(i) method of assessment of the electricity charges payable in case of theft of electricity pending adjudication by the appropriate Court;
(ii) disconnection of supply of electricity and removing the meter, electric line, electric plant and other apparatus in case of theft or unauthorised use of electricity; and
(iii) measures to prevent diversion of electricity, theft or unauthorized use of electricity or tampering, distress or damage to electrical plant, electric lines or meter.
Section 2 • Electricity (Removal of Difficulties) Order, 2005
2. Inclusion of measures to control theft in Electricity Supply Code.
electricity-removal-of-difficulties-order-2005-sec-2.json
•
Section 2
{
"act_title": "Electricity (Removal of Difficulties) Order, 2005",
"act_slug": "electricity-removal-of-difficulties-order-2005",
"section_label": "Section",
"section": {
"number": "2",
"title": "2. Inclusion of measures to control theft in Electricity Supply Code.",
"chapter": null,
"content": "(i) method of assessment of the electricity charges payable in case of theft of electricity pending adjudication by the appropriate Court;\n(ii) disconnection of supply of electricity and removing the meter, electric line, electric plant and other apparatus in case of theft or unauthorised use of electricity; and\n(iii) measures to prevent diversion of electricity, theft or unauthorized use of electricity or tampering, distress or damage to electrical plant, electric lines or meter.",
"footnote": "",
"is_definition": false,
"sort_order": 1
},
"prev_section": "1",
"next_section": null
}