6. Declaration : I hereby certify and declare that:

(a) The land on which my property exists is not covered under sub-section (1) of section 8. Also my property does not attach any dues to the Government or local bodies.
(b) For violation in the provision of sanitary facility, I abide to make the necessary provision as directed by authority in this regard.
(c) I have submitted the plans for the portion for which I wish to get the unauthorised development regularised.
(d) For that portions for which I have not submitted to regularise, I shall pull down such portions on my own.
(e) I, the under signed __________________________ registered/authorized architect/Engineer, hereby certify that, while preparing the plan for the said unauthorised development, I/we have inspected the site and accordingly the plans are prepared.
(f) The information submitted in the application and documents submitted along with are true to the best of my knowledge. Also I am aware that, if found incorrect it shall lead to criminal proceedings and accordingly action shall be taken.
Date : Registration No. (if issued)
Date :
Name and Signature of the architect/Engineer
Address /Phone number.
Name and Signature of the applicant / owner Address /Phone number.
Stamp & Signature of Notary
i. In a building having more than one unauthorised development each owner/occupier shall make a separate application for each unauthorised development.
ii. Certified copy of approved layout plan of final plot or revenue survey number or city survey number.
iii. Sanctioned layout plan duly certified by registered or authorized Architect or Engineer empanelled by the authority
iv. The plans shall be prepared according to sub-rule (1) of rule 13
v. Stability Certificate of Structural Designer in Form-D1 except for residential dwelling units having an area up to 150 sq mtr
vi. Attached details in Form- D2 and D3
vii. Copy of the demand notice for property tax
viii. Receipt of payment of the property tax.
ix. NOC of the society if applicable
x. NOC/approval required under sub rule (3 ) of rule 10.
[Annexure 1] (to be notarized not on stamp paper)
[Annexure 1] (to be notarized not on stamp paper)
I/We hereby apply for getting the unauthorised
development regularised as described in accompanying relevant
drawings along with Form D1, Form-D2 and Form-D3 .
2
Name of the Occupier/s
:
3
Occupied the property since when (Attach
documentary proof like, property tax bill of local body,
electricity bill, telephone bill, ration card etc.)
:
4
Whether Application is made for regularization
of land under section 9 of the Gujarat Regularization of
Unauthorized Development Act, 2011 (submit the copy of the
application along with particulars and documents attached). If
yes, then date of application submit the copy of the order.
Yes / No
5
Details of property tax last paid
:
Sq. mtr.
(d) Useable Area for assessment of property tax
(e) Year of assessment
(f) Use for which the assessment is done
6
Is this land/building included in a
layout/building plan sanctioned by the appropriate authority or
any other authority? If yes, date of sanction and order number
submit the copy of the approved plan
:
(a) Plot area : (sq.mtrs.) No. of units :
(b) Details of violation;
Description
Description
Unit
Unit
Actual area
Actual area
Approved or Approvable as per GDCR
Approved or Approvable as per GDCR
Violation (C-D)
Violation (C-D)
A
B
C
D
E
i.
Ground coverage
Sq.mtr.
ii.
Built up area (excluding ground coverage)
Sq.mtr.
iii.
Height of building
Mtr.
iv.
Common plot
Sq.mtr.
v.
Change of Use (other than parking)
Sq.mtr.
Note :
iii. Cases where the
building permission has been granted earlier, in such cases
details to be filled in column-D shall be as per the sanctioned
plan only for which authentic sanctioned documents shall be
enclosed which includes plans and development permission (Raja
Chitthi).
iv. In other cases the building permission has
not been granted details to be filled in column-D shall be as
approvable under prevailing GDCR.
a. I am hereby furnishing the NOC's/approvals, in respect to the following matters:
i. ______________________________________________
ii. ______________________________________________
iii. _______________________________________________
b. I shall, latest before Dt.___________ furnish the NOC's/approvals, in respect to the following matters:
i. ______________________________________________
ii. ______________________________________________
iii. _______________________________________________
(a) The land on which my property exists is not covered under sub-section (1) of section 8. Also my property does not attach any dues to the Government or local bodies.
