← Back to Bihar Factories Rules, 1950

3. Approval of plans.

(a) A flow diagram or chart of the manufacturing process to be carried on in the factory or in the part of factory.
(b) A brief description of all the manufacturing processes and work proposed to be carried on in the factory or in the part of the factory, and
(c) The following plans and drawing each in triplicate, drawn to scale :-
(i) site plan of the factory showing its surrounding including other buildings, structures, open land, roads, streams of rivers adjacent or close to the site,
(ii) lay out-plan of the factory and its premises,
(iii) plans elevations, and all necessary cross-sections of all the buildings, indicating relevant details including those relating to natural lighting, ventilation and means of escape in case of fire and showing clearly the position of the plant, machinery, aisles, passageways and gun-ways.
[3A. Certificate of Stability.