Original works other than residential buildings and individual projects of water-supply and sanitary and electrical installations
Authority to whom the power is delegated
Extent of powers delegated.
Chief Engineers
(a)
Rs. 10,000 for non-residential buildings belonging to his
department, the cost of which is debitable to the Public Works
Grant.
(b)
Rs. 5,000 for Miscellaneous works belonging to his department,
the cost of which is debitable to the Public Works Grant.
Chief Engineer (B. and R.)
(c)
Rs. 10,000 for Communication Works.
Superintending Engineers
(a)
Rs.5,000 for non-residential buildings belonging to his
department, the cost of which is debitable to the Public Works
Grant.
(b)
Rs. 2,500 for Miscellaneous works belonging to his department,
the cost of which is debitable to the Public Works Grant.
Superintending Engineers (B. & R.)
(c)
Rs. 10,000 for Communication Works.
1.
The Board of Revenue
...
Rs. 10,000 for non-residential buildings belonging to his
department, the cost of which is debitable to Public Works Grant.
2.
The Registrar, High Court, Patna
...
3.
The Director of Public Instruction
...
4.
The Inspector-General of Police
...
5.
The Inspector-General of Prisons
...
6.
The Inspector-General of Registration
...
7.
The Director of Health Services
...
8.
The Commissioner of Commercial Taxes
...
9.
The Commissioner of Labour
...
10.
The Commissioner of Excise
...
11.
The Chief Conservator of Forests
...
12.
The Registrar of Co-operative Societies
...
13.
The Director of Agriculture
...
14.
The Director of Animal Husbandry
...
15.
The Director of Industries
...
16.
The Cane Commissioner
...
17.
The Commissioners of Divisions
...
18.
The District and Sessions Judges, including Judicial
Commissioner, Chota Nagpur Division
Rs. 5000
]
For non-residential buildings belonging to his department, the
cost of which is debitable to the Public Works Grant.
19.
The District Magistrates and Collectors and Deputy
Commissioner.
Rs. 2,500
Note. - (i) Power delegated is inclusive of water-supply, sanitary and electrical installations where such works form part of the main buildings project.
Note.
(ii) Communication works include works on roadside Inspection Bungalows, Rest Houses, etc.
(iii) In the case of State Highways, the approval of the Commissioner of the Division should be obtained before any material change is made in the alignment of roads.
(iv) Power delegated to Commissioners of Divisions includes works on Circuit Houses.
(v) Power delegated will not apply to works on the following non-residential buildings:-
(a) Secretariat buildings at Patna and Ranchi and temporary barracks adjoining the Secretariat compound at Patna.
(b) Legislature buildings (both Assembly and Council) at Patna.
(c) High Court buildings at Patna.
(d) Buildings used for residential purpose but are classified as non-residential, e.g., police barracks, hostels peons, barracks, etc.
(vi) Government in the Public Works Department will accord administrative approval to all works relating to buildings mentioned at (v)(a) and (b). As regards works relating to the buildings mentioned at (v)(c) administrative approval will be accorded by the Government in the Law Department and at (v)(d) by the administrative department concerned.
Section II
Section II
Residential Buildings
(a) residences in the New Capital Area at Patna;
(b) chambers, quarters, flats (including Legislature's club), etc. meant for the members of both houses of Legislature at Patna;
(c) residences at Ranchi intended for occupation by Ministers, the gazetted officers of the Secretariat, and the Heads of Departments and the gazetted officers attached to their offices;
(d) clerks' quarters at Ranchi intended for occupation by the ministerial staff accompanying Government and Heads of Departments to Ranchi.
Note 1. - The area of the New Capital is defined in the map forwarded with this Department Memo No. 9577-85.A.R., dated the 7th June, 1927, to all Departments of Government and includes the residences in the Patna-Gaya Road, Chhajubagh and near about the Race Course (now Gandhi Maidan), Bankipur.
Note 1.
Note 2. - The word "Residence" does not include the clerks' quarters at Patna.
Note 2.
Authority to whom the power is delegated
Extent of power delegated
1.
The Board of Revenue
...
Rs. 7,500
2.
The Registrar, High Court, Patna
...
3.
The Director of Public Instruction
...
4.
The Inspector-General of Police
...
5.
The Inspector-General of Prisons
...
