWithout Horse Power\nRs. 200\nRs. 400\nRs. 600\nRs. 800\nRs. 1000\nRs. 2000\nRs. 3000\nRs. 4000\nNot exceeding 10\n400\n600\n800\n1000\n2000\n3000\n4000\n5000\nExceeding 10 but 50\n600\n800\n1000\n2000\n3000\n4000\n5000\n6000\nExceeding 50 but 100\n800\n1000\n2000\n3000\n4000\n5000\n6000\n8000\nExceeding 100 but 250\n1000\n1500\n2500\n4000\n5000\n6000\n8000\n10000\nExceeding 250 but 500\n1500\n2000\n3000\n5000\n6000\n8000\n10000\n12000\nExceeding 500 but 1000\n2000\n3000\n4000\n6000\n8000\n10000\n12000\n14000\nExceeding 1000\n3000\n4000\n6000\n8000\n10000\n12000\n14000\n16000\nUttar Haryana Bijli Vitran Nigam Ltd./Dakshin Haryana Bijli Vitran Nigam Ltd.\nUttar Haryana Bijli Vitran Nigam Ltd./Dakshin Haryana Bijli Vitran Nigam Ltd.\n[ See rule 9 (I)]\nDescription\nDescription\nFees\nFees\n(i)\nApplication for Processing charges\n(i)\nRs. 25/- per Kilo Watt or part thereof subject\n\t\t\t\tto maximum of Rs. 10000/-\n(ii)\nAdvance Consumption deposit\n(a)\nLT industrial supply\nRs.500/- per Kilo Watt or part thereof of the\n\t\t\t\tconnected load.\n(b)\nHT Industrial supply\nRs.500/- per Kilo Watt or part thereof of the\n\t\t\t\tconnected load\n(iii)\nMeter Security Charges (if applicable)\n(a)\nSingle phase Meter\nRs.600/-\n(b)\nThree phase\nRs.1000/-\n(c)\nLT Three Phase meter with CTs\nRs.7500/-\n(d)\nHT meter without trivector meter with CTs/PT\nRs.25000/-\n(e)\nLT Conventional trivector meter with CTs/PT\nRs.25000/-\n(f)\nHT Conventional trivector meter with CTs/PT\nRs.35000/-\n(g)\nHT electronic meter with CTs/PT\nRs.40000/-\n(iv)\nMeter Inspection and Testing Charges (if\n\t\t\t\tapplicable)\n(a)\nSingle phase\nRs.25/- per meter\n(b)\n3 Phase whole current i.e. without C.T.\nRs.50/- per meter\n(c)\nL.T. meter with CTs\nRs.250/- per meter\n(d)\nH.T.& E.H. metering equipment\nRs.500/- per meter\n(v)\nService Connection Charges\n(a)\nSingle phase NDS\nRs.350/- per Kilo Watt\n(b)\nThree phase NDS\nRs.750/- per Kilo Watt\n(c)\nBulk supply and L.T. Industrial Supply\nRs.500/- per Kilo Watt\n(d)\nH.T Industrial Supply\nRs.750/- per KVA of contract demand\nForm-I\nForm-I\n[ See rule 9(1)]\nI.D. No._______________\nCommon Sheet\nCommon Sheet\n[ See rule 9(2) (i)]",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "1",
"title": "1. Name and Address of The Promoter/industrial\n\t\t\t\tUndertaking (Block Letters)",
"chapter": null,
"content": "Name of the Industrial undertaking\nName of the\n\t\t\t\tpromoter/Managing Director/Managing Partner with surname first",
"footnote": "",
"is_definition": false,
"sort_order": 14
},
{
"number": "2",
"title": "2. Address for\n\t\t\t\tcommunication",
"chapter": null,
"content": "Tel:\nPin Code\nFax:\nE-mail",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
{
"number": "3",
"title": "3. Constitution of\n\t\t\t\tthe Firm/company :",
"chapter": null,
"content": "Proprietorship/Partnership/Pvt.\n\t\t\t\tLtd./Public Ltd./others if any",
"footnote": "",
"is_definition": false,
"sort_order": 16
},
{
"number": "4",
"title": "4. Location:",
"chapter": null,
"content": "Place/Town\nTehsil/Taluk\nDistrict :\nState :",
"footnote": "",
"is_definition": false,
"sort_order": 17
},
{
"number": "5",
"title": "5. Main items of\n\t\t\t\tmanufacture/ activity.",
"chapter": null,
"content": "S.No\nS.No\nProducts/Services\nProducts/Services\nInstalled capacity (per annum)\nInstalled capacity (per annum)\n1.\n2.\n3.\n4.\n5.",
"footnote": "",
"is_definition": false,
"sort_order": 18
},
{
"number": "6",
"title": "6. Cost of the\n\t\t\t\tProject (Rs. in lacs)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 19
},
{
"number": "7",
"title": "7. Investment in\n\t\t\t\tFixed assets (Rs. in 000)",
"chapter": null,
"content": "(i) Land\n(ii) Building\n(iii) Plant and Machinery\n(iv) Other fixed assets\nTotal",
"footnote": "",
"is_definition": false,
"sort_order": 20
},
{
"number": "8",
"title": "8. Power requirement",
"chapter": null,
"content": "Kilo Watt",
"footnote": "",
"is_definition": false,
"sort_order": 21
},
{
"number": "9",
"title": "9. Water requirement\n\t\t\t\tper day :",
"chapter": null,
"content": "Kilo Litres\n(i) For process and Wash\n(ii) For Cooling\n(iii) Sanitary\n(iv) Total",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
{
"number": "10",
"title": "10. Proposed\n\t\t\t\tEmployment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 23
},
{
"number": "11",
"title": "11. Estimated Date of\n\t\t\t\tcommencement of production",
"chapter": null,
"content": "Part-A\nPart-A\n[ See rule 9(2)(ii)]\nAdditional Information Required for Obtaining No Objection Certificate (N.O.C.) From Haryana State Pollution Control Board\nAdditional Information Required for Obtaining No Objection Certificate (N.O.C.) From Haryana State Pollution Control Board",
"footnote": "",
"is_definition": false,
"sort_order": 24
},
{
"number": "1",
"title": "1. Details of production and process",
"chapter": null,
"content": "1.1 (i) List the main products which are proposed to be produced\n(ii) Designed daily capacity\n(a) ___________________________________________________________\n(b)___________________________________________________________\n(c)___________________________________________________________\n1.2 List all Raw Materials with the daily consumption at full production capacity\n(a) ___________________________________________________________\n(b)___________________________________________________________\n(c)___________________________________________________________",
"footnote": "",
"is_definition": false,
"sort_order": 25
},
{
"number": "2",
"title": "2. Manufacturing Process_________________________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 26
},
{
"number": "3",
"title": "3. Number of persons likely to work in unit___________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 27
},
{
"number": "4",
"title": "4. Location",
"chapter": null,
"content": "4.1 Where it is proposed to locate the unit (Industrial Area or otherwise)______\n4.2 If the site is situated in notified industrial estate :\n(a)\nWhether effluent collection, treatment and\n\t\t\t\tdisposal system has been provided by the authority;\nYes/No\n(b)\nWill the applicant utilize the system, if\n\t\t\t\tprovided;\nYes/No\n(c)\nIf not provided, details of proposed\n\t\t\t\tarrangement for the treatment of effluent\nYes/No\n4.3 If not located in Industrial Area then give identification of nearest Residential Area (Such as Village, Town etc.)\n4.4 Total plot Area, Built up area and area available for the use of treated sewage/trade effluent.________________________________________________\n4.5 Area proposed to be developed._________________________________\n4.6 If the site is located near river bank/other water bodies; indicate the name and distance of water body____________________\n4.7 Does the location satisfy the requirements\n\t\t\t\tunder Relevant Central/State Government notifications\nYes/No\n4.8 Month and Year of proposed commissioning of\n\t\t\t\tthe unit.\nMonth___________\nYear ____________",
"footnote": "",
"is_definition": false,
"sort_order": 28
},
{
"number": "5",
"title": "5. Average Daily quantities of water to be consumed (in Kilo litre/daily): Proposed",
"chapter": null,
"content": "(i) Process and wash ____________________________________________\n(ii) Cooling____________________________________________________\n(iii) Sanitation/Domestic/Horticulture_______________________________\n(iv) Total______________________________________________________",
"footnote": "",
"is_definition": false,
"sort_order": 29
},
{
"number": "6",
"title": "6. Waste Water discharge per day from: 6.1 Waste Water discharge per day from:",
"chapter": null,
"content": "(i) For process and Wash\n(ii) Cooling\n(iii) Sanitary\n(iv) Total",
"footnote": "",
"is_definition": false,
"sort_order": 30
},
{
"number": "7",
"title": "7. Proposed Effluent Treatment Scheme",
"chapter": null,
"content": "Stack/source of emission :\n1\n2\n3\n4\n(i) Total Number\n(ii) Source\n(iii) Height in m. above G.L.\n(iv) Height in m. above top of building\n(v) Internal Diameter in mm.",
"footnote": "",
"is_definition": false,
"sort_order": 31
},
{
"number": "9",
"title": "9. Proposed Air Pollution control System",
"chapter": null,
"content": "Give information on type and add detailed specifications\nCollectors\nCollectors\nPrecipitators\nPrecipitators\nScrubbers\nScrubbers\n(1)\n(2)\n(3)\n(4)",
"footnote": "",
"is_definition": false,
"sort_order": 32
},
{
"number": "10",
"title": "10. Proposed method of handling and disposal of\n\t\t\t\twaste trapped by pollution arresting equipment/Hazardous Waste.",
"chapter": null,
"content": "Landfill\nDumping\nIncinerators\nADD separate sheets wherever necessary\nPlace______________________\n\t\t\t\tSignature______________________\nDate______________________\n\t\t\t\tName__________________________\nDesgination_______________________________________________\nAddress__________________________________________________\n* Annexures to be attached as per Check List\nSignature of applicant (Authorised Person)\nPart-B\nPart-B\n[ See rule 9(2) (iii)]\nI.D.No.___________________\nAdditional Information Required for Obtaining Change of Land use (C.L.U.) From Town and Country Planning Department\nAdditional Information Required for Obtaining Change of Land use (C.L.U.) From Town and Country Planning Department",
"footnote": "",
"is_definition": false,
"sort_order": 33
},
{
"number": "1",
"title": "1. A survey of the land on the scale 1 inch to 40 feet showing the existing means of access of the said land.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 34
},
{
"number": "2",
"title": "2. Copy of the deed showing the title of land in favour of applicant.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 35
},
{
"number": "3",
"title": "3. Copy of Small Scale Industry registration certificate.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 36
},
{
"number": "4",
"title": "4. Copy of the project report.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 37
},
{
"number": "5",
"title": "5. Copy of Fard Jamabandi, Aksh sajra, mutations etc.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 38
},
{
"number": "6",
"title": "6. Copy of site plan and land utilization plan.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 39
},
{
"number": "7",
"title": "7. Scrutiny fee of Rs.2/- per square meter.",
"chapter": null,
