[4-A. Technical Adviser.
[4-B. Welders certificate.
4-C. Conditions precedent for manufacture of boiler and boiler component.
(a) he has provided in the premises or precincts wherein such boiler or boiler component, or both are manufactured, such facilities for design and construction as may be prescribed by regulations;
(b) the design and drawings of the boiler and boiler component have been approved by the Inspecting Authority under clause (a) of sub-section (2) of section 4-D;
(c) the materials, mounting and fittings used in the construction of such boiler or boiler component, or both conform to the specifications prescribed by regulations; and
(d) the persons engaged for welding boiler or boiler component hold Welders certificate issued by a Competent Authority.
4-D. Inspection during manufacture.
(a) satisfied that the boiler or the boiler component conforms to the standards prescribed by regulations, it shall issue a certificate of inspection and stamp the boiler, or boiler component, or both; or
(b) of the opinion that the boiler, or boiler component, or both does not conform to the standards prescribed by regulations, it may for reasons to be recorded in writing refuse to issue such certificate:
4-E. Inspection during erection.
(a) satisfied that the erection of the boiler is in accordance with the regulations, it shall issue a certificate of inspection in such form as may be prescribed by regulations; or
(b) of the opinion that the boiler has not been erected in accordance with the regulations, it may for reasons to be recorded in writing, refuse to grant the certificate and shall communicate such refusal to the manufacturer of the boiler or boiler component forthwith:
4-F. Conditions precedent for repairing boiler and boiler component.
(a) he has provided in the premises or precincts, where in such boiler or boiler component or both are being used, such facilities for repairs as may be prescribed by regulations;
(b) the design and drawings of the boiler or boiler component, as the case may be, and the materials, mountings and fittings used in the repair of such boiler or boiler component conform to the regulations;
(c) persons engaged in welding, holds a Welders certificate issued by a Competent Authority;
(d) every user who does not have the in-house facilities for repair of boiler or boiler component shall engage a Boiler Repairer possessing a Boiler Repairer certificate for repair of a boiler or boiler component or both, as the case may be;
(e) every user shall engage a Competent Person for approval of repairs to be carried out in-house or by the repairers. ]
[5. Chief Inspector, Deputy Chief Inspectors and Inspectors.
Section 4 • The Boilers Act, 1923
4. Power to limit extent.
boilers-act-1923-sec-4.json
•
Section 4
{
"act_title": "The Boilers Act, 1923",
"act_slug": "boilers-act-1923",
"section_label": "Section",
"section": {
"number": "4",
"title": "4. Power to limit extent.",
"chapter": null,
"content": "[4-A. Technical Adviser.\n[4-B. Welders certificate.\n4-C. Conditions precedent for manufacture of boiler and boiler component.\n(a) he has provided in the premises or precincts wherein such boiler or boiler component, or both are manufactured, such facilities for design and construction as may be prescribed by regulations;\n(b) the design and drawings of the boiler and boiler component have been approved by the Inspecting Authority under clause (a) of sub-section (2) of section 4-D;\n(c) the materials, mounting and fittings used in the construction of such boiler or boiler component, or both conform to the specifications prescribed by regulations; and\n(d) the persons engaged for welding boiler or boiler component hold Welders certificate issued by a Competent Authority.\n4-D. Inspection during manufacture.\n(a) satisfied that the boiler or the boiler component conforms to the standards prescribed by regulations, it shall issue a certificate of inspection and stamp the boiler, or boiler component, or both; or\n(b) of the opinion that the boiler, or boiler component, or both does not conform to the standards prescribed by regulations, it may for reasons to be recorded in writing refuse to issue such certificate:\n4-E. Inspection during erection.\n(a) satisfied that the erection of the boiler is in accordance with the regulations, it shall issue a certificate of inspection in such form as may be prescribed by regulations; or\n(b) of the opinion that the boiler has not been erected in accordance with the regulations, it may for reasons to be recorded in writing, refuse to grant the certificate and shall communicate such refusal to the manufacturer of the boiler or boiler component forthwith:\n4-F. Conditions precedent for repairing boiler and boiler component.\n(a) he has provided in the premises or precincts, where in such boiler or boiler component or both are being used, such facilities for repairs as may be prescribed by regulations;\n(b) the design and drawings of the boiler or boiler component, as the case may be, and the materials, mountings and fittings used in the repair of such boiler or boiler component conform to the regulations;\n(c) persons engaged in welding, holds a Welders certificate issued by a Competent Authority;\n(d) every user who does not have the in-house facilities for repair of boiler or boiler component shall engage a Boiler Repairer possessing a Boiler Repairer certificate for repair of a boiler or boiler component or both, as the case may be;\n(e) every user shall engage a Competent Person for approval of repairs to be carried out in-house or by the repairers. ]\n[5. Chief Inspector, Deputy Chief Inspectors and Inspectors.",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
"prev_section": "2",
"next_section": "6"
}