(a) quarry permits for extraction of minor minerals not exceeding twenty thousand metric tonnes for a period of up to ninety days shall be granted by the District Collector:
(b) the depth of the pit below the surface shall not exceed six metres:
(c) the mineral shall be used for the specific purpose for which quarry permit is granted;
(d) the holder of a quarry permit shall commence quarrying operations in accordance with the approved mining plan and after obtaining all applicable environmental clearances for the area; and
(e) the holder of a quarry permit shall comply with all laws, rules, regulations, notifications, orders and the like, as may be applicable to the activities undertaken pursuant to a quarry permit.
(a) the time-limit, mode and place of payment of rents and royalties;
(b) the compensation for damage to land for which the quarry permit is granted;
(c) the felling of trees;
(d) entering and working in any reserved or protected forest;
(e) reporting of all accidents;
(f) indemnity to Government against claims of third parties;
(g) the period within which the minor mineral shall be extracted and removed;
(h) forfeiture of property left on the land for which the quarry permit is granted after cancellation of the permit; and
(i) plugging of bore holes and filling up or fencing all excavations in the land for which the quarry permit was granted, on the expiry or cancellation of the permit.
Chapter V
Exemptions
Section 23 • Gujarat Minor Mineral Concession Rules, 2017
23. Conditions on which the quarry permit shall be granted.
gujarat-minor-mineral-concession-rules-2017-sec-23.json
•
Section 23
{
"act_title": "Gujarat Minor Mineral Concession Rules, 2017",
"act_slug": "gujarat-minor-mineral-concession-rules-2017",
"section_label": "Section",
"section": {
"number": "23",
"title": "23. Conditions on which the quarry permit shall be granted.",
"chapter": null,
"content": "(a) quarry permits for extraction of minor minerals not exceeding twenty thousand metric tonnes for a period of up to ninety days shall be granted by the District Collector:\n(b) the depth of the pit below the surface shall not exceed six metres:\n(c) the mineral shall be used for the specific purpose for which quarry permit is granted;\n(d) the holder of a quarry permit shall commence quarrying operations in accordance with the approved mining plan and after obtaining all applicable environmental clearances for the area; and\n(e) the holder of a quarry permit shall comply with all laws, rules, regulations, notifications, orders and the like, as may be applicable to the activities undertaken pursuant to a quarry permit.\n(a) the time-limit, mode and place of payment of rents and royalties;\n(b) the compensation for damage to land for which the quarry permit is granted;\n(c) the felling of trees;\n(d) entering and working in any reserved or protected forest;\n(e) reporting of all accidents;\n(f) indemnity to Government against claims of third parties;\n(g) the period within which the minor mineral shall be extracted and removed;\n(h) forfeiture of property left on the land for which the quarry permit is granted after cancellation of the permit; and\n(i) plugging of bore holes and filling up or fencing all excavations in the land for which the quarry permit was granted, on the expiry or cancellation of the permit.\nChapter V\nExemptions",
"footnote": "",
"is_definition": false,
"sort_order": 22
},
"prev_section": "22",
"next_section": "24"
}