"content": "Yours faithfully,\nName and full address\nPart-C\nPart-C\n[ See rule 9(2)(iv)]\nI.D. No.______________\nAdditional Information Required for Obtaining Permission to Construct, Extend or take into use any building as a Factory under Factories Act, 1948\nAdditional Information Required for Obtaining Permission to Construct, Extend or take into use any building as a Factory under Factories Act, 1948",
"footnote": "",
"is_definition": false,
"sort_order": 40
},
{
"number": "1",
"title": "1. A flow chart of the manufacturing process supplemented by a brief description of the process in its various stages.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 41
},
{
"number": "2",
"title": "2. Plans, in triplicate drawn to scale, showing:",
"chapter": null,
"content": "(a) The site of the factory and immediate surroundings including adjacent building and other structures, roads, drains etc; and\n(b) The plan elevation and necessary cross-sections of the various buildings indicating all relevant details relating to natural lighting, ventilation and means of escape in case of fire. The plans shall also clearly indicate the position of the plant and machinery, aisles and passage ways; etc.\nForm No. 1 A\nForm No. 1 A\n(Part C)\n(Part C)\nName of the Factory..................................\nName of the Factory..................................\nParticulars of Rooms in the Factory\nParticulars of Rooms in the Factory\nName of the Rooms in Factory\nName of the Rooms in Factory\nLength\nLength\nBreadth\nBreadth\nDimention in feet\nDimention in feet\nHeight\nHeight\nBreathing space (contents in cubic feet)\nBreathing space (contents in cubic feet)\nTotal volume of air in the room\nTotal volume of air in the room\nMax\nMin\nAverage\nTotal area in Square feet.\nFloor Area Occupied by Machinery in the room\nVentilation\nVentilation\nMaximum number of persons intended to be\n\t\t\t\temployed in the room\nMaximum number of persons intended to be\n\t\t\t\temployed in the room\nWhether the room is to be used as work room or\n\t\t\t\tstorage room\nWhether the room is to be used as work room or\n\t\t\t\tstorage room\nDate of construction\nDate of construction\nRemarks\nRemarks\nNumber and size of the\nNumber and size of window doors\nTotal area in square\nMaximum capacity of the opening feet room\nSignature of the Occupier_________________\nSignature of the Manager__________________\nQuestionnaire Annexed To Form No. 1A\nQuestionnaire Annexed To Form No. 1A\n(Part C)\n(Part C)\n(b) Is the sectional elevation of each room or shed etc., shown separately?\n(c) Is the minimum height of every room, shed, etc., shown clearly in sectional elevation?\n(d) Is the material of which the roof is constructed indicated in the sectional elevation?\n(e) Are the positions of various machines fitted or proposed to be fitted, shown in the drawings together with their names?\n(f) Are the minimum number of persons working or proposed to be working in different rooms, sheds etc., mentioned in the drawing?\n(g) Are all new buildings, parts of buildings or alterations in existing building shown by the boundaries duly marked by a distinctive colour?\n(a) Floor area of a room multiplied by height of the room (the maximum height for calculation, should not exceed 14 feet).\n(b) Is the maximum of persons shown, as the lower value of the two calculations? as shown below?\n(i) Floor area of a room less area occupied by machinery in the room divided by 36.\n(ii) Breathing space as in (a) above divided by 500.\n(c) Is the window and skylight area provided at the minimum area of 1 square feet to every 6.66 square feet of floor area of room? (It is recommended that window and skylight may be provided one opposite another so as to provide best cross-ventilation)\n(a) Is every work-room provided with at least two doors?\n(b) Is the minimum size of every door 6.-6\"X3.-3\"?\n(c) Are all the doors opening outwards?\n(a) Are two fire-escapes provided on either side of building?\n(b) Are the fire-escapes accessible from every room in the building?\n(c) Is the material used in construction of the fire-escape non-contributible?\n(d) Are the windows or doors giving access to an external staircase arranged to open immediately from inside?\n(a) Are the latrines and urinals provided separately?\n(b) Are these sufficient to meet the requirements of section 19 of the Factories Act, 1948 (Act 63 of 1948) read with rules 42 and 47 of the Factories Act, 1948 (Act 63 of 1948)?\n(c) Is the minimum distance of the nearest building shown?\n(d) Is the minimum distance of the nearest well shown?\n(e) Is the surrounding ground upto a distance of 4 feet all round made of impermeable material?\n(f) Is the surrounding ground raised to at least six inches above ground level?\n(g) Is any latrine, ventilator or opening in the proximity of any opening of main building?\n(h) Are these latrines flush type?\n(i) Are all the drains, pipes, sewers for carrying sullage, sewage water, effluent and waste products running in factory premises constructed of impermeable material?\n(j) Are the drains of flush-type latrine connected to drainage system of the Local Board?\n(k) Is an efficient system of sceptic tanks provided, if no drainage system exists?\n(l) Are the latrines provided with roofing?\n(a) Is the drinking water provided from a source provided by local board? [If not, whether the source from which the drinking water is supplied, has been approved by the Deputy Chief Medical Officer, Health or any of the laboratories recognized by the Water Pollution Board, Haryana or the State Public Health Authorities]\n(b) Is any well constructed in the premises of the factory for drinking water of humidification purpose?\n(c) Is the cylinder of the well pucca and impervious to water throughout and upto depth not less than the lower level of sub-soil water.\n(d) Are the positions of water centers shown in the plans?\nSignature_____________________________________\nDesignation___________________________________\nDate_________________________________________\nForm No. 1B\nForm No. 1B\n(Part C)\n(Part C)\nPlan and Specification\nPlan and Specification\nCertificate of stability of a factory or part of a factory.\nCertificate of stability of a factory or part of a factory.\n(To be submitted after completion and before working)\n(To be submitted after completion and before working)\nDescription of Building\nDescription of Building",
"footnote": "",
"is_definition": false,
"sort_order": 42
},
{
"number": "1",
"title": "1. Name of the factory__________________________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 43
},
{
"number": "2",
"title": "2. Name of the builder or contractor (s)_____________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 44
},
{
"number": "3",
"title": "3. General type of construction____________________________________",
"chapter": null,
"content": "(a) Full name of signatory (in block letters)_______________________\n(b) Qualifications____________________________________________\n(c) Present occupation________________________________________\n(d) Permanent postal address___________________________________",
"footnote": "",
"is_definition": false,
"sort_order": 45
},
{
"number": "4",
"title": "4. Purpose for which the building is to be used_______________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 46
},
{
"number": "5",
"title": "5. Name of room or building for which the certificate is granted giving reference to plan No._____________________________________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 47
},
{
"number": "6",
"title": "6. Nature of work to be carried on in the above room/building.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 48
},
{
"number": "7",
"title": "7. Nature and amount of moving power_____________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 49
},
{
"number": "8",
"title": "8. Signature___________________________________________________",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 50
},
{
"number": "9",
"title": "9. Date_______________________________________________________",
"chapter": null,
"content": "Note: - The person competent to give the certificate of stability shall possess -\nNote:\n(i) degree in Civil or Structural Engineering or equivalent;\n(ii) a minimum of ten years experience in the design or construction or testing or repair of structure;\n(iii) knowledge of Non-destructive testing, various codes of practices that are current and the effect of the vibration and natural forces on the stability of the building; and\n(iv) ability to arrive at a reliable conclusion with regard to the safety of the structure of the building.\nPart-D\nPart-D\n[ See rule 9(2) (v)]\nI.D. No.__________________\nAdditional Information Required For Permission From Town and Country Planning Department To Erect A Building For Industry\nAdditional Information Required For Permission From Town and Country Planning Department To Erect A Building For Industry\nThe Director,\nTown & Country Planning,\nHaryana, Chandigarh\n(a) a site plan in triplicate showing the position of the site proposed to be built upon as required by the rules.\n(b) plans, elevations and sections in triplicate as required by the rules.\n(c) drainage plans, engineering drawings (structural)in triplicate as required by the rules; and\n(d) specifications of the proposed building (in triplicate; and)\n(e) demand draft as prescribed under the rules-Rs 10/- per sq.mtr. address to Director, Town & Country Planning, Haryana payable at Chandigarh.\nSignature of applicant\nSpecifications\nSpecifications\n(PART-D)\n(PART-D)\nItems\nItems\nSpecifications\nSpecifications\n(a) Foundations\n(b) Walls\n(c) Damp-proof course\n(d) Floors\n(e) Roofs\n(f) Windows and Doors and other wood work\n(g) Steel Work\n(h) Internal finish\n(i) External finish\nSignature\nSupervisor-cum-Architect\nSignature of applicant\nPart-E\nPart-E\n[ See rule 9(2) (vi)]\nI.D. No.___________\nAdditional Information Required for Release of Electric Connection and Agreement for Industrial Supply\nAdditional Information Required for Release of Electric Connection and Agreement for Industrial Supply\nUttar Haryana Bijli Vitran Nigam Ltd/dakshin Haryana Bijli Vitran Nigam Ltd\nUttar Haryana Bijli Vitran Nigam Ltd/dakshin Haryana Bijli Vitran Nigam Ltd\nApplication and Agreement form in Respect of L.T. Industrial/street Lighting/bulk Supply/public Water Works Supply on lt (Upto 70 Kilo Watt)\nApplication and Agreement form in Respect of L.T. Industrial/street Lighting/bulk Supply/public Water Works Supply on lt (Upto 70 Kilo Watt)\n(Strike out whichever is not applicable)\nPhoto\n(for office use only)\nName of the Sub-Division__________________________\nApplication No.