1. Proof of legal occupation of the premises alongwith the copy map of the premises/land, indicating proposed point of supply, duly approved by the local authority. In case of street lights the location of street light poles shall be indicated in the map.

Section 1

2. Approval/permission of the local authority, if required under any law/statute.

Section 2

3. In case of partnership firm, partnership deed.

Section 3

4. In case of a Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.

Section 4

5. In case of industries, copy of certificate of registration with Industries Department.

Section 5

6. Proof of permanent residential address the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Licensee immediately.

Section 6

7. In case of industries permission of Environment Conservation Department.

Section 7

1. Proof of ownership of the premises.

Section 1

2. A map indicating therein the proposed location of the plant/office and the point where supply is required. The map should normally be of the scale of 1cm representing 1200cm.

Section 2

3. Licence/NOC from statutory authority, if required or a declaration by the applicant that his connection does not fall under the requirement of NOC under any statute.

Section 3

4. In case of a proprietary firm, an affidavit to be submitted slating that the applicant is the sole proprietor of the firm.

Section 4

5. In case of partnership firm, partnership deed.

Section 5

6. In case of Limited Company, Memorandum and Articles of Association and Certificate of Incorporation.

Section 6

7. Proof of permanent residential address of the consumer and PAN Number, if any. If there is any change at a later date, the same shall be intimated by the consumer to the Licensee immediately.

Section 7

8. Letter of intent for production/enhancement in production may be furnished.

Section 8

9. List of equipments proposed to be installed along with the expected load.

Section 9

10. Resolution for authorised signatory.

Section 10

11. Registration from Industries Department.

Section 11

12. Extract of project report relevant to power and process requirements (in case of industries).

Section 12

13. Copy of the relevant section of the current tariff order that provides details of the tariff category opted by the consumer and duly signed by him. This will be appended with the agreement after completion of formalities.