(b) The Surveyor shall survey the engine, boiler, all machineries, hull, equipments, passenger's accommodation, fire fighting and life saving equipment and determine the number of passengers and the nature and quantum of cargo which the vessel is fit to carry. The Surveyor shall also examine the certificate of the master, serangs, the engineer and engine driver and electrical operator on vessels or vessels having electrical machineries operating on 400 volt and above to ensure that the same are in accordance with the provisions of the Act and these rules. The surveyor shall also inspect the light and sound signals to ascertain that the light and sound signals are in good condition to prevent collision on waterways.
5.
(b) If the Owner/Master of a mechanically propelled vessel is dissatisfied with the survey report of first surveyor, an application from the Owner/ Master and payment of fees which shall be double of previous survey, the Director of Inland Transport/Chief Surveyor shall appoint two surveyors. Any declaration given by them or refusal to give declaration shall be final.
6.
(a) after the expiry of one year from the date thereof; or
(b) after the expiry of the period (if less than one year) for which the hull, boiler, engines or other machinery, or any of the equipments of the mechanically propelled vessel to which the certificate relates have been stated in the certificate to be sufficient; or
(c) after notice has been given by the Government of Bihar to the owner or master of the mechanically propelled vessel that the Government has cancelled or suspended it.
(a) that the declaration by the surveyor of the sufficiency and good condition of the hull, boilers, engines or other machinery or of any of the equipments of the mechanically propelled vessel has been fraudulently or erroneously made; or
(b) that the certificate has otherwise been granted upon false or erroneous information; or
(c) that since the making of the declaration the hull, boilers, engines or other machinery, or any of the equipments of the mechanically propelled vessel have sustained any material injury, or have otherwise become insufficient.
7.
8.
(a) before a new vessel is put in service (Initial Survey);
(b) periodical survey once every twelve months including survey of hull, machinery and equipment.
(c) four years dry docking survey, will include dry docking and detailed check on machinery wear and tear followed by satisfactory running trials;
(d) additional surveys as and when necessary.
(b) The periodical survey shall include an inspection of the whole of the hull, boilers, machinery and equipments including the outside of the vessel's bottom in dry dock. The survey shall be such as to ensure that hull, machinery and equipments is in satisfactory condition and fit for the service for which the vessel is intended and that it complies with the requirements of these rules.
(c) A survey either general or partial, according to circumstances, shall be made-
(i) every time an accident occurs or a defect is discovered which affects the safety of the vessel;
(ii) its efficiency or completeness of its equipment or whenever any important repair or renewal are made;
(iii) whenever a request for extensions of certificates of survey is being considered.
(d) The survey shall be such as to ensure that the necessary repairs or renewals have been effectively made and the material and workmanship of such repairs or renewals are in all respects satisfactory and the Inland Vessel is fit for the service for which it is intended. (3) After the survey of the Inland Vessel has been completed, no change shall be made without approval of surveying authority.
9.
Chapter - 3.0
Registration of Inland Vessels
10.
(a) In the case of a newly built vessel, the builder's certificate and inspection certificate issued by the surveyor along with approved drawing of the vessel, documents relating to purchase of the vessel and document of its ownership.
(b) In the case of renovated vessels, builder's certificate and inspection certificate issued by the surveyor along with approved drawing of the vessel and document of its ownership.
(c) Copy of insurance certificate as per Chapter VI A, Section 54C of the Act.
11.
12.
13.
(1) Inland Vessel name shall be marked on each of its bows or at a suitable place on the superstructure and the inland vessels name and the name of its place of registration shall be marked on its stern on a dark background in white letters or on a white background in black letter which shall not be less than 15 centimeter in height and 2 centimeter in breadth.
(2) Inland Vessels registration mark and the number denoting its registered tonnage shall be cut in on its main beam or any permanent bulkhead at a prominent place. The letters and figures of the registration marks shall not be less than 15cm. X. 10 cm.
(3) Scale of draught marks shall be cut or welded in meters and decimeters, forward and rear of Inland vessels on both the port and the starboard side.
(4) Inland vessels load line shall be cut or welded 300cm. long and 35mm. wide and shall coincide with maximum draught level of the inland vessel in fair weather conditions.
(5) The maximum drought level mark line will be below deck level not less than 62 cm. The space as per requirement will be taken space all around the vessel on deck level.
14.
15.
16.
(a) Whenever any material alteration is made in the hull affecting the length or breadth or depth of the inland vessel or wherever there is alteration in the means of propulsion including addition or removal of an auxiliary engine the vessel shall require new registration.
(b) Where the alteration consists merely of a change in the dimensions of close in space, the addition or removal of poop or deckhouse etc. or an allowance or disallowance or crew space of other similar change or an alteration from motor or steam crew to another motor or steam crew or reverse, the registering authority may allow such alteration to be recorded provided the stability of the vessel is not endangered thereby.
17.
18.
19.
20.
21.
