Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014
Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014
Sections
1. Short title and commencement.
Section 12. Definitions.
Section 23. Constitution of the Fund.
Section 34. Utilization of the PSDF.
Section 45. Nodal Agency and its functions.
Section 56. Appraisal Committee.
Section 67. Monitoring Committee.
Section 78. Procedure for Application, Screening, Appraisal, Monitoring, Sanction etc of PSDF.
Section 89. Assistance Pattern.
Section 910. Execution, Operation & Maintenance of the Assets.
Section 1011. Budget & Accounts Preparation and Audit of PSDF, Utilization Certificate, Preparation of Subsidiary Records and Documents required for Disbursement from PSDF.
Section 1112. Implementation, Monitoring and Control of Projects/Schemes.
Section 1213. Annual Report.
Section 1314. Power to remove difficulties.
Section 1415. Repeal and Savings.
Section 15
central-electricity-regulatory-commission-power-system-development-fund-regulations-2014.json
•
15 Sections
•
Tamil Nadu
{
"id": 23740,
"slug": "central-electricity-regulatory-commission-power-system-development-fund-regulations-2014",
"title": "Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014",
"short_title": "Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014",
"act_number": "Published vide Notification (Draft) No. L-1/148 /2",
"act_year": 2014,
"act_type": "STATE",
"location": "Tamil Nadu",
"law_status": "unknown",
"enactment_date": null,
"description": "Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014",
"preamble": "",
"section_label": "Section",
"sections": [
{
"number": "1",
"title": "1. Short title and commencement.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 0
},
{
"number": "2",
"title": "2. Definitions.",
"chapter": null,
"content": "(a) \"Act\" means the Electricity Act, 2003 (36 of 2003), including amendments thereto;\n(b) \"Appraisal Committee\" shall mean the Committee constituted by Government of India, Ministry of Power for the purpose of scrutiny (techno-economic appraisal) and prioritization of various project proposals for funding from PSDF and such other functions relating to PSDF as may be assigned;\n(c) \"Central Commission\" means the Central Electricity Regulatory Commission referred to in sub-section (1) of Section 76 of the Act;\n(d) \"Congestion Relief Regulations\" means Central Electricity Regulatory Commission (Measures to relieve congestion in real time operation) Regulations, 2009 as amended from time to time and any subsequent enactment thereof;\n(e) \"Congestion Amount\" has the same meaning as assigned to it in Regulation 33 of the Power Market Regulations;\n(f) \"Congestion Charge\" has the same meaning as assigned to it under Congestion Relief Regulations;\n(g) \"Detailed Procedure\" means the procedure for implementation and administration of PSDF in accordance with these regulations as notified by the Nodal Agency with the approval of the Monitoring Committee;\n(h) \"Deviation Settlement Charges\" has the same meaning as assigned to it in the Deviation Settlement Regulations;\n(i) \"Deviation Settlement Mechanism Regulations\" means the Central Electricity Regulatory Commission (Deviation Settlement and related matters) Regulations 2014 as amended from time to time including subsequent enactment thereof;\n(j) \"Grid Code\" means the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations 2010, as amended from time to time including any subsequent enactment thereof;\n(k) \"Monitoring Committee\" shall mean the committee constituted by Government of India, Ministry of Power for the purpose of sanctioning of projects, release of funds from PSDF and over all monitoring of the implementation of projects and such other functions as may be assigned;\n(l) \"PSDF\" means the Power System Development Fund constituted under Regulation 3 of these regulations;\n(m) \"Reactive Energy Charges\" has the same meaning as assigned to it in the Grid Code;\n(n) \"State Commission\" means the State Electricity Regulatory Commission as referred to in sub-section (1) of Regulation 83 of the Act.",
"footnote": "",
"is_definition": true,
"sort_order": 1
},
{
"number": "3",
"title": "3. Constitution of the Fund.",
"chapter": null,
"content": "(a) Congestion charges standing to the credit of the \"Congestion Charge Account\" after release of amounts payable to Regional Entities entitled to receive congestion charges along with interest, if any, in accordance with the Congestion Relief Regulations;\n(b) Congestion amount arising from the difference in the market prices of different regions as a consequence of market splitting in power exchanges in accordance with Power Market Regulations;\n(c) Deviation Settlement Charges standing to the credit of the \"Regional Deviation Pool Account Fund\" after final settlement of claims in accordance with Deviation Settlement Mechanism Regulations;\n(d) RLDC reactive energy charges standing to the credit of Reactive Energy Charges Account in accordance with the Grid Code;\n(e) Such other charges as may be notified by the Commission from time to time:",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
{
"number": "4",
"title": "4. Utilization of the PSDF.",
"chapter": null,