__________________________________\nDate of Receipt__________________________________\n(To be filled up by the applicant in Block Letters in Ink)\n(To be filled up by the applicant in Block Letters in Ink)\n1\nApplicant's Name\n2\nFather's name/Husband's name\n3\nFull Address of the premises at which' supply is\n\t\t\t\trequired.\n4\nTelephone No. (if any)\n5\nPermanent Address (Residential)\n6\nBank Account No. (if any)\n7\nName of the Bank with address\n8\nRation Card No./Voter Identity Card No./Pan\n\t\t\t\tNo./Driving License No.\nAny one\n9\nDetails of any other connection in the name of\n\t\t\t\tapplicant (if any)\nCategory_____________\nAccount\n\t\t\t\tNo.________________\nAddress______________\n10\nDetails of any other connection in the same\n\t\t\t\tpremises (if any)\n11\nIf Tenant, Landlord's Name and Address\n12\nCategory of Connection [L.T.\n\t\t\t\tIndustrial/Street/Bulk Supply(Domestic and Non-Domestic below 70\n\t\t\t\tKW), Public Water Works]\n13\nType of Industries\nA Seasonal/Non-Seasonal\nB Polluting/Non-Polluting\n14\nType of Connection (Temporary or Permanent)\n15\nConnected Load/Contract Demand, applied for (in\n\t\t\t\tKW/KVA) (Furnish details in table at page-4)\n16\nVoltage at which supply required (LT:3\n\t\t\t\tPhase/LT:1 Phase/11 KV)\n17\nWhether new connection, reconnection, \n\t\t\t\textension/reduction in load or change of name\n18\nExisting Account No.(if any) (for reconnection, \n\t\t\t\textension/reduction in load or change of name)\nDate_________________\nSignature of applicant ___________________\nAcknowledgement\nAcknowledgement\nDate\nDate\nApplicant's Name\nApplicant's Name\nCategory of supply\nCategory of supply\nApplication Number\nApplication Number\n(Signature of authorized officer)\nInstructions for applicant's:-\nInstructions for applicant's:-\n(i)\nApplication No. shall be allotted by the cashier\n\t\t\t\tat the time of receipt of application processing charges.\n(ii)\nPlease furnish installation test report issued\n\t\t\t\tby licensed electrical wiring contractor, after completion of\n\t\t\t\tinstallation giving full details of load/machinery.\nDeclaration\nDeclaration\n(Part-E)\n(Part-E)\nOR",
"footnote": "",
"is_definition": false,
"sort_order": 51
},
{
"number": "1",
"title": "1. That the applicant is a legal occupant/owner/landlord of the premises at................ in support of which the applicant has enclosed a proof of occupancy/ownership.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 52
},
{
"number": "2",
"title": "2. That in case of tenant;",
"chapter": null,
"content": "(i) the written consent of the landlord of the applicant's taking of the said supply is enclosed herewith; or\n(ii) the applicant is the lawful occupier of the premises, but it has not been possible to obtain consent of landlord and the applicant hereby agrees to keep the supplier indemnified and harmless against all claims made and actions and proceedings initiated by the landlord or any person claiming through or under him by reason of the giving of electric connection by the supplier to the applicant, Indemnity bond duly executed on court paper of Rs.15/- is attached.",
"footnote": "",
"is_definition": false,
"sort_order": 53
},
{
"number": "3",
"title": "3. That the applicant has requested the Uttar Haryana Bijli Vitran Nigam Limited/Dakshin Haryana Bijli Vitran Nigam Limited (hereinafter referred to as the \"Supplier\") to provide connection in the above mentioned premises in the applicant's name for the purpose mentioned in the application and agreement form.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 54
},
{
"number": "4",
"title": "4. That the applicant hereby further agrees and undertakes as under :",
"chapter": null,
"content": "(i) The applicant desires to have and agrees to take Electrical supplies for the purpose stated in the application and agreement from, from the supplier at the premises stated, not exceeding the sanctioned load of the installation.\n(ii) To indemnify the supplier against all proceedings, claims, demands, cost, damages, expenses that supplier may incur by reason of a fresh service connection to the applicant.\n(iii) That all the electrical work done within its/their premises are as per the provisions of Electricity Act, 2003, and indemnifies supplier against any loss to the applicant accrued on this account. Further applicant agrees that if there is any harm/loss to the property of supplier, due to the fault of the electrical network within the premises of the applicant, all the liabilities shall have to be borne by the applicant. Further, that the lift installed (if applicable) has been inspected and certified by the Lift Inspector and all the fire safety norms have been complied with and the necessary fire clearance certificate (if applicable) has been issued by the competent authority. The applicant indemnifies the supplier against all proceedings, claims, demands, costs, damages, and expenses that suppliers may incur by violation of the regulations.\n(iv) To accept and abide by all norms, conditions of supply, including Schedules of tariffs, Schedule of General and Miscellaneous Charges, as per the provisions of the Electricity Act, 2003 and other applicable laws in force, Rules/Regulations/Orders/Directives/Notification issued and endorsed under applicable laws by Haryana Electricity Regulatory Commission/CEA/Government of India/Government of Haryana and any other instructions/circulars issued by supplier/Nigam from time to time for equitable and efficient distribution of electric energy.\n(v) To pay for the said supply in accordance with the relevant applicable Schedule of tariffs and also to pay all such other proper charges (including Monthly Minimum Charges, if applicable), as may become due, to the supplier, from time to time at rates laid down in the Standard Schedule of General and Miscellaneous Charges prescribed by the supplier.\n(vi) To pay taxes/duties, as may be levied on the sale of electricity to the applicant by the supplier.\n(vii) Require the supplier to supply with the necessary meter/meters on hire in terms of section 55 of the Electricity Act, 2003. The applicant agrees to give the supplier such meter security and monthly meters service charges, as may be required for the price of the meter/meters, whenever called upon to do so. In case, meter is not readily available, the applicant may be permitted to arrange own meter of standard specification as approved by the suppliers.\n(viii) To be responsible for the safe custody of the meters, CTs, PTs, cables etc. provided by supplier and in case there is any damage of these equipments due to reasons attributable to the applicant, the same shall be chargeable to the applicant. Further all repercussions, on account of breakage of seals of meters etc. direct/dishonest/abstraction of energy shall be to the account of applicant as per the extent rules of supplier.\n(ix) To allow clear and un-encumbered access to the meters for the purpose of meter reading and its checking.\n(x) That the applicant shall have no objection at any time to the rights of the supplier to supply energy to any other consumer from the service line of apparatus installed on the applicant's premises.\n(xi) That the supplier shall not be held responsible for any interruption/diminution of supply beyond its control.\n(xii) That the supply shall be used for the purpose that it has been sanctioned by the supplier and shall not be misused in any way to serve any other purpose.\n(xiii) That the supply shall not be extended/sublet to any other premises.\n(xiv) That the applicant's industry/trade has not been declared to be obnoxious, hazardous/pollutant by any Government agency and that no court orders are being infringed by grant of supplied electricity connection at the applicant's premises.\n(xv) That grant of electricity connection will not confer any legal right for regularization of building/land use in respect to the electricity connection provided at the applicant's premises.\n(xvi) That the supplier shall be at liberty to adjust the electricity consumption charges along with any other charges against the security deposits paid by the applicant, in the event of termination of agreement or in case of any contractual default.\n(xvii) To pay any sum which may be found to become payable to supplier with regard to all liabilities personally as well as by means of both movable and immovable properties.\n(xviii)To deposit additional consumption security/ACD as revised by Uttar Haryana Bijli Vitran Nigam/Dakshin Haryana Bijli Vitran Nigam from time to time as per the prevailing regulations of Haryana Electricity Regulatory Commission.\n(xix) That the supplier shall be at liberty to transfer the dues remaining unpaid by the applicant to other service connection(s) that may stand in the applicant's name and recover the same against the consumption security/ACD.\n(xx) That the applicant would let supplier to disconnect the service connection under reference, in the event of any default, non-compliance of statutory provisions and in the event of legally binding directive by a statutory authority(s) to effect such an order. This shall be without prejudice to any other rights of supplier including that of getting its payment as on the date of connection.\n(xxi) The applicant is not a defaulter under the jurisdiction of Uttar Haryana Bijli Vitran Nigam and Dakshin Haryana Bijli Vitran Nigam.\n(xxii) There is no outstanding defaulting amount against the premises on which the connection is being sought.\n(xxiii) To pay any sum which may be found to become payable to supplier with regards to past dues of suppliers of the above premises.\n(xxiv) That the applicant shall abide by the power cut, restricted/peak load hours restrictions imposed by the supplier from time to time.\n(xxv) All details furnished in this application and agreement forms are true to the applicant's knowledge. If any information is found incorrect/concealed at a later stage, then the supplier will have the right to withhold/disconnect supply without any notice, as the case may be, and forfeit the securities deposited with the supplier and the supplier will have right to adjust all dues against the security deposits.\nWitness Name___________________________\n___________________________\nFather's Name___________________________\nSignature of the applicant\nAddress________________________________",
