LLM Advocates Logo
LLM Advocates
HOME
CATEGORIES ▼
Criminal Law & Security Civil Law, Property & Contracts Constitutional, Administrative & Welfare Laws Intellectual Property Rights (IPR) Technology, Cyber & Media Laws Corporate, Commercial & Economic Laws Labour & Employment Law Taxation & Finance Laws Environmental & Wildlife Laws Family & Personal Laws Transport, Infrastructure & Energy Health, Medicine & Food
A-Z INDEX
HOME A-Z INDEX

CATEGORIES

Criminal Law & Security Civil Law, Property & Contracts Constitutional, Administrative & Welfare Laws Intellectual Property Rights (IPR) Technology, Cyber & Media Laws Corporate, Commercial & Economic Laws Labour & Employment Law Taxation & Finance Laws Environmental & Wildlife Laws Family & Personal Laws Transport, Infrastructure & Energy Health, Medicine & Food
← Back to Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) Regulations, 2013
Section 4 • Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) Regulations, 2013

4. System planning code. - This , section specifies the technical and design criteria and the procedures to be applied by the State Transmission Utility and other users for planning and development of the power system.

← Previous Section Section 3: 3. Management of Grid Code and role of various organizations. - The Grid Code is a live document and has to be periodically reviewed by a competent panel, as and when required, in the light of experience gained. This section formulates the procedures for the same. ☰ Next Section Section 5: 5. Connectivity Conditions. - This section specifies the technical criteria and standards to be complied with by STU, transmission licensees, the generating companies, distribution licensees and other users connected or seeking connection to the transmission system. →
gujarat-electricity-regulatory-commission-gujarat-electricity-grid-code-regulations-2013-sec-4.json • Section 4
API ↗
{
    "act_title": "Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) Regulations, 2013",
    "act_slug": "gujarat-electricity-regulatory-commission-gujarat-electricity-grid-code-regulations-2013",
    "section_label": "Section",
    "section": {
        "number": "4",
        "title": "4. System planning code. - This , section specifies the technical and design criteria and the procedures to be applied by the State Transmission Utility and other users for planning and development of the power system.",
        "chapter": null,
        "content": "",
        "footnote": "",
        "is_definition": false,
        "sort_order": 5
    },
    "prev_section": "3",
    "next_section": "5"
}

Ready to Discuss Your Case?

GET STARTED
© 2026 LLM Advocates. All rights reserved.
RESOURCES ABOUT BLOGS FAQ CONTACT PRIVACY POLICY TERMS