The Delhi Electricity Control Order, 1959
The Delhi Electricity Control Order, 1959
Sections
1. Short title, extent and commencement.
Section 12. Definition.
Section 24. Restriction on consumption of energy.
Section 44B. Restriction on the Installation of Connections in the name of Private Consumers in Occupation of Government Building.
Section 4B6. Consideration of Application for Supply.
Section 66A. Discontinuance of Supply of Energy Obtained by Furnishing false Information.
Section 6A7. Duties and Obligations of a Licensee.
Section 7
delhi-electricity-control-order-1959-27698.json
•
7 Sections
•
Delhi
{
"id": 27698,
"slug": "delhi-electricity-control-order-1959-27698",
"title": "The Delhi Electricity Control Order, 1959",
"short_title": "The Delhi Electricity Control Order, 1959",
"act_number": "Published vide Notification No. F.18(20) 58-EB, da",
"act_year": 1959,
"act_type": "STATE",
"location": "Delhi",
"law_status": "unknown",
"enactment_date": null,
"description": "The Delhi Electricity Control Order, 1959",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title, extent and commencement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definition.",
"chapter": null,
"content": "[3. Restriction on Supply of Energy.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "4",
"title": "4. Restriction on consumption of energy.",
"chapter": null,
"content": "(1) (a) connect load in excess of what he as lawfully entitled to consume or\n(b) alter the hours or days during which he was permitted to consume energy, on the 24th November, 1959 without the permission of the Chief Commissioner.\n(2) Transfer the load sanctioned in his name other than those specified in clause 3(2)(i), (ii) to any premises without the permission of the Chief Commissioner.\n(3) Use any load sanctioned for air-conditioning in any residential, commercial or industrial premises including shops, cinemas, hotels, restaurants and public offices, which are fitted with electric fans for such period as the Chief Commissioner may from time to time by order published in official gazette, direct.\n[(4) Use a load for purpose other than the purpose for which it was sanctioned in his favour without the permission of Administrator viz., a load sanctioned for domestic/commercial purposes shall not be sued for industrial purposes or a load sanctioned for domestic purpose shall not be used for a commercial purpose without the permission of the Administrator.]\n[(5) Notwithstanding anything contained in any contract or agreement or in the provision of a license granted under the Act, the Delhi Electric Supply Undertaking on the request of the licensee. May permit the change in the existing trade and allow to run the additional trade for which the load has been sanctioned other than obnoxious and hazardous industry without the prior approval of the Lieutenant Governor, Delhi.]\n[(6) Use any load for the purpose of:\n(a) (i) neon-signs, (ii) decorative lights, (iii) advertising, (iv) display of goods in window shops or (v) running of fountains.\n(b) decorative lights within the precincts of any petrol pump in the Union Territory of Delhi.\n(c) decorative or illumination in any marriage, festivity or any other social function :\n[(7) Notwithstanding anything contained in any contract or agreement or in the provisions of any licence granted under the Act, no consumer shall use load for the purpose of the industries on days as specified in Col. 3 of the Schedule attached to this Order except for the categories mentioned below:\n(i) Industries using powers on continuous process for their production of preservation such as cold storages etc.\n(ii) Defence installation and Government of India Presses at Delhi and New Delhi.\n(iii) Such industries as have been running continuously without observing any regular close day on the date of promulgation of the Order, such as bread manufacturing units, textiles mills, etc.