(b) For violation in the provision of sanitary facility, I abide to make the necessary provision as directed by authority in this regard.
(c) I have submitted the plans for the portion for which I wish to get the unauthorised development regularised.
(d) For that portions for which I have not submitted to regularise, I shall pull down such portions on my own.
(e) I, the under signed __________________________ registered/authorized architect/Engineer, hereby certify that, while preparing the plan for the said unauthorised development, I/we have inspected the site and accordingly the plans are prepared.
(f) The information submitted in the application and .documents submitted along with are true to the best of my knowledge. Also I am aware that, if found incorrect it shall lead to criminal proceedings and accordingly action shall be taken.
Date : Registration No. (if issued)
Date :
Name and Signature of the architect/Engineer Address /Phone number.
Name and Signature of the applicant / owner Address /Phone number.
Stamp & Signature of Notary
i. In a building having more than one unauthorised development each owner/occupier shall make a separate application for each unauthorised development.
ii. Certified copy of approved layout plan of final plot or revenue survey number or city survey number.
iii. Sanctioned layout plan duly certified by registered or authorized Architect or Engineer empanelled by the authority
iv. The plans shall be prepared according to sub-rule (1) of rule 13
v. Stability Certificate of Structural Designer in Form-D1 except for residential dwelling units having an area up to 150 sq mtr
vi. Attached details in Form- D2 and D3
vii. Copy of the demand notice for property tax
viii. Receipt of payment of the property tax.
ix. NOC of the society if applicable
x. NOC/approval required under sub rule (3 ) of rule 10.
[Annexure 1] (to be notarized not on stamp paper)
[Annexure 1] (to be notarized not on stamp paper)
I/We hereby apply for getting the unauthorised
development regularised as described in accompanying relevant
drawings along with the certificate in Form D for structural
stability and Form-G
1
Name of the owner/s ( Attach documentary proof
like the extract from the Property Register for city survey lands
or an extract from the Record of Rights for Revenue lands or the
copy of the index of registered sale deed as the case may be)
:
2
Occupied the property since when (Attach
documentary proof like, property tax bill of local body,
electricity bill, telephone bill, ration card etc.)
:
3
Details of property tax last paid
:
Sq. Mtrs.
(g) Useable Area for assessment of property tax
:
(h) Year of assessment
:
(i) Use for which the assessment is done
:
4
Is this land/building included in a
layout/building plan sanctioned by the appropriate authority or
any other authority? If yes, date of sanction and order number
submit the copy of the approved plan
:
(a) Plot area : (sq.mtrs.) No. of units :
(b) Details of violation;
Description
Description
Unit
Unit
Actual area
Actual area
Approved or Approvable as per GDCR
Approved or Approvable as per GDCR
Violation (C-D)
Violation (C-D)
A
B
C
D
E
i.
Ground coverage
Sq.mtr.
ii.
Built up area (excluding ground coverage)
Sq.mtr.
iii.
Height of building
Mtr.
iv.
Common plot
Sq.mtr.
v.
Change of Use (other than parking)
Sq.mtr.
Note :
Note :
i. Cases where the
building permission has been granted earlier, in such cases
details to be filled in column-D shall be as per the sanctioned
plan only for which authentic sanctioned documents shall be
enclosed which includes plans and development permission (Raja
Chitthi).
ii. In other cases the building permission has
not been granted details to be filled in column-D shall be as
approvable under prevailing GDCR.
(c) Details of violation of parking;
Sr No.
Sr No.
