The Controller, may by
order in writing, direct the owner or occupier of a sugar factory or any other
person to furnish, within the time and in the manner specified, such returns
relating to stocks of molasses in his possession as may be specified in the order.
l[3-A. (1) The Controller may by order in writing, direct any
owner or occupier of a sugar Factory or distillery or any other person
permitted to store and preserve molasses under clause: (ia) of sub-section
(1) of section 4 to construct within such time as may be specified in the order
tanks for the storage of molasses.
(2) Where any person directed under sub-section (1) to construct tanks
fails to do so, the Controller may cause tanks to be constructed through
any other agency and recover the cost of construction from the defaulter as
arrears of land revenue].
Section 3 • The EAST PUNJAB MOLASSES (CONTROL) ACT, 1948
Section 3. Power of the Controller to ask for returns.
east-punjab-molasses-control-act-1948-sec-3.json
•
Section 3
{
"act_title": "The EAST PUNJAB MOLASSES (CONTROL) ACT, 1948",
"act_slug": "east-punjab-molasses-control-act-1948",
"section_label": "Section",
"section": {
"number": "3",
"title": "Section 3. Power of the Controller to ask for returns.",
"chapter": null,
"content": "The Controller, may by\r\norder in writing, direct the owner or occupier of a sugar factory or any other\r\nperson to furnish, within the time and in the manner specified, such returns\r\nrelating to stocks of molasses in his possession as may be specified in the order.\r\nl[3-A. (1) The Controller may by order in writing, direct any\r\nowner or occupier of a sugar Factory or distillery or any other person\r\npermitted to store and preserve molasses under clause: (ia) of sub-section\r\n(1) of section 4 to construct within such time as may be specified in the order\r\ntanks for the storage of molasses.\r\n(2) Where any person directed under sub-section (1) to construct tanks\r\nfails to do so, the Controller may cause tanks to be constructed through\r\nany other agency and recover the cost of construction from the defaulter as\r\narrears of land revenue]. ",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
"prev_section": "2",
"next_section": "4"
}