\n(iv) Roller Flour Mills, and\n(v) Units which are engaged in production of Oxygen only for hospital purposes and other medical gases.\n(vi) Saw Mills exempted vide D.A letter No. F.4(48) 80-EB (Pt) dated 9.9.1980.\n(vii) Administrative Offices of the Industrial Units vide letter No. F.4(48)/10-EB dated 20.8.1980 :\n(viii) Industrial Units producing edible oils vide letter No. F.4(48)/80 EB, dated 9.9.1980.\n[(8) Notwithstanding anything contained in any contract or agreement or in the provisions of any licence granted under the Act, all L.T. and H.T, consumers shall consume at least 10% less energy in a month as compared to their average monthly consumption of energy which for the purpose of this order shall be worked out as under:\n(a) In case of consumer whose load stood energised prior to 1st December, 1970 the average monthly consumption shall be worked out on the basis of the energy consumed by them between the period 1st December, 1976 to 30th November, 1977.\n(b) In the case of consumer whose connections were energised between 1st May, 1977 and 30th November, 1977 the average monthly consumption shall be worked out on the basis of the energy consumed by them from the date of energisation to 30th November, 1977\n(c) In the case of a consumers whose connection or whose additional loads on existing connection are energised after 1st May, 1977 the average monthly consumption shall be worked out after taking into account the load factor in respect of these connections having regard to the nature of industry and the sectioned load. The assessment of load factor sail be done by the licensee and shall be binding on the consumers :\n[(9) Notwithstanding anything contained in any contract or agreement or in the provisions of any licence granted under the Act, all the consumers having sanctioned load for domestic and commercial purposes shall consume at least 10% less energy in a month as compared to the average consumption for a month in the preceding year which for the purpose of this order shall be worked out as under:\n(a) The average monthly consumption shall be worked out on the average energy consumed in the nearest corresponding billing period of the preceding year :\n(10) The Administrator may, in public interest, exempt any consumer or class of consumer form the operation of sub-clauses (7), (8) and (9) to such extent and for such period and subject to such conditions as he may think fit.]\n[(11) Notwithstanding anything contained in any contract or agreement or in the provisions of any licence granted under the Act, no consumer shall use between 6.30 pm to 10.00 pm any load for air-conditioning in any residential, commercial or industrial premises, including shops, cinemas, thereafter, offices, institutions, hotels and restaurants, except for the categories mentioned below:\n(i) Hospitals and nursing homes.\n(ii) Institutions/Establishments/Organisations using/manufacturing electronic equipments.\n(iii) Foreign Missions and International U.N. Organisations.\n(iv) Palam Airport.\n(v) Telephone Exchanges.\n(vi) Conference rooms in Government offices where ventilation cannot be provided or where international conferences are held.\n(vii) Cinemas/theatres/Restaurants/Hotels where other means of ventilation do not exist.\n(viii) Defence installations :\n[(12) Notwithstanding anything contained in any contract or agreement or in the provisions of any licence granted under the aforesaid Act, no consumer shall use load for the purpose of industries between (6.30 p.m. to 9.30 p.m.) during summer from 1st April to 30th September and 5.30 p.m. to 9 p.m. during winter from 1st October to 31st March] till further orders except for the categories mentioned below :\n(i) industries using power on continuous process for their production or preservation, such as cold storage etc.;\n(ii) defence installations and Government of India presses at Delhi and New Delhi;\n(iii) such industries as have been running continuously without observing any regular close any on the date of promulgation of this order, such as bread manufacturing units, textile mills etc.;\n(iv) roller flour mills; and\n(v) units which are engaged in production of oxygen only for hospital purposes and other medical gases.