"footnote": "",
"is_definition": false,
"sort_order": 55
},
{
"number": "1",
"title": "1. Copy of registration deed/Municipal or Panchayat Tax Assessment Notice/Allotment letter by Haryana Urban Development Authority/Haryana State Industrial Development Corporation/Lease Deed/Rent Receipt.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 56
},
{
"number": "2",
"title": "2. Consent of landlord or indemnity Bond if consent of landlord not available in case of tenant seeking connection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 57
},
{
"number": "3",
"title": "3. General power of attorney in favour of signatory; in case of joint ownership and partnership firms; Certified true copy of the resolution, authorizing the signatory to deal with the Uttar Haryana Bijli Vitran Nigam/Dakshin Haryana Bijli Vitran Nigam, passed by the Board of Directors, in case of companies (as applicable).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 58
},
{
"number": "4",
"title": "4. Self attested photocopy of the partnership deed in case of partnership firms/memorandum and article of association in case of companies, (as applicable).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 59
},
{
"number": "5",
"title": "5. Copy of layout plan of the factory premises showing proposed location of meter & metering equipment i.e. meter and metering equipment should be located in a separate room at the main entrance of the factory premises having direct access from the main road.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 60
},
{
"number": "6",
"title": "6. No objection certificate from Haryana Water and Air Pollution Board (if applicable)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 61
},
{
"number": "7",
"title": "7. Attested copy of any one of documents listed at Serial Number 8 of page 1 of the form.",
"chapter": null,
"content": "Uttar Haryana Bijli Vitran Nigam Ltd/dakshin Haryana Bijli Vitran Nigam Ltd\nUttar Haryana Bijli Vitran Nigam Ltd/dakshin Haryana Bijli Vitran Nigam Ltd\n(Part-E)\n(Part-E)\nFor Office use only\nFor Office use only\nPayment Made With Application\nPayment Made With Application\nDate_________________\nSignature_______________________\nSr. No.\nSr. No.\nItem*\nItem*\nAmount (in Rs.)\nAmount (in Rs.)\n1.\nApplication Processing Fee\n2.\nConsumption Security\n3.\nMeter Security (if applicable)\n4.\nMeter testing fee (if applicable)\n5.\nApplicable Service connection charges as per\n\t\t\t\tHERC Regulation/Orders.\n6.\nAny other item\nTotal\nTotal\n* Strike out whichever is not applicable.\nCertificate of Site Verification\nCertificate of Site Verification\nDate____________\nNo Dues Certificate\nNo Dues Certificate\nAuthorization for Connection\nAuthorization for Connection\n(Part-E)\n(Part-E)\nFor Office use only\nFor Office use only\nAccepted and Sanctioned on behalf of the Uttar Haryana Bijli Vitran Nigam Ltd./Dakshin Haryana Bijli Vitran Nigam Ltd. for connected load of________Kilo Watt at_________voltage Level for_____________category connection.\nDated_____________\nSDO 'OP'\nThe following charges/additional charges, documents and equipment for release of connection as per site verification be accepted:\n(A) Charges: -\nSr. No.\nSr. No.\nItem*\nItem*\nAmount (in Rs.)\nAmount (in Rs.)\n1.\nConsumption Security\n2.\nMeter Security (if applicable)\n3.\nMeter testing fee (if applicable)\n4.\nApplicable Service connection charges as per\n\t\t\t\tHaryana Electricity Regulatory Commission Regulation/Orders.\n5.\nAny other item\n*Notes: - Strike out whichever is not\n\t\t\t\tapplicable.\n(B) Documents and Equipments\n(i) Test Report\n(ii) Energy Meter (if applicable)\nDated______________\nSDO 'OP’\nReceived Rs. ________________ (Rupees__________________________)\nVide Receipt No.___________________ Dated _____________________\nName______________Designation______________Signature__________\nReceived documents and equipments _____________\nName _____________ Designation ____________ Signature\n\t\t\t\t____________\nThe Account number allotted to applicant\n\t\t\t\tis___________________________\nThe service connection order number\n\t\t\t\tis_____________________________\nName ________________Signature______________ Dated __________\nDetails of Calculation of Load to be Filled by Applicant\nDetails of Calculation of Load to be Filled by Applicant\n(Norms may be revised from time to time)\n(Norms may be revised from time to time)\nSerial Number\nSerial Number\nParticulars\nParticulars\nNo. of points\nNo. of points\nTotal Load (in Kilo Watt)\nTotal Load (in Kilo Watt)\nFor office use only\nFor office use only\n1\nLight points (40 watt each)\n2\nFan Points (60 watt each)\n3\nWall Socket (5 Amp) 6 sockets or part thereof =\n\t\t\t\t40 watts)\n4\nWall Socket (15A) (6 sockets or part thereof = 1\n\t\t\t\tKilo Watt)\n5\nRose outlets for light point\n(i) For DS :- 1 to 5 rose outlets (40 watts); 6\n\t\t\t\tto 10 rose outlets (2x40 watts)\n(ii) For NDS : 40 watt for each rose outlet\n6\nAir-Conditioners through Wall Socket (take\n\t\t\t\tactual load as per capacity)\n7\nGeysers through wall socket (take actual load as\n\t\t\t\tper capacity)\n8\nDetails of industrial load as per format\n\t\t\t\t(Annexure-1)\nTotal\nTotal\nAnnexure I\nAnnexure I\nDetails of the industrial load\nDetails of the industrial load\n(Part E)\n(Part E)\nSerial No.\nSerial No.\nDetails of Motors/Equipment\nDetails of Motors/Equipment\nBHP\nBHP\nLoad in Kilo Watt\nLoad in Kilo Watt\nRemarks if any\nRemarks if any\nApplication and Agreement Form In Respect of H.T. Industrial/street Lighting/bulk Supply/public Water Works Supply On Ht (Upto 70 Kilo Watt)\nApplication and Agreement Form In Respect of H.T. Industrial/street Lighting/bulk Supply/public Water Works Supply On Ht (Upto 70 Kilo Watt)\n(Part E)\n(Part E)\n(Strike out whichever is not applicable)\nPhoto\n(for office use only)\nName of the Sub-Division__________________________\nApplication No.__________________________________\nDate of Receipt__________________________________\n(To be filled up by the applicant in Block Letters in Ink)\n(To be filled up by the applicant in Block Letters in Ink)\n1\nApplicant's Name\n2\nFather's name/Husband's name\n3\nFull Address of the premises at which supply is\n\t\t\t\trequired.\n4\nTelephone No. (if any)\n5\nPermanent Address (Residential)\n6\nBank Account No. (if any)\n7\nName of the Bank with address\n8\nRation Card No./Voter Identity Card No./Pan\n\t\t\t\tNo./Driving License No.\nAny one\n9\nDetails of any other connection in the name of\n\t\t\t\tapplicant (if any)\nCategory_______________\nAccount\n\t\t\t\tNo.____________\nAddress________________\n10\nDetails of any other connection in the same\n\t\t\t\tpremises (if any)\n11\nIf Tenant, Landlord's Name and Address\n12\nCategory of Connection [H.T.\n\t\t\t\tIndustrial/Street/Bulk Supply(Domestic and Non-Domestic above 70\n\t\t\t\tKW), Railway for Traction Public Water Works]\n13\nType of Industries\nA Seasonal/Non-Seasonal\nB Polluting/Non-Polluting\n14\nType of Connection (Temporary or Permanent)\n15\nConnected Load/Contract Demand, applied for (in\n\t\t\t\tKW/KVA) (Furnish details in table at page-4)\n16\nVoltage at which supply required (11 KV, 33 KV,\n\t\t\t\t 66 KV, 132 KV)\n17\nWhether new connection, reconnection, \n\t\t\t\textension/reduction in load or change of name\n18\nExisting Account No.(if any) (for reconnection, \n\t\t\t\textension/reduction in load or change of name)\nDate_________________________\nSignature of applicant\nAcknowledgement\nAcknowledgement\nDate\nDate\nApplicant's Name\nApplicant's Name\nCategory of supply\nCategory of supply\nApplication Number\nApplication Number\n(Signature of authorized officer)\nInstructions for applicant's:-\nInstructions for applicant's:-\n(i)\nApplication No. shall be allotted by the cashier\n\t\t\t\tat the time of receipt of application processing charges.\n(ii)\nPlease furnish installation Test report issued\n\t\t\t\tby licensed electrical wiring contractor, after completion of\n\t\t\t\tinstallation giving full details of load/machinery.\nDeclaration\nDeclaration\n(Part E)\n(Part E)\nOR",
"footnote": "",
"is_definition": false,
"sort_order": 62
},
{
"number": "1",
"title": "1. That the applicant is a legal occupant/owner/landlord of the premises at............ in support of which the applicant has enclosed a proof of occupancy/ownership.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 63
},
{
"number": "2",
"title": "2. That in case of tenant :-",
"chapter": null,
"content": "(i) the written consent of the landlord of the applicant's taking of the said supply is enclosed herewith; or\n(ii) the applicant is the lawful occupier of the premises, but it has not been possible to obtain consent of landlord and the applicant hereby agrees to keep the supplier indemnified and harmless against all claims made and actions and proceedings initiated by the landlord or any person claiming through or under him by reason of the giving of electric connection by the supplier to the applicant. Indemnity bond duly executed on court paper of Rs.15/- is attached.",
"footnote": "",
"is_definition": false,
"sort_order": 64
},
{
"number": "3",
"title": "3. That the applicant has requested the Uttar Haryana Bijli Vitran Nigam Limited/Dakshin Haryana Bijli Vitran Nigam Limited UHBVAN/DHVN (hereinafter referred to as the \"Supplier\") to provide connection in the above mentioned premises in the applicant's name for the purpose mentioned in the application and agreement form.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 65
},
{
"number": "4",
"title": "4. That the applicant hereby further agrees and undertakes as under:",
"chapter": null,
