35. Industrial buildings.

Open Space (Setbacks) And The F.A.R. For Industrial Buildings
Open Space (Setbacks) And The F.A.R. For Industrial Buildings
Table-10
Table-10
Plot size in sq.m
Front setback in meters
Rear setback in meters
Site setback in meters
FAR
Maximum coverage
Up to 500
4.0
3.0
3.0
0.6
50%
+ 500 to 1000
6.0
4.5
4.5
0.6
50%
+ 1000 to 5000
9.0
5.0
5.0
0.6
45%
+ 5000 to 30000
9.0
9.0
6.0
0.5
40%
Above 30,000
15.0
15.0
1.0
0.4
40%
Minimum Distances Required For Storage Shed of Liquified Petroleum Gas Cylinders
Minimum Distances Required For Storage Shed of Liquified Petroleum Gas Cylinders
Table-11
Table-11
Quantity of Compressed Gas in cylinders (Kg.)
Quantity of Compressed Gas in cylinders (Kg.)
Minimum distance to be kept clear (meters)
Minimum distance to be kept clear (meters)
0-100
1
101-1000
3
1001-4000
5
4001-8000
7
8001-12000
9
12001-30,000
12
Over 30,300
15