6.
The Inspector-General of Registration
...
7.
The Director of Health Services
...
8.
The Commissioner of Commercial Taxes
...
9.
The Commissioner of Excise
...
10.
The Commissioner of Labour
...
11.
The Chief Conservator of Forests
...
12.
The Registrar of Co-operative Societies
...
13.
The Director of Agriculture
...
14.
The Director of Animal Husbandry
...
15.
The Director of Industries
...
16.
The Cane Commissioner
...
17.
The Transport Commissioner
...
18.
The Commissioners of Divisions
...
19.
The Chief Engineers
...
20.
The Superintending Engineers
...
Rs. 5,000
Note 1. - The Inspector-General of Police has power to pass excess in the standard rent over 10 per cent of the average emoluments of the officers, subordinate to him.
Note 1.
[Vide Finance Department's Memo No. 11361-F., dated the 26th November, 1935].
Note 2. - (i) Power delegated is inclusive of the Water-Supply, Sanitary and Electrical Installation where such works are parts of the main buildings projects.
Note 2.
(ii) Power delegated above will not apply to any new work and also of work of addition or alteration to existing residential buildings and quarters occupied free of rent.
Section III
Section III
Individual projects of water-supply, sanitary and electrical installations
(A) Non-Residential Buildings
Authority to whom the power is delegated
Extent of power delegated
Water-supply or sanitary installation
Electrical installation
1.
The Board of Revenue
...
Rs. 5,000
Rs. 1,000
2.
The Registrar, High Court
...
3.
The Director of Public Instruction
...
4.
The Inspector-General of Police
...
5.
The Inspector-General of Prisons
...
6.
The Inspector-General of Registration
...
7.
The Director of Health Services
...
8.
The Commissioner of Commercial Taxes
...
9.
The Commissioner of Excise
...
10.
The Commissioner of Labour
...
11.
The Chief Conservator of Forests
...
12.
The Registrar of Co-operative Societies
...
13.
The Director of Agriculture
...
14.
The Director of Animal Husbandry
...
15.
The Director of Industries
...
16.
The Chief Engineers
...
17.
The Commissioners of Divisions
...
18.
The Cane Commissioner
...
19.
The Superintending Engineers and District and Sessions Judges,
including Judicial Commissioner, Chota Nagpur Division
...
Rs. 2,500
Rs. 500
20.
District Magistrates and Deputy Commissioners
...
Rs. 1,000
Rs. 250
Note. - (i) Powers delegated will apply to those non-residential buildings only the cost of which is debitable to the Public Works Grant.
Note.
(ii) Powers delegated will not apply to non-residential buildings mentioned in note (v)(d) below paragraph 2.
(iii) Power delegated to Commissioners of Divisions includes works in Circuit Houses.
(B) Residential Buildings
Authority to whom the power is delegated
Extent of power delegated
Water-supply or sanitary installation
Electrical Works
1.
The Board of Revenue
...
Rs. 2,500
Rs. 500
2.
The Registrar, High Court
...
3.
The Director of Public Instruction
...
4.
The Inspector-General of Police
...
5.
The Inspector-General of Prisons
...
6.
The Inspector-General of Registration
...
7.
The Director of Health Services
...
8.
The Commissioner of Commercial Taxes
...
9.
The Commissioner of Excise
...
10.
The Commissioner of Labour
...
11.
The Chief Conservator of Forests
...
12.
The Registrar of Co-operative Societies
...
13.
The Director of Agriculture
...
14.
The Director of Animal Husbandry
...
15.
The Director of Industries
...
16.
The Cane Commissioner
...
17.
The Transport Commissioner
...
18.
The Commissioners of Divisions
...
19.
Chief Engineers
...
20.
Superintending Engineers
...
Rs. 1,000
Rs. 250
Note. - (i) Powers delegated will apply to works on those residential buildings only, the cost of which is debitable to the Public Works Grant.
Note.
(ii) Powers delegated will not apply to residential buildings mentioned at paragraph 3 and note (ii) below paragraph 4.
Section IV
Section IV
Rs.
(1)
Chief Engineers
...
10,000
(2)
Superintending Engineers
...
5,000
(3)
Executive Engineers
...
200
Note. - The above limits exclude departmental charges.
Note.
