8. Miscellaneous Charges.

(ii) All the charges proposed below in 8.1 and 8.2 are payable in advance.
8.1 Pre-Service Connection Charges
A. Registration Charges (Non Refundable) : - The following registration charges would apply to new service connection:
A. Registration Charges (Non Refundable) :
Sr. No.
Sr. No.
Particulars
Particulars
Charges
Charges
i
Single phase supply for Residential.
Rs.40.00
ii
Three phase supply for Residential.
Rs.100.00
iii
Single phase supply and Three phase supply for
commercial
Rs.100.00
iv
Three phase supply for LT Agricultural
Rs.200.00
v
Three phase supply for LT Industrial
Rs.400.00
vi
HT and EHT supply (Applicable to demand applied
for)
Rs.10 per KVA with a ceiling of Rs.25000.00
vii
All other Categories not enumerated above
Rs.100.00
Note. - Above registration charges would also apply to temporary supplies
Note.
B. Re-Estimate Charges. - Any revision in the estimate done at the instance of the consumer shall attract extra charges as under:
B. Re-Estimate Charges.
Sr. No.
Sr. No.
Particulars
Particulars
Charges
Charges
(i)
LT services
Rs. 20/-
(ii)
HT and EHT services
Rs. 200/-
C. Test Report Charge For All Categories Rs. 20/-
C. Test Report Charge For All Categories Rs. 20/-
D. Testing of Installations.
D. Testing of Installations.
(i)
The test and inspection prior to connection of an installation for permanent supply shall be carried out free of charge but should further test and inspection be found necessary, the charge for such test and/or inspection shall be
Rs. 50/-
(ii)
Charges for the initial inspection and subsequent test and connection of a temporary installation
Rs. 100/-
8.2 Post Service Connection Charges
A. Registration Charges (Non-Refundable) - The following registration charges would apply to addition/ reduction of load and also to cases where a consumer applies for shifting of the connection in the same premises.
A. Registration Charges (Non-Refundable)
Sr. No.
Sr. No.
Particulars
Particulars
Charges
Charges
i
Single phase supply for Residential.
Rs.40.00
ii
Three phase supply for Residential.
Rs.100.00
iii
Single phase supply and Three phase supply for
commercial
Rs.100.00
iv
Three phase supply for LT Agricultural
Rs.200.00
v
Three phase supply for LT Industrial
Rs.400.00
vi
HT and EHT supply (Applicable to demand applied
for)
Rs.10 per KVA with a ceiling of Rs. 25000.00
vii
All other Categories not enumerated above
Rs.100.00
viii
Reduction in demand of HT and EHT supply
Rs. 10 per KVA (Applicable to quantum of demand reduced) with a ceiling of Rs.2000
Note. - Above registration charges would also apply to temporary supplies
Note.
B. Registration Charges for Change of Name and Transfer of Agreement. - The application for change of name of existing service and transfer of benefits of agreement executed by the consumer with the supplier for power supply shall be accompanied by non-refundable registration charges as specified below:
B. Registration Charges for Change of Name and Transfer of Agreement.
Sr. No.
Sr. No.
Particulars
Particulars
Charges
Charges
i
Single phase supply for Residential.
Rs.20.00
ii
Single phase supply for commercial and Three
phase supply for Residential
Rs.100.00
iii
Three phase supply for LT Agricultural
Rs.300.00
iv
Three phase supply for LT Industrial and others
Rs.400.00
v
HT and EHT supply
Rs.2000.00
C. Reconnection / Disconnection Charges
C. Reconnection / Disconnection Charges
Reconnection Charges:
Reconnection Charges:
Sr No.
Sr No.
Particulars
Particulars
Charges
Charges
i
Residential
Rs. 100.00
ii
Commercial
Rs. 200.00
iii
LT Agricultural
Rs. 200.00
iv
LT Industrial & others
Rs. 900.00
v
HT and EHT supply
Rs. 3200.00
Note. - If the staff of the supplier is unable to obtain access to the meter or service cut-outs for disconnecting, and the disconnection has to be made from the mains, either underground or overhead, the consumer shall have to pay all costs incidental to such disconnection and reconnection
Note.