"content": "(a) Transmission systems of strategic importance based on operational feedback by Load Despatch Centers for relieving congestion in inter-State transmission system (ISTS) and intra-State Transmission Systems which are incidental to the ISTS.\n(b) Installation of shunt capacitors, series compensators and other reactive energy generates for improvement voltage profile in the Grid.\n(c) Installation of special protection schemes, pilot and demonstrative projects, standard protection schemes and for setting right the discrepancies identified in the protection schemes and for setting right the discrepancies identified in the protection audits on regional basis.\n(d) Renovation and Modernization (R&M) of transmission and distribution system for relieving congestion.\n(e) Any other scheme/ project in furtherance of the above objectives such as technical studies and capacity building.",
"footnote": "",
"is_definition": false,
"sort_order": 3
},
{
"number": "5",
"title": "5. Nodal Agency and its functions.",
"chapter": null,
"content": "(b) The Nodal Agency shall perform the following functions:-\n(i) Act as Secretariat to the Monitoring Committee and the Appraisal Committee.\n(ii) Prepare a Detailed Procedure for release and disbursement from PSDF consistent with the Procedure approved by the Monitoring Committee from time to time.\n(iii) Keep the Record of Business transacted at each meeting of the Appraisal Committee and the Monitoring Committee.\n(iv) Prepare detailed procedure for preparation of Budget, Accounting of receipts/ disbursals from PSDF Public Account and Audit with the approval of the Monitoring Committee.\n(v) Prepare Annual Report of the PSDF.\n(vi) Perform such other functions as may be assigned by the Monitoring Committee.",
"footnote": "",
"is_definition": false,
"sort_order": 4
},
{
"number": "6",
"title": "6. Appraisal Committee.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 5
},
{
"number": "7",
"title": "7. Monitoring Committee.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 6
},
{
"number": "8",
"title": "8. Procedure for Application, Screening, Appraisal, Monitoring, Sanction etc of PSDF.",
"chapter": null,
"content": "(b) The Nodal Agency shall place these projects or scheme or activities for technical scrutiny by the Appraisal Committee.\n(c) After scrutinizing the proposals, the Appraisal Committee shall submit its Appraisal Report and recommendations in writing to the Central Commission or respective State Commissions, as the case may be, and to the project entity who has submitted the proposal.\n(d) The project entity shall then file petition with the Central Commission or respective State Commission, as the case may be, for regulatory approval of the scheme for funding from PSDF. The Commission shall accord the regulatory approval if the scheme conforms to any of the purposes mentioned in Regulation 4 of these regulations and the Central Commission or the State Commission may seek such information from the entity and such other person as may be considered necessary.\n(e) After regulatory approval, the entity will approach the Nodal Agency who will forward the project proposals to the Monitoring Committee for administrative sanction/approval and release of funds as per the Detailed Procedure.\n(f) The Monitoring Committee will consider the projects for sanction based on Appraisal Report and Regulatory Approval of the Commission in accordance with the extant rules/ instructions for sanction/ approval and release of funds on the lines of Restructured Accelerated Power Development & Reforms Programme (RAPDRP) Scheme and Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY) Scheme.\n(g) The release of funds from PSDF will be regulated as per the extant instructions of the Ministry of Finance in this regard.\n(h) The release of funds to Nodal Agency from the Public Account for further disbursement to project entities will be made after exercising requisite expenditure control, provided that the scheme has adequate funds provisioned for in the Demand for Grants of Ministry of Power.",
"footnote": "",
"is_definition": false,
"sort_order": 7
},
{
"number": "9",
"title": "9. Assistance Pattern.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 8
},
{
"number": "10",
"title": "10. Execution, Operation & Maintenance of the Assets.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 9
},
{
"number": "11",
"title": "11. Budget & Accounts Preparation and Audit of PSDF, Utilization Certificate, Preparation of Subsidiary Records and Documents required for Disbursement from PSDF.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 10
},
{
"number": "12",
"title": "12. Implementation, Monitoring and Control of Projects/Schemes.",
"chapter": null,
"content": "(b) The Appraisal Committee in consultation with Ministry of Power will evolve a mechanism to evaluate the implementation of projects by laying down objective quantifiable financial and technical outcome parameters for each category of projects funded under the Scheme.",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
{
"number": "13",
"title": "13. Annual Report.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 12
},
{
"number": "14",
"title": "14. Power to remove difficulties.",
"chapter": null,
"content": "",
"footnote": "",
"is_definition": false,
"sort_order": 13
},
{
"number": "15",
"title": "15. Repeal and Savings.",
"chapter": null,
"content": "(b) Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, annual reports, confirmation or declaration or any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.",
"footnote": "",
"is_definition": false,
"sort_order": 14
}
],
"metadata": {
"Act ID": "tn411",
"Act Number": "Published vide Notification (Draft) No. L-1/148 /2014/CERC, dated 28th February, 2014",
"Enactment Date": "",
"Act Year": "2014",
"Short Title": "Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2014",
"Type": "STATE",
"Location": "Tamil Nadu"
},
"updated_at": "2026-09-29 21:55:21"
}