5. Application for Registration with Municipality.

(i) Revenue documents in original.
(ii) Site plan in the scale of 1: 200 and location plan in 1: 1000.
(iii) Affidavit from the owner of the land containing his consent along with proof of ownership.
(iv) Affidavit from the owner or the association of owners of the commercial building as the case may be, giving the consent.
(v) Drawing of tower with complete details including the specifications of foundations and design parameters.
(vi) Height of the tower along with its elevation.
(vii) In case the tower is in the vicinity or adjoining to high or low tension electric line, then its distance from the same shall be clearly indicated in the drawings.
(viii) Structural safety certificate of tower from a graduate structural engineer who is a member of institute of Engineers (India).
(ix) Indemnity Bond to take care of any loss or injury due to accident caused by the tower (including a declaration to the effect that the applicant shall take special precaution for fire safety and lighting and he shall be solely responsible for paying all kinds of compensation and damages and would be responsible for any civil or criminal case arising therefrom.
(x) Mobile companies shall indicate the capacity of towers or antenna in megawatt.
(xi) The company shall produce certificate from concerned authority that the noise generated from the electrical equipment is within the limits fixed from time to time by Environment and Forest Ministry, Government of India, and Bihar State Pollution Control Board.
(xii) In case the Mobile tower is proposed to be installed near any airport and is affected by the latest circular of AAI, permission of the Airport Authority shall have to be taken and submitted.
(xiii) The Municipality shall prescribe the form of application for registration in which the above mentioned details will be incorporated.