Disconnection At Consumer Request.
Disconnection At Consumer Request.
Sr. No.
Sr. No.
Particulars
Particulars
Charges
Charges
i
Residential
50.00
ii
Commercial
100.00
iii
LT Agricultural
100.00
iv
LT Industrial & others
500.00
v
HT and EHT supply
1500.00
D. Meter Charges:
D. Meter Charges:
For Permanent Supply:
For Permanent Supply:
Sr. No.
Sr. No.
Particulars
Particulars
Charges
Charges
1.
Hire of single-phase meter
Rs. 10/- per meter/ month.
2.
Hire of Three phase meter
Rs. 30/- per meter/ month
3.
Hire of demand meter or special type of meter
for LT consumer
Rs. 225/- per meter/ month.
4.
Hire of time switch with or without KWH meter
Rs. 225/- per time switch /month.
5.
Hire of HT/EHT metering equipments
Rs. 750/- per meter/ month.
For Temporary Supply:
For Temporary Supply:
Sr. No
Sr. No
Particulars
Particulars
Charges
Charges
1
Hire of single-phase meter
Rs. 15/- per meter/ month.
2
Hire of poly phase meter (3 phase)
Rs. 60/- per meter/ month
3
Hire of HT/EHT metering equipments
Rs.1500/- per meter/ month.
Note. - For the first month of service connection, the meter charge will be proportionate to the number of days in the month for which electricity is supplied. For the month in which the meter is removed on or after disconnection of a service and/or installed afresh on reconnection, the meter charge will be proportionate to the number of days in the month during which the meter remains on the premises of the consumer. Such proportionate charges will be rounded to the nearest 50 Ps.
Note.
E. Other Charges
E. Other Charges
Particulars
Particulars
Charges
Charges
(a) Charges for attendance of fuseman where the
failure of supply is due to a fault in the consumer's
installation
(1) For Low Tension
consumers Rs. 10/-
(2) For High Tension consumers Rs. 10/- for
replacement of fuse on single phase. Rs. 15/- for replacement of
fuse on two phases. Rs.20/- for replacement of fuse on three
phases.
(b) Charges for attendance of fuseman at
consumer's premises during any function: (per person per shift)
Rs. 500/-
(c) Charges for resealing of seals other than
meter seals which have been disturbed unauthorizedly Rs. 100/-
(d) Charges for
resealing of meter seals, disturbed Unauthourizedly
(i) In case of residential service
(ii) In case of service other than residential
Rs. 50/-
Rs. 200/-
(e) Changing or moving a meter board
Actual cost plus 15%
(f) Testing meter(all
type of meters), if it should be proved to be correct within the
limits laid down by the Standards/Rules
(i) Single phase meter
(ii) Three phase meter
(iii) Maximum Demand meter (LT)
(iv) Maximum Demand meter (HT/EHT)
Rs.100/-
Rs.300/-
Rs.500/-
Rs.1000/-
Note. - The supplier shall not accept any
responsibility whatsoever for the satisfactory and correct
running of the consumer's meter after he has taken delivery
thereof subsequent to the test.
Note.
(g) Installing a meter for each other class of
supply required after the initial connection of the installation
for any other purpose or changing a meter for one of a different
size when necessitated by a change in consumer's demand (the fee
does not include the provision of a meter board) per meter
Rs. 100/-
(h) CT/PT Testing
charges
(i) CT Testing (LT)
(ii) CT/PT unit (HT/EHT)
Rs. 100/-
Rs. 100/-
Rs. 500/-
F. Charges For Miscellaneous Work. - The charges payable in advance for any work which the supplier may undertake for the consumer and which is not included in the foregoing schedule shall be at the actual cost of labour and materials plus 15% to cover overhead charges. Estimates will be submitted when necessary. The charges payable in advance for any work which the supplier may undertake on behalf of the consumer as an agency work, shall be the actual cost of labour and materials plus 15% to cover overhead charges. The estimates will be submitted accordingly.
F. Charges For Miscellaneous Work.