"content": "(i) The applicant desires to have and agrees to take Electrical supplies for the purpose stated in the application and agreement from, from the supplier at the premises stated, not exceeding the sanctioned load of the installation.\n(ii) To indemnify the supplier against all proceedings, claims, demands, cost, damages, expenses that supplier may incur by reason of a fresh service connection to the applicant.\n(iii) That all the electrical work done within its/their premises are as per the provisions of Electricity Act, 2003, and indemnifies supplier against any loss to the applicant accrued on this account. Further applicant agrees that if there is any harm/loss to the property of supplier, due to the fault of the electrical network within the premises of the applicant, all the liabilities shall have to be borne by the applicant. Further, that the lift installed (if applicable) has been inspected and certified by the Lift Inspector and all the fire safety norms have been complied with and the necessary fire clearance certificate (if applicable) has been issued by the competent authority. The applicant indemnifies the supplier against all proceedings, claims, demands, costs, damages, and expenses that suppliers may incur by violation of the regulations.\n(iv) To accept and abide by all norms, conditions of supply, including Schedules of tariffs, Schedule of General and Miscellaneous Charges, as per the provisions of the Electricity Act, 2003 and other applicable laws in force, Rules/Regulations/Orders/Directives/Notification issued and endorsed under applicable laws by Haryana Electricity Regulatory Commission/CEA/Government of India/Government of Haryana and any other instructions/circulars issued by supplier/Nigam from time to time for equitable and efficient distribution of electric energy.\n(v) To pay for the said supply in accordance with the relevant applicable Schedule of tariffs and also to pay all such other proper charges (including Monthly Minimum Charges, if applicable), as may become due, to the supplier, from time to time at rates laid down in the Standard Schedule of General and Miscellaneous Charges prescribed by the supplier.\n(vi) To pay taxes/duties, as may be levied on the sale of electricity to the applicant by the supplier.\n(vii) Require the supplier to supply with the necessary meter/meters on hire in terms of section 55 of the Electricity Act, 2003. The applicant agrees to give the supplier such meter security and monthly meters service charges, as may be required for the price of the meter/meters, whenever called upon to do so. In case, meter is not readily available, the applicant may be permitted to arrange own meter of standard specification as approved by the suppliers.\n(viii) To be responsible for the safe custody of the meters, CTs, PTs, cables etc. provided by supplier and in case there is any damage of these equipments due to reasons attributable to the applicant, the same shall be chargeable to the applicant. Further all repercussions, on account of breakage of seals of meters etc. direct//dishonest/abstraction of energy shall be to the account of applicant as per the extent rules of supplier.\n(ix) To allow clear and un-encumbered access to the meters for the purpose of meter reading and its checking.\n(x) That the applicant shall have no objection at any time to the rights of the supplier to supply energy to any other consumer from the service line of apparatus installed on the applicant's premises.\n(xi) That the supplier shall not be held responsible for any interruption/diminution of supply beyond its control.\n(xii) That the supply shall be used for the purpose that it has been sanctioned by the supplier and shall not be misused in any way to serve any other purpose.\n(xiii) That the supply shall not be extended/sublet to any other premises.\n(xiv) That the applicant's industry/trade has not been declared to be obnoxious, hazardous/pollutant by any Government agency and that no court orders are being infringed by grant of supplied electricity connection at the applicant's premises.\n(xv) That grant of electricity connection will not confer any legal right for regularization of building/land use in respect to the electricity connection provided at the applicant's premises.\n(xvi) That the supplier shall be at liberty to adjust the electricity consumption charges along with any other charges against the security deposits paid by the applicant, in the event of termination of agreement or in case of any contractual default.\n(xvii) To pay any sum which may be found to become payable to supplier with regard to all liabilities personally as well as by means of both movable and immovable properties.\n(xviii)To deposit additional consumption security/ACD as revised by Uttar Haryana Bijli Vitran Nigam/Dakshin Haryana Bijli Vitran Nigam from time to time as per the prevailing regulations of Haryana Electricity Regulatory Commission.\n(xix) That the supplier shall be at liberty to transfer the dues remaining unpaid by the applicant to other service connection(s) that may stand in the applicant's name and recover the same against the consumption security/ACD.\n(xx) That the applicant would let supplier to disconnect the service connection under reference, in the event of any default, non-compliance of statutory provisions and in the event of legally binding directive by a statutory authority(s) to effect such an order. This shall be without prejudice to any other rights of supplier including that of getting its payment as on the date of connection.\n(xxi) The applicant is not a defaulter under the jurisdiction of Uttar Haryana Bijli Vitran Nigam and Dakshin Haryana Bijli Vitran Nigam.\n(xxii) There is no outstanding defaulting amount against the premises on which the connection is being sought.\n(xxiii) To pay any sum which may be found to become payable to supplier with regard to past dues of suppliers of the above premises.\n(xxiv) That the applicant shall abide by the power cut, restricted/peak load hours restrictions imposed by the supplier from time to time.\n(xxv) All details furnished in this application and agreement forms are true to the applicant's knowledge. If any information is found incorrect/concealed at a later stage, then the supplier will have the right to withhold/disconnect supply without any notice, as the case may be, and forfeit the securities deposited with the supplier and the supplier will have right to adjust all dues against the security deposits.\nWitness\n\t\t\t\tName......................................\n...........................................\nFather's\n\t\t\t\tName.......................................\nSignature of the applicant\nAddress................................................\nAccount Number.................................\nName of\n\t\t\t\tapplicant........................................",
"footnote": "",
"is_definition": false,
"sort_order": 66
},
{
"number": "1",
"title": "1. Copy of registration deed/Municipai or Panchayat Tax Assessment Notice/Allotment letter by Haryana Urban Development Authority/Haryana State Industrial Development Corporation/Lease Deed/Rent Receipt.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 67
},
{
"number": "2",
"title": "2. Consent of landlord or Indemnity Bond if consent of landlord not available in case of tenant seeking connection.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 68
},
{
"number": "3",
"title": "3. General power of attorney in favour of signatory; in case of joint ownership and partnership firms; Certified true copy of the resolution, authorizing the signatory to deal with the Uttar Haryana Bijli Vitran Nigam/Dakshin Haryana Bijli Vitran Nigam, passed by the Board of Directors, in case of companies (as applicable).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 69
},
{
"number": "4",
"title": "4. Self attested photocopy of the partnership deed in case of partnership firms/memorandum and article of association in case of companies, (as applicable).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 70
},
{
"number": "5",
"title": "5. Copy of layout plan of the factory premises showing proposed location of meter & metering equipment i.e. meter and metering equipment should be located in a separate room at the main entrance of the factory premises having direct access from the main road.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 71
},
{
"number": "6",
"title": "6. No objection certificate from Haryana Water and Air Pollution Board (if applicable)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 72
},
{
"number": "7",
"title": "7. Attested copy of any one of documents listed at Serial Number 8 of page 1 of the form.",
"chapter": null,
"content": "Form II\nForm II\n[See rule 9 (3)(i)]\nI.D. No._____________________\nCommon Sheet\nCommon Sheet\n[See rule 9(3) (i)]",
"footnote": "",
"is_definition": false,
"sort_order": 73
},
{
"number": "1",
"title": "1. Name and Address of The Promoter/industrial\n\t\t\t\tUndertaking (Block Letters)",
"chapter": null,
"content": "Name of the Industrial undertaking\nName of the\n\t\t\t\tpromoter/Managing Director/Managing Partner with surname first",
"footnote": "",
"is_definition": false,
"sort_order": 74
},
{
"number": "2",
"title": "2. Address for\n\t\t\t\tcommunication",
"chapter": null,
"content": "Tel:\nPin Code\nFax:\nE-mail",
"footnote": "",
"is_definition": false,
"sort_order": 75
},
{
"number": "3",
"title": "3. Constitution of\n\t\t\t\tthe Firm/company :",
"chapter": null,
"content": "Proprietorship/Partnership/Pvt.\n\t\t\t\tLtd./Public Ltd./others if any",
"footnote": "",
"is_definition": false,
"sort_order": 76
},
{
"number": "4",
"title": "4. Location:",
"chapter": null,
"content": "Place/Town\nTehsil/Taluk\nDistrict :\nState :",
"footnote": "",
"is_definition": false,
"sort_order": 77
},
{
"number": "5",
"title": "5. Main items of\n\t\t\t\tmanufacture/ activity.",
"chapter": null,
"content": "S.No\nS.No\nProducts/Services\nProducts/Services\nInstalled capacity (per annum)\nInstalled capacity (per annum)\n1.\n2.\n3.\n4.\n5.",
"footnote": "",
"is_definition": false,
"sort_order": 78
},
{
"number": "6",
"title": "6. Cost of the Project (Rs. in lacs)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 79
},
{
"number": "7",
"title": "7. Investment in\n\t\t\t\tFixed assets (Rs. in 000)",
"chapter": null,
"content": "(i) Land\n(ii) Building\n(iii) Plant and Machinery\n(iv) Other fixed assets\nTotal",
"footnote": "",
"is_definition": false,
"sort_order": 80
},
{
"number": "8",
"title": "8. Power requirement",
"chapter": null,
"content": "Kilo Watt",
"footnote": "",
"is_definition": false,
"sort_order": 81
},
{
"number": "9",
"title": "9. Water requirement\n\t\t\t\tper day :",
"chapter": null,
"content": "Kilo Litres\n(i) For process and Wash\n(ii) For Cooling\n(iii) Sanitary\n(iv) Total",
"footnote": "",
