a. Direct axis T'd
b. Quadrature axis T'q
Section 35 • Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) Regulations, 2013
35. Transient S-C time constant (in second)
gujarat-electricity-regulatory-commission-gujarat-electricity-grid-code-regulations-2013-sec-35.json
•
Section 35
{
"act_title": "Gujarat Electricity Regulatory Commission (Gujarat Electricity Grid Code) Regulations, 2013",
"act_slug": "gujarat-electricity-regulatory-commission-gujarat-electricity-grid-code-regulations-2013",
"section_label": "Section",
"section": {
"number": "35",
"title": "35. Transient S-C time constant (in second)",
"chapter": null,
"content": "a. Direct axis T'd\nb. Quadrature axis T'q",
"footnote": "",
"is_definition": false,
"sort_order": 95
},
"prev_section": "34",
"next_section": "36"
}