Section V
Section V
Technical Sanction
(i) administrative approval has been accorded by the competent authority.
(ii) the report prefacing the estimates and the principal plan attached thereto have been countersigned by the Civil Officers or the Head of Department concerned-
(a) All Executive Engineers (including P.H.E. and Electricity Departments)-Rs. 5,000.
(b) All Superintending Engineers (including P.H.E. and Electricity Departments)-Rs. 1,00,000.
(c) All Chief Engineers (including PH.E. and Electricity Departments)-Full powers.
Note 1. - The above limit excludes departmental charges.
Note 1.
Note 2. - These powers apply to Deposit works also.
Note 2.
Section VI
Section VI
Procedure for calling plans and estimates for purposes of Administrative approval
(b) The Civil Officer, with the consent of the Head of the Department or Administrative Department concerned, may also call for plans and estimates for independent electrical project from the Executive Engineer, Electrical Works Division and for Sanitary and Water-Supply projects from the Executive Engineer, Public Health Engineering Department.
(b) Ordinarily, the Public Works Department Officer shall submit the plans and estimates to the requisitioning officer within four months from the date of requisition.
(c) Whenever a new building is to be constructed or an existing building is to be extended or improved and it is intended to provide with Electrical or Sanitary and Water-Supply installations or both, the requisitioning officer will call for plans and estimates from the P.W. (R. and B.) officers. In such cases, the Executive Engineer in charge of the buildings will obtain the estimated cost of the electrical and Public Health portion of the project from the Executive Engineer, Electric Works Division and Executive Engineer, Public Health Engineering Department and will include the same in the total cost of the project. Thereafter, he will send the consolidated project to the requisitioning officer concerned. In case of works costing above Rs. 5.000 and up to Rs. 1,00,000 the consolidated project will be prepared by the Superintending Engineer. P.W. (R. and B.) Department who will send the same to the requisitioning officer direct. For work costing above Rs. 1,00,000 the Superintending Engineers will submit plans and estimates for their respective portions of work to the respective Chief Engineers and the Chief Engineer, Public Health Engineering Department and the Chief Engineer, Electricity Department will after necessary scrutiny and check forward their portions of the plans and estimates to the Chief Engineer, Roads and Buildings, for consolidation. The latter will then forward the same to the requisitioning Heads of Departments.
(i) In case of residential projects, the Administrative Department shall refer the project to the P.W.D. for examination with reference to the admissible outlay on the basis of average pay and the provisional rent statement (both of which should invariably accompany the reference) and thereafter accord administrative approval to the project with the concurrence of Finance Department.
(ii) In case of non-residential project, the concurrence of Finance Department will only be necessary prior to giving administrative approval to the project.
Note. - The cases, where only Water-Supply and Sanitary Installations are to be provided in a building, shall be referred to the Public Health Engineering Department by the Administrative Department for examination of rent implication, etc., but in case of Electric installation to a building, Public Works (R. and B.) Department will be consulted as usual for rent implications, etc.
Note.
Section VII
Section VII
Allotment of funds for Minor Works
Rs. P.
Allotment available for the year
...
...
Less sanctioned previously
...
...
Amount of this sanction
...
...
Balance of allotment still available
...
...
Section VIII
Section VIII
Funds for Major Works
(ii)(a) The schedule of demand with regard to the building portion of the project or/and Electrical installation thereto shall be referred to the Public Works (B. and R.) Department for concurrence as usual as the Chief Engineer (B. and R.) is the controlling officer of the budget under the head "50-Civil Works" to which the cost of electrification of Government building is also chargeable. No reference to Public Works (B. and R.) Department will, however, be necessary in case of an independent project concerning Water-Supply and Sanitary installation to a building.
Note. - The Chief Engineer (B. and R.) shall be competent to obtain demand from the Electrical Executive Engineer in respect of funding of electricity projects.
Note.
(b) The Administrative Department shall make separate reference direct to the Public Health Engineering Department for concurrence in the schedule of demand in respect of an independent Water-Supply and Sanitary installations to a building as well as to the Public Health portion of a building project as the cost for such portion of work is debitable to the Head "39-Public Health" the budget of which is controlled by the Public Health Engineering Department.
Section IX
Section IX
Revised administrative approval
275.
