Schedule - 'A' Transmission Undertaking
Part I
I. Transmission Assets. - All the transmission lines having the capacity to carry electricity at voltages of above 33kV on double circuit/single circuit on double circuit towers with Grid sub-stations of various capacities with all associated and related equipment, including step-up, stepdown transformers, circuit breakers, switchgear sets in sub-stations, metering arrangements and other protective devices with power-line communication system, allied control rooms, load dispatch center, lands (including right of way), buildings, roads and other auxiliary assets spread over within and outside the territory of the State including such assets under construction and assets acquired, transferred or rights of which were vested with the Board by transfer, sale, lease or otherwise, but excluding such constructions or installations lawfully owned and operated by others.
I. Transmission Assets.
II. General Assets. - The following, if they exclusively or primarily pertain to the above mentioned transmission systems properties or projects or activities related to such transmission systems, properties or projects:
II. General Assets.
(a) Special tools and equipment, material handling equipment, earth movers, bulldozers, concrete mixtures, cranes, trailers, heavy and light vehicles, furniture, fixtures, office equipment, air conditioners, refrigerators, computers and signal systems, spares, consumables, raw materials, lands and civil works installations including roads, buildings, staff quarters, rest houses, properties and structures and their associated buildings, schools, dispensaries, testing laboratories and equipment, training centers, workshops, works in progress, machinery and equipment sent for repairs, scraps and obsolete.
(b) All independent and stand-alone Rest houses, which are not part of any substations/installations of the Board but established as a part of transmission project of voltage class above 33 kV.
(c) The office establishment, buildings, lands and all other assets not covered elsewhere in this schedule, which is predominantly occupied, used for the activities of Transmission Undertakings as on the effective date.
III. Miscellaneous: -
III. Miscellaneous:
(a) Contracts, agreements, interest and arrangements to the extent they are associated with or related to transmission activities or to the Undertakings or Assets referred to in Para I and II above.
(b) Loans, secured and unsecured, current liabilities and other liabilities, to the extent they are associated with or related to transmission activities or to the Undertakings or assets referred to in to in Para I and II above and Part II of Schedule A.
(c) Cash & bank balances, Other current assets, other assets, to the extent they are associated with or related to transmission activities or to the Undertakings or assets referred to in to in Para I and II above and Part II of Schedule A.
(d) Contingent liabilities to the extent they are recognised and are associated with or related to transmission activities or to the Undertaking or Assets referred to in Para I and II above.
(e) Proceedings to the extent they are associated with or related to transmission activities or to the Undertaking or Assets referred to in Para I and II above.
(f) The transfer value of the assets and liabilities hereunder is based on the book value of the assets and liabilities on the effective date.
IV. General: -
IV. General:
(a) The assets and liabilities of the Transmission Undertakings shall vest in Bihar State Power Transmission Company Limited.
(b) In consideration of the transfer mentioned above, the Transmission Company (Bihar State Power Transmission Company Limited) shall issue equity shares in favour of the Bihar State Power Holding Company Limited after taking into account the assets and liabilities of Transmission Undertaking of the Board transferred to Transmission Company.
Schedule 'A' Transmission Undertaking
Part II
Aggregate Assets and Liabilities vested in Bihar State Power Transmission Company Limited
Aggregate Assets and Liabilities vested in Bihar State Power Transmission Company Limited
Balance Sheet As on 1st April 2011
Balance Sheet As on 1st April 2011
TransCo
TransCo
Assets
(Rs. In Cr.)
1
1
Fixed Assets
Fixed Assets
Gross Block
748
Less: Accumulated Depreciation
492
Net Fixed Assets
255
2
2
Capital Expenditure in Progress
Capital Expenditure in Progress
102
3
Assets not in use
-
4
Deferred Cost
-
5
Regulatory Assets
-
6
Intangible Assets
-
7
7
Investments
Investments
Investment in Joint Ventures etc.