"is_definition": false,
"sort_order": 82
},
{
"number": "10",
"title": "10. Proposed\n\t\t\t\tEmployment",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 83
},
{
"number": "11",
"title": "11. Date of\n\t\t\t\tcommencement of production",
"chapter": null,
"content": "Signature of applicant (authorised person)\nPART - A\nPART - A\n[See rule 9(3) (ii)]\nAdditional Information Required for Obtaining Consent Under Pollution Control Acts\nAdditional Information Required for Obtaining Consent Under Pollution Control Acts",
"footnote": "",
"is_definition": false,
"sort_order": 84
},
{
"number": "1",
"title": "1. Consent to/operate/renewal of consent under sections 25 and 26 of the Water (Prevention and Control of Pollution) Act, 1974 as amended.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 85
},
{
"number": "21",
"title": "2. Consent to/operate/renewal of consent under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981 as amended.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 86
},
{
"number": "5",
"title": "3. Authorization/renewal of authorization under rule 5 of the Hazardous Waste (Management and Handling) Rule, 1989, as amended in connection with my/our existing/proposes/altered/additional manufacturing/processing activities from the premises as per detail given below:-",
"chapter": null,
"content": "Part A General\nPart A General\n1\n(a) Details of\n\t\t\t\tplanning permission obtained from Municipal\n\t\t\t\tCorporation/Directorates of Urban Development of Town and Country\n\t\t\t\tPlanning/Haryana Urban Development Authority, whichever\n\t\t\t\tapplicable.\n(b) Name of the Municipal Corporation/Panchayat\n\t\t\t\tSamiti/Panchayat under whose jurisdiction the unit is located and\n\t\t\t\tname of the license issuing authority.\nYes No.\n______________________ ______________________ ______________________ ______________________\n2.\nName/Address with telephone, fax and E-mail\n\t\t\t\taddress of the Managing Director/Managing Partner and Officer\n\t\t\t\tresponsible for the matter connected with Pollution Control and\n\t\t\t\tHazardous Waste Disposal.\n3.\nIf registered as a small-scale industrial unit\n\t\t\t\tgive number and date of registration.\nYes No.\nNo. _______ Dated ______\n4.\nIf the site is located near seashore/river\n\t\t\t\tbank/other water bodies; indicate the name and distance of water\n\t\t\t\tbody.\n______________________ ______________________\n5.\nDoes the location satisfy the requirements under\n\t\t\t\trelevant Central/State Government notifications on ecologically\n\t\t\t\tfragile area etc., if so give details?\nYes/No\n6.\nIf the site is\n\t\t\t\tsituated in notified industrial estate:\n(a) whether effluent\n\t\t\t\tcollection, treatment and disposal system has been provided by\n\t\t\t\tthe authority;\n(b) will the\n\t\t\t\tapplicant utilize the system, if provided;\n(c) if not provided, details of proposed\n\t\t\t\tarrangement for the treatment of effluent.\nYes/No. Yes/No. Yes/No.\n7.\nTotal Plot area, Built up area and area\n\t\t\t\tavailable for the use of treated sewage/trade effluent.\n______________________\n8.\n(a) Do you have a\n\t\t\t\tresidential colony within the premises in respect of which the\n\t\t\t\tpresent application is made?\n(b) If yes, please\n\t\t\t\tstate population staying.\n(c) Indicate its location and distance with\n\t\t\t\treference to plant site.\n______________________ ______________________ ______________________\n9.\nList of raw materials and process of chemicals\n\t\t\t\twith annual consumption corresponding to above stated production\n\t\t\t\tfigures, in tons/month or numbers/month.\n______________________ ______________________\n10.\nDescription of process of manufacture of each of\n\t\t\t\tproducts showing input/output, quality and quality of solid, \n\t\t\t\tliquid and gaseous wastes, if any, forms each unit process, \n\t\t\t\t(to be supported by flow sheet and or material balance).\n______________________ ______________________ ______________________\nPart B: Waste water aspects (for Water of Consent) if not applicable write not applicable\nPart B: Waste water aspects (for Water of Consent) if not applicable write not applicable\n11.\nWater Consumption for\n\t\t\t\tdifferent uses (m3/day)\n(1) Industrial\n\t\t\t\tcooling, spraying in mine pits or boiler feeds.\n(2) Domestic\n\t\t\t\tpurpose.\n(3) Processing\n\t\t\t\twhereby water gets polluted and the pollutants are easily\n\t\t\t\tbiodegradable and are toxic.\n(4) Processing\n\t\t\t\twhereby water gets polluted and the pollutants are not easily\n\t\t\t\tbiodegradable and are toxic.\n(5) Other such as\n\t\t\t\tagriculture, gardening etc. (specify).\nTotal _________________________\nTotal\n_______________________\n_______________________\n_______________________\n_______________________\n_______________________\n12.\nSource of water supply, name of the authority\n\t\t\t\tgranting permission if applicable and quality permitted.\n_______________________\n13.\nQuantity of waste\n\t\t\t\twater (effluent) generated (m/3 day)\n(1) Domestic\n(2) Industrial\n_______________________\n_______________________\n_______________________\n14.\nWater budget calculations accounting for\n\t\t\t\tdifference between water consumption and effluent generated.\n_______________________\n15.\nPresent treatment of sewage/canteen effluent\n\t\t\t\t(give size capacity)\n_______________________\n16.\nPresent treatment of trade effluent (give\n\t\t\t\tsizes/capacity of treatment units). (A schematic diagram of\n\t\t\t\ttreatment scheme with inlet/outlet characteristics of each unit\n\t\t\t\toperation/process is to be provided. Include details of residue\n\t\t\t\tmanagement system (sludges)\n_______________________ Yes/No.\n17.\n(a) As sewage and\n\t\t\t\ttrade effluent mixed together?\n(b) If yes, state at which stage whether\n\t\t\t\tbefore or after treatment.\n_______________________\n_______________________\n18.\nCapacity of treated effluents sumps, guard\n\t\t\t\tpond, if any.\n_______________________\n19.\nMode of disposal of\n\t\t\t\ttreated effluents, with respective quantity, m.per day -\n(I) into\n\t\t\t\tstream/river (name of the river)\n(ii) into\n\t\t\t\tdrain/sewer (Owner of the sewer)\n(iii) on land for\n\t\t\t\tirrigation on owned land/lease land specify the cropped area (to\n\t\t\t\tbe supported by relevant documents).\n(iv) quantity of treated effluents\n\t\t\t\treused/recycled. Provided location map of the disposal\n\t\t\t\tarrangement indicating the outlets for sampling.\n_______________________\n_______________________\n_______________________\n_______________________\n20.\nQuality of untreated/treated effluents (specify)\n\t\t\t\tpH and concentration of suspended solids, Bio Chemical, Oxygen\n\t\t\t\tDemand, Chemical Oxygen Demand and specific pollutants relevant\n\t\t\t\tto the industry. Total Dissolved solids to be reported for\n\t\t\t\tdisposal on land or into stream/river). Enclose a copy of latest\n\t\t\t\treport of analysis from the laboratory approved/recognized by\n\t\t\t\tHaryana State Pollution Control Board/Central Government in the\n\t\t\t\tMinistry of Environment and Forests. For proposed unit furnish\n\t\t\t\texpected characteristics of untreated/treated effluents.\nPara Meter \n\t\t\t\t Result Limit\nPara Meter \n\t\t\t\t Result Limit\nPH\nBOD\nSS\nCOD\nTDS\nPart C : Air\n\t\t\t\tEmission aspect (for Air Consent)\nPart C : Air\n\t\t\t\tEmission aspect (for Air Consent)\nif not applicable write not applicable\nif not applicable write not applicable\nYes/No.\n21.\nFuel Consumption\nCoal\nCoal\nLower Sulpher\nLower Sulpher\nHigh Speed\nHigh Speed\nFurnace Oil\nFurnace Oil\nNatural Gas\nNatural Gas\nOther (Specify)\nOther (Specify)\n(a)\nFuel Consumption (Tons per day)\n(b)\nCaloric value\n(c)\nAsh Content %\n(d)\nSulpher Content %\n(e)\nOthers (specify)",
"footnote": "",
"is_definition": false,
"sort_order": 87
},
{
"number": "22",
"title": "22. Details of stack",
"chapter": null,
"content": "(a) Stack Numbers\n1\n2\n3\n(b) Attached to\n(c) Fuel Type\n(d) Fuel quantity\n(e) Material of Construction\n(f) Shape (Round/Rectangular)\n(g) Height in meters (above ground level)\n(h) Diameter/size in meters\n(i) Gas quantity, Nm3/hour\n(j) Gas Temperature oC\n(k) Exist Gas Velocity, Tons/sec\n(l) Control equipment proceeding the stack\n(Attach Specification including residue Management System of each\n\t\t\t\tof the Control equipment indicating the inlet/outlet\n\t\t\t\tconcentration of relevant pollutants).\n23.\nDo you have adequate facility of collection of\n\t\t\t\tsamples of emission in the form of portholes, platforms, ladder\n\t\t\t\tetc., as per Central Board Publication \"Emissions Part III\"\n\t\t\t\t(December 1985).\nYes/No.\n24.\nQuality of treated fuel gas emission and process\n\t\t\t\temissions. Specify concentration of criteria pollutants and\n\t\t\t\tindustry/process specific pollutants stack-wise. Enclose a copy\n\t\t\t\tof latest report of analysis from the approved/recognized\n\t\t\t\tlaboratory by Haryana State Pollution Control Board/Central\n\t\t\t\tGovernment in the Ministry of Environment and Forest. For\n\t\t\t\tproposed units furnish the expected characteristics of the\n\t\t\t\temission.\nParameter Result\nSPM__________\nSO 2 __________\nNOX__________\nPart D : Hazardous Water Aspects (for authorization under Hazardous Waste Rules) if not applicable write not applicable.\nPart D : Hazardous Water Aspects (for authorization under Hazardous Waste Rules) if not applicable write not applicable.\n25.\n(a) Whether the unit\n\t\t\t\tis generating Hazardous waste as defined in the Hazardous Waste\n\t\t\t\t(Management and Handling) Rules, 1989 as amended.\n(b) If so, category No\nYes/No.\n___________________________\n26.\nAuthorization\n\t\t\t\trequired for\n(i) Collection\n(ii) Reception\n(iii) Treatment\n(iv) Transport\n(v) Storage\n(vi) Disposal of the Hazardous waste\n___________________________\n27.\nQuantity of the Hazardous Waste generated\n\t\t\t\t(kilogram/day) or (tons/month)\n28.\nCharacteristics of the Hazardous waste specify\n\t\t\t\tthe concentration of the relevant pollutants. Enclose the copy of\n\t\t\t\tlatest report of analysis from the laboratory approved/recognized\n\t\t\t\tby Haryana State Pollution Control Board. For proposed unit\n\t\t\t\tfurnish expected characteristics.\n29.\nMode of storage (Intermediate/final) (describe\n\t\t\t\tarea, location and methodology).\n30.