Schedule - THE SECOND SCHEDULE

THE SECOND SCHEDULE
[See section 15 (1)]
DIVISION OF MAINTENANCE RESPONSIBILITY BETWEEN THE LANDLORD AND THE TENANTS
Unless otherwise agreed in the tenancy agreement, the landlord shall be responsible for repairs relating to matters falling under Part - A and the tenant shall be responsible for matters falling under Part - B.
Part - A
Responsibilities of the Landlord:
1. Structural repairs except those necessitated by damage caused by the tenant.
2. Whitewashing of walls and painting of doors and windows.
3. Changing and plumbing pipes when necessary.
4. Internal and external electrical wiring and related maintenance when necessary.
Part - B
Periodic repairs to be got done by the tenant:
1. Changing of tap washers and taps.
2. Drain cleaning.
3. Water closet repairs.
4. Wash Basin repairs.
5. Bath tub repairs.
6. Geyser repairs.
7. Circuit breaker repairs
8. Switches and socket repairs.
9. Repairs and replacement of electrical equipment except major internal and external wiring changes.
10. Kitchen fixtures repairs.
11. Replacement of knobs and locks of doors, cupboard, windows etc.
12. Replacement of fly-nets.
13. Replacement of glass panels in windows, doors etc.
14. Maintenance of gardens and open spaces let out to or used by the tenant.