-
Investment in Subsidiary Companies
-
8
8
Current Assets
Current Assets
(i)
Stocks
55
(ii)
Receivables against supply of power
-
(iii)
Cash and Bank Balances
68
(iv)
Loans & Advances
4
(v)
Sundry Receivables
7
(vi)
Investments (in Fixed Deposits)
110
Total Current Assets (A)
Total Current Assets (A)
245
245
Less: Current Liabilities
Less: Current Liabilities
(i)
Liabilities for purchase of power
-
(ii)
Staff related Liability & Provisions
-
(iii)
Deposits and Retentions from Suppliers and
Contractors
16
(iv)
Other Liabilities
35
(v)
Borrowings for Working Capital
40
Total Current Liabilities (B)
Total Current Liabilities (B)
90
Net Current Assets (A-B)
Net Current Assets (A-B)
155
9
Subsidy Receivable from Government
-
Total Assets
Total Assets
512
Liabilities
1
1
Equity Capital
Equity Capital
235
2
2
Reserves & Surplus
Reserves & Surplus
(i)
Contributions, Grant and Subsidies towards Cost
of Capital assets
-
(ii)
Reserves and Reserve Funds
-
3
3
Secured & Unsecured Loans
Secured & Unsecured Loans
(i)
Term Loan from Banks
277
(ii)
Payments due on Capital Liabilities
(a)
From State Govt.
-
(b)
From CPSUs (REC)
-
(iii)
Capital Liabilities
(a)
From REC
-
(b)
From PFC
-
(c)
Others
-
(iv)
Funds from state Government
-
4
4
Other Liabilities
Other Liabilities
(i)
Security Deposits from Consumers
-
(ii)
Deposit for Electrification, Service Connection
etc.
-
5
Surplus/(Deficit)
-
Total Liabilities
Total Liabilities
512
Notes 1. - The above opening balance sheet has been drawn on a provisional basis based on the Balance Sheet of the Board as on March 31st, 2011. The amounts mentioned under various heads are subject to validation, verification, and updation and these shall be completed during the provisional period mentioned in Clause 9 of the Transfer Scheme.
Notes 1.
Section 12 • Bihar State Electricity Reforms Transfer Scheme, 2012
12. Exemption of Duty.
bihar-state-electricity-reforms-transfer-scheme-2012-sec-12.json
•
Section 12
{
"act_title": "Bihar State Electricity Reforms Transfer Scheme, 2012",
"act_slug": "bihar-state-electricity-reforms-transfer-scheme-2012",
"section_label": "Section",
"section": {
"number": "12",
"title": "12. Exemption of Duty.",
"chapter": null,
"content": "Schedule - 'A' Transmission Undertaking\nPart I\nI. Transmission Assets. - All the transmission lines having the capacity to carry electricity at voltages of above 33kV on double circuit/single circuit on double circuit towers with Grid sub-stations of various capacities with all associated and related equipment, including step-up, stepdown transformers, circuit breakers, switchgear sets in sub-stations, metering arrangements and other protective devices with power-line communication system, allied control rooms, load dispatch center, lands (including right of way), buildings, roads and other auxiliary assets spread over within and outside the territory of the State including such assets under construction and assets acquired, transferred or rights of which were vested with the Board by transfer, sale, lease or otherwise, but excluding such constructions or installations lawfully owned and operated by others.\nI. Transmission Assets.\nII. General Assets. - The following, if they exclusively or primarily pertain to the above mentioned transmission systems properties or projects or activities related to such transmission systems, properties or projects:\nII. General Assets.\n(a) Special tools and equipment, material handling equipment, earth movers, bulldozers, concrete mixtures, cranes, trailers, heavy and light vehicles, furniture, fixtures, office equipment, air conditioners, refrigerators, computers and signal systems, spares, consumables, raw materials, lands and civil works installations including roads, buildings, staff quarters, rest houses, properties and structures and their associated buildings, schools, dispensaries, testing laboratories and equipment, training centers, workshops, works in progress, machinery and equipment sent for repairs, scraps and obsolete.\n(b) All independent and stand-alone Rest houses, which are not part of any substations/installations of the Board but established as a part of transmission project of voltage class above 33 kV.\n(c) The office establishment, buildings, lands and all other assets not covered elsewhere in this schedule, which is predominantly occupied, used for the activities of Transmission Undertakings as on the effective date.