\nPresent treatment of Hazardous Waste, if any, \n\t\t\t\t(give type and capacity of treatment units).\n31.\nQuantity of Hazardous\n\t\t\t\tWaste disposed\n(i) Within factory.\n(ii) Outside the\n\t\t\t\tfactory (specify location and enclose copies of agreement).\n(iii) Through sale\n\t\t\t\t(Enclose documentary proof and copies of agreement).\n(iv) Outside\n\t\t\t\tState/Union Territory, if yes particulars of (i) and (ii) above.\n(v) Others (specify)\nPart E: Additional Information\nPart E: Additional Information\n32.\n(a)\n(b)\nDo you have any\n\t\t\t\tproposals to upgrade the present system for treatment and\n\t\t\t\tdisposal of effluent/emission and Hazardous Waste.\nIf yes give the details with time-schedule for\n\t\t\t\tthe implementation and aprox. Expenditure to be incurred on it.\n33.\nCapital and Recurring (Operations and\n\t\t\t\tMaintenance) expenditure on the various aspects of environment\n\t\t\t\tprotection such as effluent emission HW solid waste tree\n\t\t\t\tplantation monitoring data acquisition etc.\n34.\nTo which the Pollution Control equipment\n\t\t\t\tseparates meters for recording consumption of electric energy are\n\t\t\t\tinstalled ?\n35.\nWhich of the pollution control items are\n\t\t\t\tconnected to Diesel Generator set (captive power source) to\n\t\t\t\tensure the running in the event of normal power failure?\n36.\nName, quantity and method of disposal\n\t\t\t\tnon-hazardous solid waste generated separately from the process\n\t\t\t\tof manufacture & waste treatment (give details of\n\t\t\t\tarea/capacity available in application in applicant's land).\n37.\n(a)\n(b)\n(c)\nHazardous Chemicals\n\t\t\t\tare defined under the Manufacture, Storage and Import of\n\t\t\t\tHazardous Chemicals, Rule 1989.\nList of Hazardous\n\t\t\t\tChemicals stores (imported and indigenous).\nDetail of isolated\n\t\t\t\tstorage.\nDetails of emergency preparedness plans\n\t\t\t\t(on-site/off site prepared).\n38.\nBrief details of tree plantation/green belt\n\t\t\t\tdevelopment within applicant's premises.\n39.\nInformation of schemes for waste minimization, \n\t\t\t\tsource recovery and recycling implemented and to be implemented, \n\t\t\t\tseparately.\n40.\nAny other additional information that the\n\t\t\t\tapplicant desires to give.\n41.\nI/we further declare that the information\n\t\t\t\tfurnished above is correct to the best of my/our knowledge.\n42.\nI/we hereby submit that in case of any change\n\t\t\t\tfrom what is stated in this application in respect of raw\n\t\t\t\tmaterials, products, process of manufacture and treatment\n\t\t\t\tand/or disposal of emissions, hazardous waste etc. in quality\n\t\t\t\tand quantity; a fresh application for consent/authorization shall\n\t\t\t\tbe made and until the grant of fresh consent/authorization no\n\t\t\t\tchange shall be made.\n43.\nI/we undertake to furnish any other information\n\t\t\t\twithin one month of its being called by the Board/Committee.\n44.\nI/we agree to submit to the board an application\n\t\t\t\tfor renewal of consent/authorization in two months in advance\n\t\t\t\tbefore the date of expiry of the consent/authorization.\nSignature________________\nName___________________\nDesignation______________\nDocuments enclosed :",
"footnote": "",
"is_definition": false,
"sort_order": 88
},
{
"number": "1",
"title": "1. Demand draft or receipt of deposit in an authorized bank towards consent fee/authorization.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 89
},
{
"number": "2",
"title": "2. Undertaking or affidavit or statement from the annual report or certificate from the Chartered Accountant in support of gross fixed investments.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 90
},
{
"number": "3",
"title": "3. Site plan/location map (in case No objection certificate was not obtained earlier).",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 91
},
{
"number": "4",
"title": "4. Declaration regarding the distance of unit from the bank of main river and in respect of stone crusher, hot mix plant for distance from highways and habitations.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 92
},
{
"number": "5",
"title": "5. Layout plan showing location of stacks(chimney), effluent treatment plant, effluent disposal areas, Air Pollution Control Board devices, Hazardous Waste treatment and disposal areas.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 93
},
{
"number": "6",
"title": "6. Manufacturing process flow sheet, with distractive note on the manufacturing process for such product.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 94
},
{
"number": "7",
"title": "7. Copies of latest consent/authorization/environmental impact assessment clearance.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 95
},
{
"number": "8",
"title": "8. Copy of small-scale industries registration certificate, if applicable.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 96
},
{
"number": "9",
"title": "9. Copies of letter of indent/industrial licenses, clearance from the department of any other relevant document (please state)",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 97
},
{
"number": "10",
"title": "10. Copies of planning permission certificate issued by the Municipal Corporation/Directories of Urban Development or Town and Country Planning/Haryana Urban Development Authority.",
"chapter": null,
"content": "Note: The documents at serial Nos. 2-10 are necessary for first application/for/applications for renewal only document at serial No. 7 is necessary.\nPART-B\nPART-B\n[See rule 9 (3) (iii)]\nFor the Year __________________\nFor the Year __________________\nAdditional Information Required for Registration and Grant/renewal of Licence Under the Factories Act, 1948 (Act 63 of 1948)\nAdditional Information Required for Registration and Grant/renewal of Licence Under the Factories Act, 1948 (Act 63 of 1948)\n1.\nFull name of the factory with factory licence number, if\n\t\t\t\talready registered from before.\n2.\n(a) Full postal address and\n\t\t\t\tsituation of the factory\n(b) Full address to which communication relating to the\n\t\t\t\tfactory should be sent.\n3.\nNature of manufacturing\n\t\t\t\tprocess/processes-\n(a) Carried on in the factory\n\t\t\t\tduring the last twelve months (in the case of factories already\n\t\t\t\tin existence)\n(b) To be carried on in the factory during the next twelve\n\t\t\t\tmonths (in the case of new factories)\n4.\nName and values of principal products manufactured during the\n\t\t\t\tlast twelve months.\n5.\n(i) Maximum number of Workers\n\t\t\t\tproposed to be employed on any one day during the year\n(ii) Maximum number of workers\n\t\t\t\temployed on any one day during last twelve months\n(iii) Number of workers to be ordinarily employed in the\n\t\t\t\tfactory.\n6.\n(i) Nature and total amount of\n\t\t\t\tpower (H.P.) installed or proposed to be installed\n(ii) Maximum amount of power (H.P.) proposed to be used.\n7.\n(i) Full name and residential\n\t\t\t\taddress of the person who shall be the manager of the factory for\n\t\t\t\tpurposes of the Act.\n(ii) Full name and residential address of the occupier.\n8.\n(i) The proprietor of the factory\n\t\t\t\tin case of private firm/proprietary/firm.\n(ii) Director in case of a public\n\t\t\t\tlimited liability company/firm.\n(iii) Where Managing Agent has\n\t\t\t\tbeen appointed, the name of the Managing Agent and Directors\n\t\t\t\tthereof.\n(iv) Shareholders in case of a\n\t\t\t\tPrivate Company where no Managing Agents have been appointed.\n(v) The Chief Administrative Head in case of Government or\n\t\t\t\tlocal fund factory.\n9.\nFull name and address of the owner of the premises or building\n\t\t\t\t(including the precincts, thereof) referred to in section 93 of\n\t\t\t\tthe Factories Act, 1948 (Act 63 of 1948).\n10.\nIn the case of factory constructed\n\t\t\t\tor extended after the date of the commencement of the rules-\n(a) reference number and date of\n\t\t\t\tapproval of the plans for site whether for old or new building\n\t\t\t\tand for construction or extension of factory by the State\n\t\t\t\tGovernment/Chief Inspector.\n(b) reference number and date of approval of the arrangement,\n\t\t\t\t if any, made for the disposal of trade waste and effluents and\n\t\t\t\tthe name of the authority granting such approval.\n11.\nAmount of fee\n\t\t\t\tRs____________________(Rupees_______________________________)\n(i) Paid in____________________\n\t\t\t\tTreasury on____________________________ vide Challan\n\t\t\t\tNo___________________________________________________\n\t\t\t\tDated_________________________\n\t\t\t\t(enclosed)_________________________\nDraft No________ dated__________\n(ii) Transmitted by crossed Postal Order No. on the\n\t\t\t\tBank______________ Drawn in favour of Chief Inspector Factories, \n\t\t\t\tHaryana, of the Post Office.\nSignature of\n\t\t\t\tOccupier__________________\nDated_______________\nDate_______________________________\nSignature of\n\t\t\t\tManager__________________\nDate_______________________________\nNote - (1) This form\n\t\t\t\tshould be completed in ink in block letters or typed.\nNote -\n(2) If power is not used at the\n\t\t\t\ttime of filling up this form but introduced later, the fact\n\t\t\t\tshould be communicated to the Chief Inspector of Factories, \n\t\t\t\tHaryana, immediately.\n(3) If any of the persons named against item 8 is a minor, \n\t\t\t\tthe fact should be clearly stated.\nCheck List For Composite Application Form\nCheck List For Composite Application Form\n[ See rule 9 (7)]\nForm - I\nForm - I\n1.\n1.\nCommon Sheet\nCommon Sheet\n5 copies\n2.\n2.\nNo Objection Certificate (NOC) from Pollution\n\t\t\t\tControl Board\nNo Objection Certificate (NOC) from Pollution\n\t\t\t\tControl Board\n(i)\nForm Part A\n3 copies\n(ii)\nNo Objection Certificate fee\n(iii)\nUndertaking regarding absence of trade\n\t\t\t\teffluent/air emission\n(iv)\nScheme of ETP/APCM/HWM\n(v)\nProject report\n3.\n3.\nChange of Land Use (CLU) from Town and\n\t\t\t\tCountry Planning Department\nChange of Land Use (CLU) from Town and\n\t\t\t\tCountry Planning Department\n(i)\nForm Part B\n3 copies\n(ii)\nSurvey of land\n3 copies\n(iii)\nCopy of deed showing the title of land in favour\n\t\t\t\tof applicant\n3 copies\n(iv)\nCopy of project report\n3 copies\n(v)\nCopy of Fard Jamabandi, Aksh sajra, mutations\n\t\t\t\tetc.\n3 copies\n(vi)\nCopy of site plan and land utilization plan\n3 copies\n(vii)\nDemand Draft\n3 copies\n4.