Note. - With a view to present large savings occurring in the Provincial Public Works budgets against the sanctioned grants the Government of Bihar in the Public Works Department have, in accordance with the recommendations of the Public Accounts Committee, directed that in case of large building projects costing Rs. 50,000 or more the budget provision should, in the year, be ordinarily limited to the cost of acquisition of land (where land acquisition is involved) and half the cost of collecting materials.
Note.
List I
List I
Work administratively approved
Serial No. in order of urgency
Locality
Name of works
Number and date of Government order granting
administrative approval
1
2
3
4
Amount of rough estimate
Amount of detailed estimate
If funds partially provided, amount and
particulars of orders making the grant
Remarks explaining fully and clearly the
necessity and degree of urgency of the work
5
6
7
8
List II
List II
[Works which are considered desirable but have been] received administrative approval
Serial No. in order of urgency
Locality
Name of work
Amount of rough estimate
Remarks explaining fully and clearly the
necessity and degree of urgency of the work
1
2
3
4
5
Imperial Public Works
Section 274 • Bihar Board's Miscellaneous Rules, 1958
274. Powers of administrative approval of Civil and Public Works Officers.
bihar-board-s-miscellaneous-rules-1958-sec-274.json
•
Section 274
{
"act_title": "Bihar Board's Miscellaneous Rules, 1958",
"act_slug": "bihar-board-s-miscellaneous-rules-1958",
"section_label": "Section",
"section": {
"number": "274",
"title": "274. Powers of administrative approval of Civil and Public Works Officers.",
"chapter": null,
"content": "Section I\nSection I\nOriginal works other than residential buildings and individual projects of water-supply and sanitary and electrical installations\nAuthority to whom the power is delegated\nExtent of powers delegated.\nChief Engineers\n(a)\nRs. 10,000 for non-residential buildings belonging to his\n\t\t\t\tdepartment, the cost of which is debitable to the Public Works\n\t\t\t\tGrant.\n(b)\nRs. 5,000 for Miscellaneous works belonging to his department,\n\t\t\t\tthe cost of which is debitable to the Public Works Grant.\nChief Engineer (B. and R.)\n(c)\nRs. 10,000 for Communication Works.\nSuperintending Engineers\n(a)\nRs.5,000 for non-residential buildings belonging to his\n\t\t\t\tdepartment, the cost of which is debitable to the Public Works\n\t\t\t\tGrant.\n(b)\nRs. 2,500 for Miscellaneous works belonging to his department,\n\t\t\t\tthe cost of which is debitable to the Public Works Grant.\nSuperintending Engineers (B. & R.)\n(c)\nRs. 10,000 for Communication Works.\n1.\nThe Board of Revenue\n...\nRs. 10,000 for non-residential buildings belonging to his\n\t\t\t\tdepartment, the cost of which is debitable to Public Works Grant.\n2.\nThe Registrar, High Court, Patna\n...\n3.\nThe Director of Public Instruction\n...\n4.\nThe Inspector-General of Police\n...\n5.\nThe Inspector-General of Prisons\n...\n6.\nThe Inspector-General of Registration\n...\n7.\nThe Director of Health Services\n...\n8.\nThe Commissioner of Commercial Taxes\n...\n9.\nThe Commissioner of Labour\n...\n10.\nThe Commissioner of Excise\n...\n11.\nThe Chief Conservator of Forests\n...\n12.\nThe Registrar of Co-operative Societies\n...\n13.\nThe Director of Agriculture\n...\n14.\nThe Director of Animal Husbandry\n...\n15.\nThe Director of Industries\n...\n16.\nThe Cane Commissioner\n...\n17.\nThe Commissioners of Divisions\n...\n18.\nThe District and Sessions Judges, including Judicial\n\t\t\t\tCommissioner, Chota Nagpur Division\nRs. 5000\n]\nFor non-residential buildings belonging to his department, the\n\t\t\t\tcost of which is debitable to the Public Works Grant.\n19.\nThe District Magistrates and Collectors and Deputy\n\t\t\t\tCommissioner.\nRs. 2,500\nNote. - (i) Power delegated is inclusive of water-supply, sanitary and electrical installations where such works form part of the main buildings project.\nNote.\n(ii) Communication works include works on roadside Inspection Bungalows, Rest Houses, etc.\n(iii) In the case of State Highways, the approval of the Commissioner of the Division should be obtained before any material change is made in the alignment of roads.\n(iv) Power delegated to Commissioners of Divisions includes works on Circuit Houses.