(a) area proposed to be covered under the Scheme;
(b) the work or works to be executed;
(c) the phasing of the Scheme, both area-wise and work-wise;
(d) the sketch plan of the area proposed to be covered under the Scheme;
(e) the reallocation or the realignment, if any, of a pipe outlet or the existing "irrigation" system;
(f) the survey numbers covered;
(g) field boundaries as existing and as proposed;
(h) the compensation to be given to or recovered from the land-holders or Water Distribution Co-operative Societies, as the case may be;
(i) the cost involved in the Scheme as well as in each phase thereof;
(j) the charges or dues to be levied on the beneficiaries; and
(k) such other matters and particulars as may be prescribed.
Section 16 • The Goa Command Area Development Act, 1997
16. Preparation of the Schemes.
goa-command-area-development-act-1997-sec-16.json
•
Section 16
{
"act_title": "The Goa Command Area Development Act, 1997",
"act_slug": "goa-command-area-development-act-1997",
"section_label": "Section",
"section": {
"number": "16",
"title": "16. Preparation of the Schemes.",
"chapter": null,
"content": "(a) area proposed to be covered under the Scheme;\n(b) the work or works to be executed;\n(c) the phasing of the Scheme, both area-wise and work-wise;\n(d) the sketch plan of the area proposed to be covered under the Scheme;\n(e) the reallocation or the realignment, if any, of a pipe outlet or the existing \"irrigation\" system;\n(f) the survey numbers covered;\n(g) field boundaries as existing and as proposed;\n(h) the compensation to be given to or recovered from the land-holders or Water Distribution Co-operative Societies, as the case may be;\n(i) the cost involved in the Scheme as well as in each phase thereof;\n(j) the charges or dues to be levied on the beneficiaries; and\n(k) such other matters and particulars as may be prescribed.",
"footnote": "",
"is_definition": false,
"sort_order": 15
},
"prev_section": "15",
"next_section": "17"
}