(a) In proportion to available capacity of each generator,
(b) In proportion to energy generated in each time block by each generator,
(c) In proportion to absolute error of Individual generator schedule.
(d) Any other methodology/criteria mutually agreed between QCA and generators.
Section 16 • Gujarat Electricity Regulatory' Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019
16. De-pooling of Deviation charges.
gujarat-electricity-regulatory-commission-forecasting-scheduling-deviation-settlement-and-related-matters-of-solar-and-wind-generation-sources-regulations-2019-sec-16.json
•
Section 16
{
"act_title": "Gujarat Electricity Regulatory' Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019",
"act_slug": "gujarat-electricity-regulatory-commission-forecasting-scheduling-deviation-settlement-and-related-matters-of-solar-and-wind-generation-sources-regulations-2019",
"section_label": "Section",
"section": {
"number": "16",
"title": "16. De-pooling of Deviation charges.",
"chapter": null,
"content": "(a) In proportion to available capacity of each generator,\n(b) In proportion to energy generated in each time block by each generator,\n(c) In proportion to absolute error of Individual generator schedule.\n(d) Any other methodology/criteria mutually agreed between QCA and generators.",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
"prev_section": "15",
"next_section": "17"
}