\n(v) Power delegated will not apply to works on the following non-residential buildings:-\n(a) Secretariat buildings at Patna and Ranchi and temporary barracks adjoining the Secretariat compound at Patna.\n(b) Legislature buildings (both Assembly and Council) at Patna.\n(c) High Court buildings at Patna.\n(d) Buildings used for residential purpose but are classified as non-residential, e.g., police barracks, hostels peons, barracks, etc.\n(vi) Government in the Public Works Department will accord administrative approval to all works relating to buildings mentioned at (v)(a) and (b). As regards works relating to the buildings mentioned at (v)(c) administrative approval will be accorded by the Government in the Law Department and at (v)(d) by the administrative department concerned.\nSection II\nSection II\nResidential Buildings\n(a) residences in the New Capital Area at Patna;\n(b) chambers, quarters, flats (including Legislature's club), etc. meant for the members of both houses of Legislature at Patna;\n(c) residences at Ranchi intended for occupation by Ministers, the gazetted officers of the Secretariat, and the Heads of Departments and the gazetted officers attached to their offices;\n(d) clerks' quarters at Ranchi intended for occupation by the ministerial staff accompanying Government and Heads of Departments to Ranchi.\nNote 1. - The area of the New Capital is defined in the map forwarded with this Department Memo No. 9577-85.A.R., dated the 7th June, 1927, to all Departments of Government and includes the residences in the Patna-Gaya Road, Chhajubagh and near about the Race Course (now Gandhi Maidan), Bankipur.\nNote 1.\nNote 2. - The word \"Residence\" does not include the clerks' quarters at Patna.\nNote 2.\nAuthority to whom the power is delegated\nExtent of power delegated\n1.\nThe Board of Revenue\n...\nRs. 7,500\n2.\nThe Registrar, High Court, Patna\n...\n3.\nThe Director of Public Instruction\n...\n4.\nThe Inspector-General of Police\n...\n5.\nThe Inspector-General of Prisons\n...\n6.\nThe Inspector-General of Registration\n...\n7.\nThe Director of Health Services\n...\n8.\nThe Commissioner of Commercial Taxes\n...\n9.\nThe Commissioner of Excise\n...\n10.\nThe Commissioner of Labour\n...\n11.\nThe Chief Conservator of Forests\n...\n12.\nThe Registrar of Co-operative Societies\n...\n13.\nThe Director of Agriculture\n...\n14.\nThe Director of Animal Husbandry\n...\n15.\nThe Director of Industries\n...\n16.\nThe Cane Commissioner\n...\n17.\nThe Transport Commissioner\n...\n18.\nThe Commissioners of Divisions\n...\n19.\nThe Chief Engineers\n...\n20.\nThe Superintending Engineers\n...\nRs. 5,000\nNote 1. - The Inspector-General of Police has power to pass excess in the standard rent over 10 per cent of the average emoluments of the officers, subordinate to him.\nNote 1.\n[Vide Finance Department's Memo No. 11361-F., dated the 26th November, 1935].\nNote 2. - (i) Power delegated is inclusive of the Water-Supply, Sanitary and Electrical Installation where such works are parts of the main buildings projects.\nNote 2.\n(ii) Power delegated above will not apply to any new work and also of work of addition or alteration to existing residential buildings and quarters occupied free of rent.\nSection III\nSection III\nIndividual projects of water-supply, sanitary and electrical installations\n(A) Non-Residential Buildings\nAuthority to whom the power is delegated\nExtent of power delegated\nWater-supply or sanitary installation\nElectrical installation\n1.\nThe Board of Revenue\n...\nRs. 5,000\nRs. 1,000\n2.\nThe Registrar, High Court\n...\n3.\nThe Director of Public Instruction\n...\n4.\nThe Inspector-General of Police\n...\n5.\nThe Inspector-General of Prisons\n...\n6.\nThe Inspector-General of Registration\n...\n7.\nThe Director of Health Services\n...\n8.\nThe Commissioner of Commercial Taxes\n...\n9.\nThe Commissioner of Excise\n...\n10.\nThe Commissioner of Labour\n...\n11.\nThe Chief Conservator of Forests\n...\n12.\nThe Registrar of Co-operative Societies\n...\n13.\nThe Director of Agriculture\n...\n14.\nThe Director of Animal Husbandry\n...\n15.\nThe Director of Industries\n...\n16.\nThe Chief Engineers\n...\n17.\nThe Commissioners of Divisions\n...\n18.\nThe Cane Commissioner\n...\n19.