Description
Description
Unit
Unit
Actual area
Actual area
Required as per GDCR
Required as per GDCR
Deficit area (E-D)
Deficit area (E-D)
A
B
C
D
E
F
1
Parking Space
Sq.mtr.
i. I hereby submit that
a. I shall not be able to provide space for deficit parking in the unauthorised development or within 500 mtrs distance from the said unauthorised development.
or
b. I hereby declare that, I would provide __________ sq.mtrs. of deficit parking space at _________________________________ location for which the plans are enclosed herewith. The said location is located at ______ mtrs. Distance from the said unauthorised development and this location is within 500 mtrs
ii. For violation in the provision of sanitary facility, I abide to make the necessary provision as directed by authority in this regard.
iii. I hereby declared that, the space where I propose to provide deficit parking is not in possession with /use/ beneficiary to any other person. Also in future I shall not sale or part with any other person or beneficiary in any manner which shall violate the purpose of providing deficit parking.
a. I am hereby furnishing the NOC's/approvals, in respect to the following matters:
i. ______________________________________________
ii. ______________________________________________
iii. _______________________________________________
b. I shall, latest before Dated___________ furnish the NOC's/approvals, in respect to the following matters:
i. ______________________________________________
ii. ______________________________________________
iii. _______________________________________________
(a) The land on which my property exists is not covered under sub-section (1) of section 8. Also my property does not attach any dues to the Government or local bodies.
(b) For violation in the provision of sanitary facility, I abide to make the necessary provision as directed by authority in this regard.
(c) I have submitted the plans for the portion for which I wish to get the unauthorised development regularised.
(d) For that portions for which I have not submitted to regularise, I shall pull down such portions on my own.
(e) I, the under signed __________________________ registered/authorized architect/Engineer, hereby certify that, while preparing the plan for the said unauthorised development, I/we have inspected the site and accordingly the plans are prepared.
(f) The information submitted in the application and .documents submitted along with are true to the best of my knowledge. Also I am aware that, if found incorrect it shall lead to criminal proceedings and accordingly action shall be taken.
Date : Registration No. (if issued)
Date :
Name and Signature of the architect/Engineer Address /Phone number.
Name and Signature of the applicant / owner Address /Phone number.
Stamp & Signature of Notary
i. In a building having more than one unauthorised development each owner/occupier shall make a separate application for each unauthorised development.
ii. Certified copy of approved layout plan of final plot or revenue survey number or city survey number.
iii. Sanctioned layout plan duly certified by registered or authorized Architect or Engineer empanelled by the authority
iv. The plans shall be prepared according to sub-rule (1) of rule 13
v. Stability Certificate of Structural Designer in Form-D1 except for residential dwelling units having an area up to 150 sq mtr
vi. Attached details in Form- D2 and D3
vii. Copy of the demand notice for property tax
viii. Receipt of payment of the property tax.
ix. NOC of the society if applicable
x. NOC/approval required under sub rule (3 ) of rule 10.
[Annexure 1] (to be notarized not on stamp paper)
[Annexure 1] (to be notarized not on stamp paper)
Application for the regularisation of unauthorised development by: (i) the Occupier/s (other than owner whose land title is not in their name but is an occupant. ) and (ii) For unauthorised development for violations of parking and other violation
I/We hereby apply for getting the unauthorised
development regularised as described in accompanying relevant
drawings along with the certificate in Form D for structural
stability and Form-G
1
Name of the Occupier/s
:
2
Occupied the property since when (Attach
documentary proof like, property tax bill of local body,
electricity bill, telephone bill, ration card etc.)
:
3
Whether Application is made for regularization
of land under section 9 of the Gujarat Regularization of
Unauthorized Development Act, 2011 (submit the copy of the
application along with particulars and documents attached). If
yes, then date of application submit the copy of the order.
:
Yes / No
4
Details of property tax last paid:
“
Sq. mts
(a) Useable Area for assessment of property tax
(b) Year of assessment
(c) Use for which the assessment is done
5
Is this land/building included in a
layout/building plan sanctioned by the appropriate authority or
any other authority? If yes, date of sanction and order number
submit the copy of the approved plan
:
(a) Plot area : (sq.mtrs.) No. of units :
(b) Details of violation;
Description
Description
Unit
Unit
Actual area
Actual area
Approved or Approvable as per GDCR
Approved or Approvable as per GDCR
Violation (C-D)
Violation (C-D)
A
B
C
D
E
i.
Ground coverage
Sq.mtr.
ii.
Built up area (excluding ground coverage)
Sq.mtr.
iii.