\nIII. Miscellaneous: -\nIII. Miscellaneous:\n(a) Contracts, agreements, interest and arrangements to the extent they are associated with or related to transmission activities or to the Undertakings or Assets referred to in Para I and II above.\n(b) Loans, secured and unsecured, current liabilities and other liabilities, to the extent they are associated with or related to transmission activities or to the Undertakings or assets referred to in to in Para I and II above and Part II of Schedule A.\n(c) Cash & bank balances, Other current assets, other assets, to the extent they are associated with or related to transmission activities or to the Undertakings or assets referred to in to in Para I and II above and Part II of Schedule A.\n(d) Contingent liabilities to the extent they are recognised and are associated with or related to transmission activities or to the Undertaking or Assets referred to in Para I and II above.\n(e) Proceedings to the extent they are associated with or related to transmission activities or to the Undertaking or Assets referred to in Para I and II above.\n(f) The transfer value of the assets and liabilities hereunder is based on the book value of the assets and liabilities on the effective date.\nIV. General: -\nIV. General:\n(a) The assets and liabilities of the Transmission Undertakings shall vest in Bihar State Power Transmission Company Limited.\n(b) In consideration of the transfer mentioned above, the Transmission Company (Bihar State Power Transmission Company Limited) shall issue equity shares in favour of the Bihar State Power Holding Company Limited after taking into account the assets and liabilities of Transmission Undertaking of the Board transferred to Transmission Company.\nSchedule 'A' Transmission Undertaking\nPart II\nAggregate Assets and Liabilities vested in Bihar State Power Transmission Company Limited\nAggregate Assets and Liabilities vested in Bihar State Power Transmission Company Limited\nBalance Sheet As on 1st April 2011\nBalance Sheet As on 1st April 2011\nTransCo\nTransCo\nAssets\n(Rs. In Cr.)\n1\n1\nFixed Assets\nFixed Assets\nGross Block\n748\nLess: Accumulated Depreciation\n492\nNet Fixed Assets\n255\n2\n2\nCapital Expenditure in Progress\nCapital Expenditure in Progress\n102\n3\nAssets not in use\n-\n4\nDeferred Cost\n-\n5\nRegulatory Assets\n-\n6\nIntangible Assets\n-\n7\n7\nInvestments\nInvestments\nInvestment in Joint Ventures etc.\n-\nInvestment in Subsidiary Companies\n-\n8\n8\nCurrent Assets\nCurrent Assets\n(i)\nStocks\n55\n(ii)\nReceivables against supply of power\n-\n(iii)\nCash and Bank Balances\n68\n(iv)\nLoans & Advances\n4\n(v)\nSundry Receivables\n7\n(vi)\nInvestments (in Fixed Deposits)\n110\nTotal Current Assets (A)\nTotal Current Assets (A)\n245\n245\nLess: Current Liabilities\nLess: Current Liabilities\n(i)\nLiabilities for purchase of power\n-\n(ii)\nStaff related Liability & Provisions\n-\n(iii)\nDeposits and Retentions from Suppliers and\n\t\t\t\tContractors\n16\n(iv)\nOther Liabilities\n35\n(v)\nBorrowings for Working Capital\n40\nTotal Current Liabilities (B)\nTotal Current Liabilities (B)\n90\nNet Current Assets (A-B)\nNet Current Assets (A-B)\n155\n9\nSubsidy Receivable from Government\n-\nTotal Assets\nTotal Assets\n512\nLiabilities\n1\n1\nEquity Capital\nEquity Capital\n235\n2\n2\nReserves & Surplus\nReserves & Surplus\n(i)\nContributions, Grant and Subsidies towards Cost\n\t\t\t\tof Capital assets\n-\n(ii)\nReserves and Reserve Funds\n-\n3\n3\nSecured & Unsecured Loans\nSecured & Unsecured Loans\n(i)\nTerm Loan from Banks\n277\n(ii)\nPayments due on Capital Liabilities\n(a)\nFrom State Govt.\n-\n(b)\nFrom CPSUs (REC)\n-\n(iii)\nCapital Liabilities\n(a)\nFrom REC\n-\n(b)\nFrom PFC\n-\n(c)\nOthers\n-\n(iv)\nFunds from state Government\n-\n4\n4\nOther Liabilities\nOther Liabilities\n(i)\nSecurity Deposits from Consumers\n-\n(ii)\nDeposit for Electrification, Service Connection\n\t\t\t\tetc.\n-\n5\nSurplus/(Deficit)\n-\nTotal Liabilities\nTotal Liabilities\n512\nNotes 1. - The above opening balance sheet has been drawn on a provisional basis based on the Balance Sheet of the Board as on March 31st, 2011. The amounts mentioned under various heads are subject to validation, verification, and updation and these shall be completed during the provisional period mentioned in Clause 9 of the Transfer Scheme.\nNotes 1.",
"footnote": "",
"is_definition": false,
"sort_order": 11
},
"prev_section": "11",
"next_section": "2"
}