\n[(vii) Industries which are 100% Export-oriented and have been certified as such by Commissioner (Industries), Delhi Administration, Delhi] .\n[(13) [***] ]\n[4A. Restriction on Resumption of Supply of Energy.\n(i) for lighting and fans,\n(ii) for domestic appliances upto a maximum of one kW, or\n(iii) at the premises belonging to or taken on lease or requisitioned by the Government.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4B",
"title": "4B. Restriction on the Installation of Connections in the name of Private Consumers in Occupation of Government Building.",
"chapter": null,
"content": "[4C. Prohibition on the Installation of Connections in Favour of Unauthorised Occupants.\n[4D.\n5.",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "6",
"title": "6. Consideration of Application for Supply.",
"chapter": null,
"content": "[(ii) For the purpose of considering the application for the grant of power exceeding 100 kWs., the Executive Councillor (Civil Supplies) may, on the recommendation of the Secretary (Electricity), Delhi Administration sanction the load.]",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6A",
"title": "6A. Discontinuance of Supply of Energy Obtained by Furnishing false Information.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Duties and Obligations of a Licensee.",
"chapter": null,
"content": "(1) to report to the Chief Commissioner within 4 days of its coming to his notice every case of contravention of the provisions of 4 clause of this order;\n(2) under Clause 4(1)(a) of this order to discontinue the supply of energy for not more than 7 days by giving the consumer :\n(i) 48 hours' notice of his intention to do so in case of commercial or industrial load; and\n(ii) 7 days notice of his intention to do so in case of domestic load;\n(3) in the case of contravention of Clause 4(1)(b) of this Order to discontinue the supply of energy for not more than 15 days by giving the consumer 48 hours' notice of his intention to do so;\n(4) in the case of contravention of Clause 4(2) of this Order-\n(a) to discontinue the supply of energy by giving the consumer not less than 48 hours' notice of his intention to do so,\n(b) on discontinuing the supply to communicate to the Chief Commissioner within 48 hours notice of the discontinuance, circumstances in which he has done so,\n(c) on being directed by the Chief Commissioner to recommence the supply with all possibly speed;\n(5) in case of contravention of Clause 4(3) of this Order, to discontinue the supply of energy for not more than 7 days by giving the consumer 48 hours' notice of his intention to do so; and\n(6) in case of contravention of Clause 4(4) of this Order:\n(a) to discontinue the supply of energy by giving the consumer not less than 48 hours' notice of his intention to do so;\n(b) on discontinuing the supply to communicate to the Chief Commissioner within 48 hours' notice of the discontinuance, the circumstances in which he has done so; and\n(c) to comply with the directions issued by the Chief Commissioner regarding restoration of supply;\n(7) in case of contravention of the provisions of sub-clauses (6) and (8) of Clause 4, the licensee shall discontinue the supply of energy to the consumer for such period not exceeding the period specified below:\n(i) First contravention : 4 days\n(ii) Second contravention : 2 weeks\n(iii) Third contravention : to discontinue the supply for as long as the restrictions are inforced and report the matter to the Administrator :\n(8) In case of contravention of provision of sub-clause (9) of Clause 4, the licensee shall discontinue the supply of energy to the consumer for a period of 24 hours after giving him 48 hours' notice in writing of his intention for doing so :\n[(9) To discontinue supply of energy to a consumer who has failed to furnish a valid licence or No Objection/Lal Dora Certificate as may be required under the Rules in force of the local body having jurisdiction after giving 90 days' notice of his intention to do so.\n(10) To discontinue the supply of energy after giving 48 hours' notice of his intention to do so where the local body having jurisdiction has informed the licensee that some industry or trade, which cannot be carried out without their permission or Licence or 'No Objection Certificate' is being carried out in the premises of a consumer where grant of such permission or licence or No Objection Certificate is not conformity with the rules in force or where such permission or licence or no objection certificate after having been granted has been duly revoked by them :\n[(10A) To discontinue the supply of energy after giving 48 hours notice of his intention to do so where the Delhi Pollution Control Committee inform the licensee that running of specific authorised/unauthorised industry, or trade is causing pollution or is hazardous/obnoxious or creating any sort of nuisance :\n[(11) In case of contravention of the provisions of sub-clause (7) of Clause 4 the licensee shall discontinue the supply of energy to the consumer for such period not exceeding the period as specified below, after, giving him 48 hours' notice in writing of his intention to do so:\n(i) First contravention : 4 days\n(ii) Second contravention : 2 weeks\n(iii) Third contravention : to discontinue the supply for as long as the restrictions are enforced and report the matter to the Administrator :\n(12) In case of contravention of the provisions of sub-clause (11) of Clause 4, the licensee shall discontinue the supply of energy to the consumer after giving him not less than 48 hours' notice in writing of his intention to do so, for such period not exceeding the period specified below:\n(i) First contravention : 4 days\n(ii) Second contravention : 7 days\n(iii) Third contravention : To discontinue the supply and to report the matter to the Administrator and to comply with his directions regarding restoration of supply :\n(13) In case of contravention of the provisions of sub-clause (12) of Clause 4, the licensee shall discontinue the supply of energy to the consumer for such period not exceeding the period as specified below, after giving him 48 hours' notice in writing of his intention to do so :\n(i) First contravention : 4 days\n(ii) Second contravention : 2 weeks\n(iii) Third contravention : to discontinue the supply for as long as the restrictions are in force and report the matter to the Administrator.\n(14) [* * *] ]\nSchedule\nName of the Zone\nDay on which load is not be used\nBoundary line of the Zone\n(1)\n(2)\n(3)\nKarol Bagh Zone (West)\nKarol Bagh Zone (West)\nJhandewalan, Karol Bagh, Anand Parbat, Rajendra\n\t\t\t\tNagar (Old & New), Patel Nagar, Ranjeet Nagar, Shadipur,\n\t\t\t\tInderpuri, Naraina Residential & Industrial Area, Kirti Nagar\n\t\t\t\tIndustrial Area, Kirti Nagar WNS, Ramesh Nagar, Najafgarh Rd.\n\t\t\t\tIndustrial Area, Zakhira.\nMonday\nNajafgarh Drain near S.B. Mill, Ring Road, Raja\n\t\t\t\tGarden (Kirti Nagar and Moti Nagar side) Naraina Industrial Area,\n\t\t\t\tDhaula Kuan, Budha Garden Marg, Pusa Road, Crossing Link Road,\n\t\t\t\tRani Jhansi Road upto New Rohtak Road (towards Liberty side).\nShahdara Zone\nShahdara Zone\nAll trans-Jamuna Area\nTuesday\nAll area beyond Jammu River upto U.P. Border.