Height of building
Mtr.
iv.
Common plot
Sq.mtr.
v.
Change of Use (other than parking)
Sq.mtr.
Note :
i. Cases where the
building permission has been granted earlier, in such cases
details to be filled in column-D shall be as per the sanctioned
plan only for which authentic sanctioned documents shall be
enclosed which includes plans and development permission (Raja
Chitthi).
ii. In other cases the building permission has
not been granted details to be filled in column-D shall be as
approvable under prevailing GDCR.
(c) Details of violation of parking;
Sr No.
Sr No.
Description
Description
Unit
Unit
Actual area
Actual area
Required as per GDCR
Required as per GDCR
Deficit area (E-D)
Deficit area (E-D)
A
B
C
D
E
F
1
Parking Space
Sq.mtr.
i. I hereby submit that
a. I shall not be able to provide space for deficit parking in the unauthorised development or within 500 mtrs distance from the said unauthorised development.
or
b. I hereby declare that, I would provide __________ sq.mtrs. of deficit parking space at _________________________________ location for which the plans are enclosed herewith. The said location is located at ______ mtrs. Distance from the said unauthorised development and this location is within 500 mtrs ii. For violation in the provision of sanitary facility, I abide to make the necessary provision as directed by authority in this regard.
iii. I hereby declared that, the space where I propose to provide deficit parking is not in possession with /use/ beneficiary to any other person. Also in future I shall not sale or part with any other person or beneficiary in any manner which shall violate the purpose of providing deficit parking.
a. I am hereby furnishing the NOC's/approvals, in respect to the following matters:
i. ______________________________________________
ii. ______________________________________________
iii. _______________________________________________
b. I shall, latest before Dt.___________ furnish the NOC's/approvals, in respect to the following matters:
i. ______________________________________________
ii. ______________________________________________
iii. _______________________________________________
(a) The land on which my property exists is not covered under sub-section (1) of section 8. Also my property does not attach any dues to the Government or local bodies.
(b) For violation in the provision of sanitary facility, I abide to make the necessary provision as directed by authority in this regard.
(c) I have submitted the plans for the portion for which I wish to get the unauthorised development regularised.
(d) For that portions for which I have not submitted to regularise, I shall pull down such portions on my own.
(e) I, the under signed __________________________ registered/authorized architect/Engineer, hereby certify that, while preparing the plan for the said unauthorised development, I/we have inspected the site and accordingly the plans are prepared.
(f) The information submitted in the application and .documents submitted along with are true to the best of my knowledge. Also I am aware that, if found incorrect it shall lead to criminal proceedings and accordingly action shall be taken.
Date : Registration No. (if issued)
Date :
Name and Signature of the architect/Engineer Address /Phone number.
Name and Signature of the applicant / owner Address /Phone number.
i. In a building having more than one unauthorised development each owner/occupier shall make a separate application for each unauthorised development.
ii. Certified copy of approved layout plan of final plot or revenue survey number or city survey number.
iii. Sanctioned layout plan duly certified by registered or authorized Architect or Engineer empanelled by the authority
iv. The plans shall be prepared according to sub-rule (1) of rule 13
v. Stability Certificate of Structural Designer in Form-D1 except for residential dwelling units having an area up to 150 sq mtr
vi. Attached details in Form- D2 and D3
vii. Copy of the demand notice for property tax
viii. Receipt of payment of the property tax.
ix. NOC of the society if applicable
x. NOC/approval required under sub rule (3 ) of rule 10.
Form-C1
Form-C1
Notice to all the owners or occupants to pay fees in case of regularisation of in matters other than parking space and sanitary facilities
Notice to all the owners or occupants to pay fees in case of regularisation of in matters other than parking space and sanitary facilities
Description
Description
Area Sq.Mt.
Area Sq.Mt.
Rate Rs./Sq.Mt.
Rate Rs./Sq.Mt.
Amount in Rs.
Amount in Rs.