Chapter - 4.0
Certificate of Competency to Engineer and Engine Drivers of Inland Vessels
Section 4 • Bihar Inland Vessels Rules, 2013
4. The surveyor should have following minimum qualifications.
bihar-inland-vessels-rules-2013-sec-4.json
•
Section 4
{
"act_title": "Bihar Inland Vessels Rules, 2013",
"act_slug": "bihar-inland-vessels-rules-2013",
"section_label": "Section",
"section": {
"number": "4",
"title": "4. The surveyor should have following minimum qualifications.",
"chapter": null,
"content": "(b) The Surveyor shall survey the engine, boiler, all machineries, hull, equipments, passenger's accommodation, fire fighting and life saving equipment and determine the number of passengers and the nature and quantum of cargo which the vessel is fit to carry. The Surveyor shall also examine the certificate of the master, serangs, the engineer and engine driver and electrical operator on vessels or vessels having electrical machineries operating on 400 volt and above to ensure that the same are in accordance with the provisions of the Act and these rules. The surveyor shall also inspect the light and sound signals to ascertain that the light and sound signals are in good condition to prevent collision on waterways.\n5.\n(b) If the Owner/Master of a mechanically propelled vessel is dissatisfied with the survey report of first surveyor, an application from the Owner/ Master and payment of fees which shall be double of previous survey, the Director of Inland Transport/Chief Surveyor shall appoint two surveyors. Any declaration given by them or refusal to give declaration shall be final.\n6.\n(a) after the expiry of one year from the date thereof; or\n(b) after the expiry of the period (if less than one year) for which the hull, boiler, engines or other machinery, or any of the equipments of the mechanically propelled vessel to which the certificate relates have been stated in the certificate to be sufficient; or\n(c) after notice has been given by the Government of Bihar to the owner or master of the mechanically propelled vessel that the Government has cancelled or suspended it.\n(a) that the declaration by the surveyor of the sufficiency and good condition of the hull, boilers, engines or other machinery or of any of the equipments of the mechanically propelled vessel has been fraudulently or erroneously made; or\n(b) that the certificate has otherwise been granted upon false or erroneous information; or\n(c) that since the making of the declaration the hull, boilers, engines or other machinery, or any of the equipments of the mechanically propelled vessel have sustained any material injury, or have otherwise become insufficient.\n7.\n8.\n(a) before a new vessel is put in service (Initial Survey);\n(b) periodical survey once every twelve months including survey of hull, machinery and equipment.\n(c) four years dry docking survey, will include dry docking and detailed check on machinery wear and tear followed by satisfactory running trials;\n(d) additional surveys as and when necessary.\n(b) The periodical survey shall include an inspection of the whole of the hull, boilers, machinery and equipments including the outside of the vessel's bottom in dry dock. The survey shall be such as to ensure that hull, machinery and equipments is in satisfactory condition and fit for the service for which the vessel is intended and that it complies with the requirements of these rules.\n(c) A survey either general or partial, according to circumstances, shall be made-\n(i) every time an accident occurs or a defect is discovered which affects the safety of the vessel;\n(ii) its efficiency or completeness of its equipment or whenever any important repair or renewal are made;\n(iii) whenever a request for extensions of certificates of survey is being considered.\n(d) The survey shall be such as to ensure that the necessary repairs or renewals have been effectively made and the material and workmanship of such repairs or renewals are in all respects satisfactory and the Inland Vessel is fit for the service for which it is intended. (3) After the survey of the Inland Vessel has been completed, no change shall be made without approval of surveying authority.\n9.\nChapter - 3.0\nRegistration of Inland Vessels\n10.\n(a) In the case of a newly built vessel, the builder's certificate and inspection certificate issued by the surveyor along with approved drawing of the vessel, documents relating to purchase of the vessel and document of its ownership.\n(b) In the case of renovated vessels, builder's certificate and inspection certificate issued by the surveyor along with approved drawing of the vessel and document of its ownership.\n(c) Copy of insurance certificate as per Chapter VI A, Section 54C of the Act.\n11.\n12.\n13.\n(1) Inland Vessel name shall be marked on each of its bows or at a suitable place on the superstructure and the inland vessels name and the name of its place of registration shall be marked on its stern on a dark background in white letters or on a white background in black letter which shall not be less than 15 centimeter in height and 2 centimeter in breadth.\n(2) Inland Vessels registration mark and the number denoting its registered tonnage shall be cut in on its main beam or any permanent bulkhead at a prominent place. The letters and figures of the registration marks shall not be less than 15cm. X. 10 cm.\n(3) Scale of draught marks shall be cut or welded in meters and decimeters, forward and rear of Inland vessels on both the port and the starboard side.\n(4) Inland vessels load line shall be cut or welded 300cm. long and 35mm. wide and shall coincide with maximum draught level of the inland vessel in fair weather conditions.\n(5) The maximum drought level mark line will be below deck level not less than 62 cm. The space as per requirement will be taken space all around the vessel on deck level.\n14.\n15.\n16.\n(a) Whenever any material alteration is made in the hull affecting the length or breadth or depth of the inland vessel or wherever there is alteration in the means of propulsion including addition or removal of an auxiliary engine the vessel shall require new registration.\n(b) Where the alteration consists merely of a change in the dimensions of close in space, the addition or removal of poop or deckhouse etc. or an allowance or disallowance or crew space of other similar change or an alteration from motor or steam crew to another motor or steam crew or reverse, the registering authority may allow such alteration to be recorded provided the stability of the vessel is not endangered thereby.\n17.\n18.\n19.\n20.\n21.\nChapter - 4.0\nCertificate of Competency to Engineer and Engine Drivers of Inland Vessels",
"footnote": "",
"is_definition": false,
"sort_order": 2
},
"prev_section": "2",
"next_section": "22"
}