\nThe Superintending Engineers and District and Sessions Judges,\n\t\t\t\tincluding Judicial Commissioner, Chota Nagpur Division\n...\nRs. 2,500\nRs. 500\n20.\nDistrict Magistrates and Deputy Commissioners\n...\nRs. 1,000\nRs. 250\nNote. - (i) Powers delegated will apply to those non-residential buildings only the cost of which is debitable to the Public Works Grant.\nNote.\n(ii) Powers delegated will not apply to non-residential buildings mentioned in note (v)(d) below paragraph 2.\n(iii) Power delegated to Commissioners of Divisions includes works in Circuit Houses.\n(B) Residential Buildings\nAuthority to whom the power is delegated\nExtent of power delegated\nWater-supply or sanitary installation\nElectrical Works\n1.\nThe Board of Revenue\n...\nRs. 2,500\nRs. 500\n2.\nThe Registrar, High Court\n...\n3.\nThe Director of Public Instruction\n...\n4.\nThe Inspector-General of Police\n...\n5.\nThe Inspector-General of Prisons\n...\n6.\nThe Inspector-General of Registration\n...\n7.\nThe Director of Health Services\n...\n8.\nThe Commissioner of Commercial Taxes\n...\n9.\nThe Commissioner of Excise\n...\n10.\nThe Commissioner of Labour\n...\n11.\nThe Chief Conservator of Forests\n...\n12.\nThe Registrar of Co-operative Societies\n...\n13.\nThe Director of Agriculture\n...\n14.\nThe Director of Animal Husbandry\n...\n15.\nThe Director of Industries\n...\n16.\nThe Cane Commissioner\n...\n17.\nThe Transport Commissioner\n...\n18.\nThe Commissioners of Divisions\n...\n19.\nChief Engineers\n...\n20.\nSuperintending Engineers\n...\nRs. 1,000\nRs. 250\nNote. - (i) Powers delegated will apply to works on those residential buildings only, the cost of which is debitable to the Public Works Grant.\nNote.\n(ii) Powers delegated will not apply to residential buildings mentioned at paragraph 3 and note (ii) below paragraph 4.\nSection IV\nSection IV\nRs.\n(1)\nChief Engineers\n...\n10,000\n(2)\nSuperintending Engineers\n...\n5,000\n(3)\nExecutive Engineers\n...\n200\nNote. - The above limits exclude departmental charges.\nNote.\nSection V\nSection V\nTechnical Sanction\n(i) administrative approval has been accorded by the competent authority.\n(ii) the report prefacing the estimates and the principal plan attached thereto have been countersigned by the Civil Officers or the Head of Department concerned-\n(a) All Executive Engineers (including P.H.E. and Electricity Departments)-Rs. 5,000.\n(b) All Superintending Engineers (including P.H.E. and Electricity Departments)-Rs. 1,00,000.\n(c) All Chief Engineers (including PH.E. and Electricity Departments)-Full powers.\nNote 1. - The above limit excludes departmental charges.\nNote 1.\nNote 2. - These powers apply to Deposit works also.\nNote 2.\nSection VI\nSection VI\nProcedure for calling plans and estimates for purposes of Administrative approval\n(b) The Civil Officer, with the consent of the Head of the Department or Administrative Department concerned, may also call for plans and estimates for independent electrical project from the Executive Engineer, Electrical Works Division and for Sanitary and Water-Supply projects from the Executive Engineer, Public Health Engineering Department.\n(b) Ordinarily, the Public Works Department Officer shall submit the plans and estimates to the requisitioning officer within four months from the date of requisition.\n(c) Whenever a new building is to be constructed or an existing building is to be extended or improved and it is intended to provide with Electrical or Sanitary and Water-Supply installations or both, the requisitioning officer will call for plans and estimates from the P.W. (R. and B.) officers. In such cases, the Executive Engineer in charge of the buildings will obtain the estimated cost of the electrical and Public Health portion of the project from the Executive Engineer, Electric Works Division and Executive Engineer, Public Health Engineering Department and will include the same in the total cost of the project. Thereafter, he will send the consolidated project to the requisitioning officer concerned. In case of works costing above Rs. 5.000 and up to Rs. 1,00,000 the consolidated project will be prepared by the Superintending Engineer. P.W. (R. and B.) Department who will send the same to the requisitioning officer direct. For work costing above Rs. 1,00,000 the Superintending Engineers will submit plans and estimates for their respective portions of work to the respective Chief Engineers and the Chief Engineer, Public Health Engineering Department and the Chief Engineer, Electricity Department will after necessary scrutiny and check forward their portions of the plans and estimates to the Chief Engineer, Roads and Buildings, for consolidation. The latter will then forward the same to the requisitioning Heads of Departments.