(1) The selection of a site for a proposed building must be dealt with as soon as a demand is received for an estimate from an officer authorised to call for it.
(2) As soon as demand for an estimate as in paragraph (1) or administrative approval to an estimate sent under (1)(a) is received the Executive Engineer shall in consultation with the District Magistrate and the local Head of the Department concerned select a site for the proposed building and make out the usual plans.
(3) The Executive Engineer will be responsible that the site selected is suitable for building on.
(4) If the site selected is on land already in charge of the Public Works Department, the site plan will be signed by the Superintending Engineer before the estimate is sent up for technical sanction.
(5) In cases where there is difference of opinion regarding the suitability for a site among the officers referred to in Rule (2) the matter will be referred by the Superintending Engineer to the Commissioner of the Division, whose decision shall be final in the case of provincial buildings but in the case of central buildings the decision of the Government of India is necessary.
(6) When the site is within a municipality or controlled area, the signature of the Chairman of the municipality or of the President of the local committee, will be necessary before technical sanction is given.
Note 1. - In the case of buildings proposed to be constructed at Ranchi and Doranda (including Hinoo) the site plan or the proceedings of the site committee or both, as the case may be, should be submitted through the administrative department concerned for the approval of the Provincial Government.
Note 1.
Note 2. - The Public Works Department (Road and Buildings) representative on site committee is there to advice the committee on the engineering aspects of the site just as the Civil Surgeon is there to advise on the hygiene aspects. Generally speaking in the province, the more important engineering points are :
Note 2.
(a) Is the site swampy, low or liable to flood?
(b) Is the soil suitable for foundations or will special treatment be necessary in the case of-
(1) soil liable to expansion and contraction, or soil of an abnormal nature.
(2) made ground.
(c) Is the building oriented in the right direction with reference to-
(1) the view,
(2) ventilation,
(3) verandah protection,
(4) orientation of rooms required for specific purposes.
(d) Is the site suitable for excavation of a well?
Section 256 • Bihar Board's Miscellaneous Rules, 1958
256. Selection of sites for Central and Provincial buildings cost of which is less than Rs. 5,000.
bihar-board-s-miscellaneous-rules-1958-sec-256.json
•
Section 256
{
"act_title": "Bihar Board's Miscellaneous Rules, 1958",
"act_slug": "bihar-board-s-miscellaneous-rules-1958",
"section_label": "Section",
"section": {
"number": "256",
"title": "256. Selection of sites for Central and Provincial buildings cost of which is less than Rs. 5,000.",
"chapter": null,
"content": "(1) The selection of a site for a proposed building must be dealt with as soon as a demand is received for an estimate from an officer authorised to call for it.\n(2) As soon as demand for an estimate as in paragraph (1) or administrative approval to an estimate sent under (1)(a) is received the Executive Engineer shall in consultation with the District Magistrate and the local Head of the Department concerned select a site for the proposed building and make out the usual plans.\n(3) The Executive Engineer will be responsible that the site selected is suitable for building on.\n(4) If the site selected is on land already in charge of the Public Works Department, the site plan will be signed by the Superintending Engineer before the estimate is sent up for technical sanction.\n(5) In cases where there is difference of opinion regarding the suitability for a site among the officers referred to in Rule (2) the matter will be referred by the Superintending Engineer to the Commissioner of the Division, whose decision shall be final in the case of provincial buildings but in the case of central buildings the decision of the Government of India is necessary.\n(6) When the site is within a municipality or controlled area, the signature of the Chairman of the municipality or of the President of the local committee, will be necessary before technical sanction is given.\nNote 1. - In the case of buildings proposed to be constructed at Ranchi and Doranda (including Hinoo) the site plan or the proceedings of the site committee or both, as the case may be, should be submitted through the administrative department concerned for the approval of the Provincial Government.\nNote 1.\nNote 2. - The Public Works Department (Road and Buildings) representative on site committee is there to advice the committee on the engineering aspects of the site just as the Civil Surgeon is there to advise on the hygiene aspects. Generally speaking in the province, the more important engineering points are :\nNote 2.\n(a) Is the site swampy, low or liable to flood?\n(b) Is the soil suitable for foundations or will special treatment be necessary in the case of-\n(1) soil liable to expansion and contraction, or soil of an abnormal nature.\n(2) made ground.\n(c) Is the building oriented in the right direction with reference to-\n(1) the view,\n(2) ventilation,\n(3) verandah protection,\n(4) orientation of rooms required for specific purposes.\n(d) Is the site suitable for excavation of a well?",
"footnote": "",
"is_definition": false,
"sort_order": 252
},
"prev_section": "255",
"next_section": "257"
}