(a) Access to the QCAs to modem installed on existing ABT meters for getting data on 15 minutes basis, or
(b) Permit access to the API link for getting the data from the meter to the QCA's central server to facilitate better forecasting.
(c) Alternatively, allow the QCA to install additional meters on the existing CT/PT to facilitate acquisition of real time data so that best schedule can be submitted to SLDC.
Section 11 • Gujarat Electricity Regulatory' Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019
11. Access to Meters.
gujarat-electricity-regulatory-commission-forecasting-scheduling-deviation-settlement-and-related-matters-of-solar-and-wind-generation-sources-regulations-2019-sec-11.json
•
Section 11
{
"act_title": "Gujarat Electricity Regulatory' Commission (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019",
"act_slug": "gujarat-electricity-regulatory-commission-forecasting-scheduling-deviation-settlement-and-related-matters-of-solar-and-wind-generation-sources-regulations-2019",
"section_label": "Section",
"section": {
"number": "11",
"title": "11. Access to Meters.",
"chapter": null,
"content": "(a) Access to the QCAs to modem installed on existing ABT meters for getting data on 15 minutes basis, or\n(b) Permit access to the API link for getting the data from the meter to the QCA's central server to facilitate better forecasting.\n(c) Alternatively, allow the QCA to install additional meters on the existing CT/PT to facilitate acquisition of real time data so that best schedule can be submitted to SLDC.",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
"prev_section": "10",
"next_section": "12"
}