\nSubzimandi Civil\n\t\t\t\tLine Zone\nSubzimandi Civil\n\t\t\t\tLine Zone\nCivil Lines, Subzimandi, Deli Cloth Mill, Model\n\t\t\t\tBasti, Jawahar Nagar, Roop Nagar, Kamla Nagar, Shakti Nagar,\n\t\t\t\tPratap Nagar, University Area, Kingsway Camp, Model Town,\n\t\t\t\tTimarpur, Dr. Mukerji Nagar, Gulabi Bagh Shahzada Bagh, G.T.\n\t\t\t\tKarnal Rd., Indul. Area, Ashok Vihar, Tri Nagar, New Subzimandi,\n\t\t\t\tAzadpur, Adarsh Nagar, Indra Nagar, C.C. Colony, State Bank\n\t\t\t\tColony, Vijay Nagar, Wazirpur, Bharat Nagar, Naya Mohalla,\n\t\t\t\tBeriwala Bagh, Khyber Pass, Industrial Area, Wazir Nagar\n\t\t\t\tIndustrial Area, Lawrence Road.\nWednesday & Thursday\nNajafgarh Drain starting from Inderlok Sonepat\n\t\t\t\tKamal Railway line upto Rajasthan Industrial Area, G.T. Road Area\n\t\t\t\ton both sides Bela Road frojn Wazirabad Bridge, Inter-State Bus\n\t\t\t\tTerminal, Bulward Road, Rani Jhansi Road, New Rohtak Road, Ganda\n\t\t\t\tNala (near Tri Nagar) Turning Light towards Rly. Line to Shakar\n\t\t\t\tPur Basti Rani Bagh, Ramesh Nagar, Pritampura, going beyond\n\t\t\t\twestern Jamuna Canal from Mailerpur towards G.T. Road.\nSouth Zone\nSouth Zone\nPragati Maidan, Sunder Nagar, Old Forts,\n\t\t\t\tNizamuddin, Bhogal, Jangpura, New Friends Colony, Friends Colony\n\t\t\t\tMaharani Bagh, Defence Colony, Panchsheel, Nalandi, Kilokri,\n\t\t\t\tBadarpur Sirinivaspuri, Lajpat Nagar, Hauz Khas, Kotla\n\t\t\t\tMubarakpur, Lodi, Colony, Okhla Industrial Estate Ph. I and Ph.\n\t\t\t\tII, Kalkaji, Govindpuri. Tughlaka Bagh, Khanpur, Malviya Nagar,\n\t\t\t\tMalviya Nagar Extn., Chirag Delhi, Greater Kailash I & II,\n\t\t\t\tNehru Place, Nav Jiwan Vihar, Sarvodya Enclave, Sarva Priya\n\t\t\t\tVihar, East of Kailash. Mehrauli, Mahipalpur, Green Park,\n\t\t\t\tSafdarjung Develop Area, R.K. Puram, Vasant Vihar, Shanti\n\t\t\t\tNiketan, Anand Niketan, Signal Enclose, Delhi Cantt.\nThursday & Friday\nExcept New Delhi Municipal Committee area whole\n\t\t\t\tof South Delhi including Cantonment.\nOld Delhi Zone\nOld Delhi Zone\nKashmere Gate, Chandani Chowk, Daryaganj, Jama\n\t\t\t\tMasjid, Asaf Ali Road, Mori Gate, Hauz Caji, Fetehpuri Shardha\n\t\t\t\tNand Bazar, Khari Baoli. Ajmeri Gate, Sita Ram Bazar, Chawari\n\t\t\t\tBazar, Nai Sarak, Lai Kuan, Balli Maran, Paharganj, Bara Hindu\n\t\t\t\tRao (except Delhi Cloth Mill), Pahari Dhiraj, Filmistan, Anaj\n\t\t\t\tMandi, Bahadurgarh Road, Tailiwara, Sadar Bazar, Red Fort.\nFriday & Saturday\nWhole of old walled city, Rani Jhansi Road\n\t\t\t\t(towards Filmistan side) upto Subzimandi crossing (towards Sadar\n\t\t\t\tBazar side), from Subzimandi to Qutab Road to Vasant Road,\n\t\t\t\tPunchkuin Road (Paharganj Side) Faiz Road (Pharganj side), Rank\n\t\t\t\tJhansi Road.\nNorth West Zone\nNorth West Zone\nRajouri Garden, Tilak Nagar, Tagore Garden,\n\t\t\t\tSubhash Nagar, iMayapuri Industrial Area, Janakpuri, Nangal Rai,\n\t\t\t\tHari Nagar, Vishnu Garden, Paschim Puri, Punjabi Bagh, Nagafgarh,\n\t\t\t\tNagloi, Narela.\nFriday & Saturday\nRohtak Rly. Line (near New Multan Nagar to Ring\n\t\t\t\tRoad to Rewari Rly. Line (Towards Janakpuri Side).\nNew Delhi\n\t\t\t\tMunicipal Committee Zone\nNew Delhi\n\t\t\t\tMunicipal Committee Zone\nCannaught Place, Gole Market, Baird Road,\n\t\t\t\tSarojini Nagar, Mirdard Road, Janpath, Randir Nagar, INA Market,\n\t\t\t\tLaxmi Bai Nagar Market, Netaji Nagar, Vinay Nagar, Bahadurshan\n\t\t\t\tZafar Marg\nSunday & Monday.\nPandara Road.",
"footnote": "",
"is_definition": false,
"sort_order": 6
}
],
"metadata": {
"Act ID": "dl120",
"Act Number": "Published vide Notification No. F.18(20) 58-EB, dated 23rd November, 1959",
"Enactment Date": "",
"Act Year": "1959",
"Short Title": "The Delhi Electricity Control Order, 1959",
"Type": "UNION_TERRITORY",
"Location": "Delhi"
},
"updated_at": "2026-09-29 21:55:22"
}