16. De-pooling of Deviation charges.

(a) In proportion to available capacity of each generator,
(b) In proportion to energy generated in each time block by each generator,
(c) In proportion to absolute error of Individual generator schedule.
(d) Any other methodology/criteria mutually agreed between QCA and generators.