\n(i) In case of residential projects, the Administrative Department shall refer the project to the P.W.D. for examination with reference to the admissible outlay on the basis of average pay and the provisional rent statement (both of which should invariably accompany the reference) and thereafter accord administrative approval to the project with the concurrence of Finance Department.\n(ii) In case of non-residential project, the concurrence of Finance Department will only be necessary prior to giving administrative approval to the project.\nNote. - The cases, where only Water-Supply and Sanitary Installations are to be provided in a building, shall be referred to the Public Health Engineering Department by the Administrative Department for examination of rent implication, etc., but in case of Electric installation to a building, Public Works (R. and B.) Department will be consulted as usual for rent implications, etc.\nNote.\nSection VII\nSection VII\nAllotment of funds for Minor Works\nRs. P.\nAllotment available for the year\n...\n...\nLess sanctioned previously\n...\n...\nAmount of this sanction\n...\n...\nBalance of allotment still available\n...\n...\nSection VIII\nSection VIII\nFunds for Major Works\n(ii)(a) The schedule of demand with regard to the building portion of the project or/and Electrical installation thereto shall be referred to the Public Works (B. and R.) Department for concurrence as usual as the Chief Engineer (B. and R.) is the controlling officer of the budget under the head \"50-Civil Works\" to which the cost of electrification of Government building is also chargeable. No reference to Public Works (B. and R.) Department will, however, be necessary in case of an independent project concerning Water-Supply and Sanitary installation to a building.\nNote. - The Chief Engineer (B. and R.) shall be competent to obtain demand from the Electrical Executive Engineer in respect of funding of electricity projects.\nNote.\n(b) The Administrative Department shall make separate reference direct to the Public Health Engineering Department for concurrence in the schedule of demand in respect of an independent Water-Supply and Sanitary installations to a building as well as to the Public Health portion of a building project as the cost for such portion of work is debitable to the Head \"39-Public Health\" the budget of which is controlled by the Public Health Engineering Department.\nSection IX\nSection IX\nRevised administrative approval\n275.\nNote. - With a view to present large savings occurring in the Provincial Public Works budgets against the sanctioned grants the Government of Bihar in the Public Works Department have, in accordance with the recommendations of the Public Accounts Committee, directed that in case of large building projects costing Rs. 50,000 or more the budget provision should, in the year, be ordinarily limited to the cost of acquisition of land (where land acquisition is involved) and half the cost of collecting materials.\nNote.\nList I\nList I\nWork administratively approved\nSerial No. in order of urgency\nLocality\nName of works\nNumber and date of Government order granting\n\t\t\t\tadministrative approval\n1\n2\n3\n4\nAmount of rough estimate\nAmount of detailed estimate\nIf funds partially provided, amount and\n\t\t\t\tparticulars of orders making the grant\nRemarks explaining fully and clearly the\n\t\t\t\tnecessity and degree of urgency of the work\n5\n6\n7\n8\nList II\nList II\n[Works which are considered desirable but have been] received administrative approval\nSerial No. in order of urgency\nLocality\nName of work\nAmount of rough estimate\nRemarks explaining fully and clearly the\n\t\t\t\tnecessity and degree of urgency of the work\n1\n2\n3\n4\n5\nImperial Public Works",
"footnote": "",
"is_definition": false,
"sort_order": 271
},
"prev_section": "273",
"next_section": "276"
}