\n4.\nPermission to construct a factory from Chief\n\t\t\t\tInspector of Factories\nPermission to construct a factory from Chief\n\t\t\t\tInspector of Factories\n(A) Application Form (Part C)\n(A) Application Form (Part C)\n(i) Form No. 1 - Application form for approval\n\t\t\t\tof building plans\n(ii) Form No. 1A - Details of work rooms\n(iii) Questionnaire annexed to form No. 1A -\n\t\t\t\tChecklist regarding various provisions relating to Safety, \n\t\t\t\tHealth and Welfare of workers.\n(iv) Stability Certificate\n(v) Factory Building Plans-indicating relevant\n\t\t\t\tdetails relating to natural lighting, ventilation, means of\n\t\t\t\tescape.\n(vi) Flow chart with brief description of\n\t\t\t\tmanufacturing process.\n(vii) N.O.C. from local authorities.\n(viii) N.O.C./Consent from Pollution Control\n\t\t\t\tBoard (only for Polluting Factories)\n(ix) N.O.C. from Fire Station Officer (only for\n\t\t\t\tfire prone factories)\n(x) Safety Reports\n(B) Scrutiny of Plan\n(B) Scrutiny of Plan\n(I) Whether the building plans, site plan, \n\t\t\t\tsectional elevation, cross section of the building submitted in\n\t\t\t\ttriplicate?\n(ii) Whether the building plan, site plan, \n\t\t\t\tsectional elevation cross section of the building have been\n\t\t\t\tsigned by the competent engineer?\n(iii) Whether on the Site Plan-site of factory\n\t\t\t\tand immediate surroundings including building and other\n\t\t\t\tstructures, road, drains etc. have been shown?\n(iv) Whether the Factory Building Elevation is\n\t\t\t\tshown?\n(v) Whether the Cross section of the building is\n\t\t\t\tshown?\n(vi) Are the following facilities shown in the\n\t\t\t\tplan:\n(a) Drinking Water\n(b) Washing Place\n(c) Cloak room\n(vii) Is the position of plant and machinery\n\t\t\t\tindicated in the plan?\n(viii) Are the emergency exists duly marked and\n\t\t\t\tshown in the plans?\n(ix) Other Requirements\nRequired\nProvided\nLatrines/Urinal(s)\nRest Room\nCanteen\nDining Hall\nKitchen\nStore Room\nWashing Place\nAmbulance Room\n(C) Scrutiny of Form No. 1\n(C) Scrutiny of Form No. 1\n(i) Whether the Form No. 1 submitted in\n\t\t\t\ttriplicate?\n(ii) Whether the Form No. 1 is complete? If No\n\t\t\t\tthen which column is incomplete:\n(iii) Whether the Form No. 1 is duly signed by\n\t\t\t\tthe Occupier?\n(D) Scrutiny of Form No. 1A\n(D) Scrutiny of Form No. 1A\n(i) Whether the Form No.l-A submitted in\n\t\t\t\ttriplicate.\n(ii) Whether the Form No.l-A is complete? If\n\t\t\t\tNo. then which column is incomplete:\n(iii) Whether the Form No.l-A is duly signed by\n\t\t\t\tthe occupier?\n(iv) Whether maximum number of persons to be\n\t\t\t\temployed in any room are more than maximum. Capacity of the room\n\t\t\t\tas per details provided in Form No.l-A?\n(v) Whether the ventilation/natural lighting\n\t\t\t\tarea is less than 15% of floor area of the room?\n(vi) Is the minimum height of work room is in\n\t\t\t\taccordance with the provisions of rule 6\nIf not the details thereof:\nNames of Room\nHeight Required\nHeight Provided",
"footnote": "",
"is_definition": false,
"sort_order": 98
},
{
"number": "5",
"title": "5. Permission to erect a building from Town and Country Planning Department/Haryana Urban Development Authority.",
"chapter": null,
"content": "(i)\nForm Part D\n3 copies\n(ii)\nSite plan\n3 copies\n(iii)\nPlan elevations and selections\n3 copies\n(iv)\nDrainage Plan, engineering drawings structure\n3 copies\n(v)\nSpecification of the proposed building\n3 copies\n(vi)\nDemand Draft",
"footnote": "",
"is_definition": false,
"sort_order": 99
},
{
"number": "6",
"title": "6. Release of Electric connection",
"chapter": null,
"content": "(i)\nForm Part E\n3 copies\n(ii)\nWritten consent from landlord if rented premises\n3 copies\n(iii)\nIndemnity Bond\n(iv)\nAffidavit\n(v)\nDemand Draft\nForm-II\nForm-II\n[ See rule 10(7)]\n1.\n1.\nCommon Sheet\nCommon Sheet\n5 copies\n2.\n2.\nConsent to operate from Haryana State Pollution\n\t\t\t\tControl Board\nConsent to operate from Haryana State Pollution\n\t\t\t\tControl Board\n(i)\nForm Part A\n3 copies\n(ii)\nUndertaking regarding gross fixed investment\n1 copy\n(iii)\nSite Plan, if No Objection Certificate not\n\t\t\t\tobtained earlier\n1 copy\n(iv)\nDeclaration layout plan\n1 copy\n(v)\nManufacturing process flow sheet\n1 copy\n(vi)\nCopies of latest\n\t\t\t\tconsent/authorization/environmental impact assessment clearance\n1 copy\n(vii)\nCopies of planning permission certificate\n1 copy\n(viii)\nDemand Draft\n3.\n3.\nLicense from Chief Inspector of Factories under\n\t\t\t\tthe Factories Act, 1948\nLicense from Chief Inspector of Factories under\n\t\t\t\tthe Factories Act, 1948\n(i)\nForm Part B\n3 copies\n(ii)\nUndertaking\n1 copy\n(iii)\nTreasury Challan/Demand Draft\nSchedule II\nSchedule II\n[See rule 9 (5)]\n(Undertaking)\n(Undertaking)",
"footnote": "",
"is_definition": false,
"sort_order": 100
},
{
"number": "1",
"title": "1. Our firm/company is proposing to set up a project at_____________(complete address)______________________to manufacture/to provide services as mentioned below:",
"chapter": null,
"content": "1.\n2.\n3.\n4.",
"footnote": "",
"is_definition": false,
"sort_order": 101
},
{
"number": "12",
"title": "2. We certify that the particulars furnished in the Common Application Form are true, and correct and complete to the best of our knowledge and undertake to adhere to the declarations made thereunder. The firm/Company shall be made liable for penal action as proposed under section 12 if the particulars furnished are found to be false/incorrect or incomplete and on our failure to adhere to the declarations made.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 102
},
{
"number": "3",
"title": "3. The firm/company hereby undertake to abide by the conditions specified in each of the clearances and our failure to comply with the requirements/conditions of clearances shall result in withdrawal/cancellation of the clearances and further, shall make us liable for legal action as specified under the respective Acts/rules.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 103
},
{
"number": "4",
"title": "4. The firm/company undertake to comply with all the provisions of applicable Acts/rules/regulations to our industry.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 104
},
{
"number": "5",
"title": "5. Any losses to personal or public property caused due to wrong certification by the firm/company shall be liable to be borne by the firm/company.",
"chapter": null,
"content": "Place:\nFor_____________________________________\nDate:\nAuthorised Signatory ______________________\nName___________________________________\nDesignation _____________________________\nSchedule III\n[See rule 9 (6)]\nAcknowledgement\nAcknowledgement\n1.\n2.\n3.\n4.\n5.\nPlease quote application ID No. for future correspondence\nPlace:\nAuthorised Representative of Nodal Agency\nDate:\nAcknowledgement\nAcknowledgement\n1.\n2.\n3.\n4.\n5.\nPlease quote application ID No. for future correspondence\nPlace:\nAuthorised Representative of Nodal Agency\nDate:\nSchedule IV\n[See rule 11]\nThe time schedule prescribed for clearances by various authorities shall be as follows:\nSerial Number\nSerial Number\nConcerned Department/Organization\nConcerned Department/Organization\nClearances required\nClearances required\nTime limit for asking additional information\nTime limit for asking additional information\nTime limit for issuing clearances\nTime limit for issuing clearances\n1.\nUttar Haryana Bijli Vitran Nigam/Dakhsin Haryana\n\t\t\t\tBijli Vitran Nigam\nRelease of electric connection (a) For loads upto\n\t\t\t\t20 Kilo Watt (b) For loads upto 70 Kilo Watt (c) For loads above\n\t\t\t\t250 Kilo Watt (d) For loads above 1MW\n7 days 7 days 7 days 7 days\n21 days* 45 days* 60 days* 60 days*\n2.\nHaryana Pollution Control Board\n(i) Issue of No Objection Certificate (ii)\n\t\t\t\tConsent of trial production other than 17 highly polluting\n\t\t\t\tindustries. (iii) Consent to operate production (iv) Permission to\n\t\t\t\tstorage/collection of Hazardous Waste (v) Renewal of consent\n3 days 7 days 7 days 7 days 5 days\n7 days 21 days 30 days 30 days 21 days\n3.\nTown and Country Planning\n(i) Change of land use in industrial zone. (ii)\n\t\t\t\tNo Objection Certificate for establishment of industrial unit\n\t\t\t\tunder the Urban Area Act. (iii) Approval of building plan.\n15 days 7 days 15 days\n30 days 15 days 30 days\n4.\nEnvironment Department\nSite clearance for 17 highly polluting\n\t\t\t\tindustries identified by Government of India.\n7 days\n60 days\n5.\nLabour Department/Chief Inspector of Factories\n(i) Approval of factory plan under the Factories\n\t\t\t\tAct, 1948 (Act 63 of 1948). (ii) Licence for running factory\n7 days 7 days\n90 days 15 days\n6.\nInspectorate of Boilers\nRegistration of boilers\n7 days\n15 days\n7.\nDirectorate of Health Services\nDrug Licence\n7 days\n30 days\n8.\nExcise and Taxation\nSales Tax registration\n7 days\n15 days\n* In case no augmentation is required\nSchedule V\n[See rule 12]\nDeemed Approvals\nDeemed Approvals\nDeemed approval shall be applicable in respect of the following clearances:\nSerial Number\nSerial Number\nDepartment/Organisation\nDepartment/Organisation\nClearances\nClearances\nTime Limit\nTime Limit\n1.\nHaryana State Pollution Control Board\nIssue of No Objection Certificate\n7 days\n2.\nTown and Country Planning/Haryana Urban Development Authority/Municipal Corporation/Municipal Council/Municipal Committee\n(i) Change of land use in industrial zone. (ii)\n\t\t\t\tNo Objection Certificate for establishment of industrial unit\n\t\t\t\tunder Urban Area Act. (iii) Approval of building plan\n30 days 15 days 30 days\n3.\nLabour Department/Chief Inspector of Factories.\n(i) Approval of factory plan under Factories\n\t\t\t\tAct, 1948. (ii) Licence for running factory.\n90 days 15 days\nSchedule VI\n[ See rule 12]\nCertificate of Deemed Clearance\nCertificate of Deemed Clearance\nDated the\nName of the Nodal Agency",
"footnote": "",
"is_definition": false,
"sort_order": 105
}
],
"metadata": {
"Act ID": "hl755",
"Act Number": "Published vide Haryana Government Notification No. 49/43/2007-41B1, dated 6th July, 2007",
"Enactment Date": "",
"Act Year": "2007",
"Short Title": "Haryana Industrial Promotion Rules, 2007",
"Type": "STATE",
"Location": "Haryana"
},
"updated_at": "2026-09-29 21:55:19"
}