(a) the proposed river-works will prejudice the prospects for the best ultimate development of the river or its tributaries for power generation, consistent with the requirements of drinking water, irrigation, navigation, flood-control, or other public purposes, and for this purpose the Authority shall satisfy itself, after consultation with the State Government, the Central Government, or such other agencies as it may deem appropriate, that an adequate study has been made of the optimum location of dams and other river-works;
(b) the proposed scheme meets the norms regarding dam design and safety.
Section 8 • The Electricity Act, 2003
8. Hydro-electric generation
electricity-act-2003-rajasthan-sec-8.json
•
Section 8
{
"act_title": "The Electricity Act, 2003",
"act_slug": "electricity-act-2003-rajasthan",
"section_label": "Section",
"section": {
"number": "8",
"title": "8. Hydro-electric generation",
"chapter": null,
"content": "(a) the proposed river-works will prejudice the prospects for the best ultimate development of the river or its tributaries for power generation, consistent with the requirements of drinking water, irrigation, navigation, flood-control, or other public purposes, and for this purpose the Authority shall satisfy itself, after consultation with the State Government, the Central Government, or such other agencies as it may deem appropriate, that an adequate study has been made of the optimum location of dams and other river-works;\n(b) the proposed scheme meets the norms regarding dam design and safety.",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
"prev_section": "7",
"next_section": "9"
}