(a) Ground Coverage,
(b) Built up area,
(c) Height of building,
(d) Change of use
Total
Signature of the Authorised Officer Area/Urban Development Authority Municipal Corporation
Form-C-2
Form-C-2
Notice to all the owners or occupants to pay fees in case of case of regularisation of all the matters including parking space and sanitary facilities
Notice to all the owners or occupants to pay fees in case of case of regularisation of all the matters including parking space and sanitary facilities
Description
Description
Area Sq.Mt.
Area Sq.Mt.
Rate Rs./Sq.Mt.
Rate Rs./Sq.Mt.
Amount in Rs.
Amount in Rs.
(a) Ground Coverage,
(b) Built up area,
(c) Height of building,
(d) Change of use
(e) Parking (amount as decided by the designed
authority)
Total
Signature of the Authorised Officer Area/Urban Development Authority Municipal Corporation
Form-"C-3"
Form-"C-3"
Notice in cases where Unauthorized Development is carried out in parking space and sanitary facilities
Notice in cases where Unauthorized Development is carried out in parking space and sanitary facilities
(1) You are hereby directed to provide necessary parking space and sanitary facility in the location of the unauthorised development and to intimate to the designated authority within fifteen days from the date of receipt of this notice.
(2) If it is not feasible to provide such parking facilities within the location it may be provided within a distance of 500 meters from the unauthorised development within a period of six months from the date of receipt of this notice.
(3) On regularisation of the unauthorised development, if additional sanitary facilities is required then the existing facilities in the building should be augmented or imporved within the building having the unauthorised development. Such action should be taken within a period of six months from the date of receipt of this notice.
Signature of the Authorised Officer Area/Urban Development Authority Municipal Corporation
Form-"D1"
Form-"D1"
Certificate of Structural Stability
Certificate of Structural Stability
(not required in case of independent residential development having dwelling unit area less than 150 sqmts)
(not required in case of independent residential development having dwelling unit area less than 150 sqmts)
(Title of Project)
Signature of the Owner /Occupier +with
date__________
Signature of the Structural Engineer with
date________
Name in Block Letters______________________
Name in Block Letters______________________
Address _____________________________________
Address ____________________________________
Signature of the Architect with date________
Name in Block Letters__________________
Address ________________________________________
+ strike out which is not
applicable.....................
Form-"D2"
Form-"D2"
Certificate of Fire Safety Compliance
Certificate of Fire Safety Compliance
(Title of Project)
Signature of the Owner /Occupier +with
date__________
Signature of the Structural Engineer with
date________
Name in Block Letters______________________
Name in Block Letters______________________
Address _____________________________________
Address ____________________________________
Signature of the Architect with date________
Name in Block Letters__________________
Address ________________________________________
+ strike out which is not
applicable.....................
Form-D3 (notarized on stamp paper)
Form-D3 (notarized on stamp paper)
Undertaking
Undertaking
(Title of Project)
Signature of the Owner /Occupier +with
date__________
Signature of the Structural Engineer with
date________
Name in Block Letters______________________
Name in Block Letters______________________
Address _____________________________________
Address ____________________________________
Signature of the Architect with date________
Name in Block Letters__________________
Address ________________________________________
+ strike out which is not
applicable.....................
Form-"E"
Form-"E"
Order of Regularisation
Order of Regularisation
a. __________________________________________________________________,
b. __________________________________________________________________,
Description of unauthorised Development
Description of unauthorised Development
Area in Sq. meter
Area in Sq. meter
(a)
Ground Coverage
(b)
Built up area
(c)
Height of building
(d)
Change of use from _____use to _____use)
(e)
Deficit Parking space
(f)
Deficit sanitary facility
Signature of the Authorised Officer Area/Urban Development Authority Municipal Corporation
Form-"F"
Form-"F"
Order to refuse to regularise
Order to refuse to regularise
a. ____________________________________________________________________________
b. ____________________________________________________________________________
c. ____________________________________________________________________________
d. ____________________________________________________________________________
Signature of the Authorised Officer Area/Urban Development Authority Municipal Corporation
Schedule-I
A. Municipal Corporation
A. Municipal Corporation