← Back to Directory

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2015

Gujarat Electricity Regulatory Commission (Electricity Supply Code and Related Matters) Regulations, 2015

Raw JSON API

Sections

1. Short Title, Scope Extent And Commencement.

Section 1

2. Definitions and Interpretation.

Section 2

3. System of Supply and Classification of Consumers.

Section 3

4. Procedure For Release of New Connection and Modification in Existing Connection.

Section 4

5. Apparatus Within Consumer's Premises.

Section 5

6. Metering and Billing.

Section 6

8. Disconnection And Reconnection.

Section 8

1. Proof of ownership of the premises

Section 1

2. A map indicating the proposed location of the plant/ office and the point where supply is required. The map should also clearly show all the boundary of the premises, the public road/s (with name/s of the road/s) inside and outside of the premises/ land, roads, lands, roads belonging to outside agency innerving the premises, if any.

Section 2

3. License/ NOC from statutory authority, if required or a declaration by the applicant that his connection does not fall under the requirement of NOC under any statue.

Section 3

4. In case of a proprietary firm, an affidavit to be submitted stating that the applicant is the sole proprietor of the firm.

Section 4

5. In case of partnership firm, partnership deed.

Section 5

6. In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.

Section 6

7. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the licensee immediately.

Section 7

8. Letter of intent for production/ enhancement in production may be furnished.

Section 8

9. List of equipments proposed to be installed along with the expected load.

Section 9

10. Resolution for authorized signatory.

Section 10

11. Registration from Industries Department.

Section 11

12. Extract of project report relevant to power and process requirements ( in case of industries)

Section 12

13. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with the agreement after completion of formalities.

Section 13

1. The assessment formula for calculation of the consumption due to theft of electricity shall be as under:

Section 1